Compute·Atlas

Section

Supercomputers

The ranking is a solved problem and we are not competing on it. What nobody publishes is the layer underneath: which company supplied each accelerator, CPU, fabric and cabinet; which corporate parent that supplier rolls up to after thirty years of consolidation; and which listed ticker therefore carries the exposure. Every system here is a node in a parts graph, not a row in a table.

Phase 1 seed dataset — under review. These rows were compiled by hand from public operator, laboratory and vendor sources, and have not yet been through a second-reader verification pass. Every claim carries its source and a confidence tier; treat anything below verified as a lead, not a citation.

Systems
21
13 operational
Countries
6
Aggregate Rmax
6.60 EFlop/s
as last reported
Aggregate power
231.53 MW
where disclosed
Span
1993–2024
first list to present

Accelerator share, weighted by FLOPS

Machine-count share is the figure everyone quotes, and it understates whoever supplies the largest systems. Weighted by installed Rmax across the systems in this dataset, the picture is different. Supplier is rolled up to the corporate parent that owns it today.

Accelerator supplier (today's parent)Installed RmaxShareDistribution
AMD 3.47 EFlop/s 52.7%
NVIDIA 1.50 EFlop/s 22.7%
Intel 1.04 EFlop/s 15.8%
No accelerator (CPU-only) 547.8 PFlop/s 8.3%
NUDT 30.72 PFlop/s 0.5%
IBM 1.03 PFlop/s 0.0%
How this was calculated

Each system contributes its last publicly reported Rmax once. Where a system has more than one accelerator supplier — which happens when a machine was rebuilt with different silicon, as Tianhe-2 was — its FLOPS are split evenly between them rather than double-counted. Systems with no accelerator edge, such as Fugaku and the K computer, are shown as a CPU-only bucket rather than dropped, because dropping them is the most common way this chart is drawn wrong elsewhere.

Suppliers are rolled up through vendor_aliases to the parent that owns them today, so Mellanox's EDR fabric counts toward NVIDIA and Cray's Gemini counts toward HPE. Aggregates over a 21-system seed are illustrative, not market share. The full treatment, over the complete historical backfill, is Phase 2.

Systems

Ranked and unranked systems carried in one taxonomy, newest first. Confidence is per-system and every claim on the page behind it carries its own source.

SystemOperatorCountry RmaxPower AcceleratorInterconnectStatusRank
El Capitan
2024-11
Lawrence Livermore National Laboratory USA 1.74 EFlop/s 29.58 MW AMD Instinct MI300A HPE Slingshot-11 Operational #1 November 2024 →
Alps
2024-03
CSCS Switzerland 434.9 PFlop/s 7.12 MW NVIDIA GH200 Grace Hopper Superchip HPE Slingshot-11 Operational #6 June 2024 →
Aurora
2023-12
Argonne National Laboratory USA 1.01 EFlop/s 38.70 MW Intel Data Center GPU Max 1550 HPE Slingshot-11 Operational #2 November 2023 →
Eagle
2023-11
Microsoft USA 561.2 PFlop/s NVIDIA H100 SXM5 NVIDIA InfiniBand NDR (Quantum-2) Operational #3 November 2023 →
Leonardo
2022-11
CINECA Italy 241.2 PFlop/s 7.49 MW NVIDIA A100 SXM4 64GB NVIDIA InfiniBand HDR Upgraded in place #4 November 2022 →
LUMI
2022-06
CSC Finland 379.7 PFlop/s 7.11 MW AMD Instinct MI250X HPE Slingshot-11 Upgraded in place #3 June 2022 →
Frontier
2022-05
Oak Ridge National Laboratory USA 1.35 EFlop/s 24.61 MW AMD Instinct MI250X HPE Slingshot-11 Upgraded in place #1 June 2022 →
Fugaku
2020-06
RIKEN Japan 442.0 PFlop/s 29.90 MW none Fujitsu Tofu Interconnect D Operational #1 June 2020 →
Summit
2018-06
Oak Ridge National Laboratory USA 148.6 PFlop/s 10.10 MW NVIDIA Tesla V100 Mellanox InfiniBand EDR Decommissioned #1 June 2018 →
Sierra
2018-06
Lawrence Livermore National Laboratory USA 94.64 PFlop/s 7.44 MW NVIDIA Tesla V100 Mellanox InfiniBand EDR Operational #3 June 2018 →
Sunway TaihuLight
2016-06
National Supercomputing Center in Wuxi China 93.01 PFlop/s 15.37 MW none Sunway interconnect Operational #1 June 2016 →
Tianhe-2A
2013-06
National Supercomputer Center in Guangzhou China 61.44 PFlop/s 18.48 MW Intel Xeon Phi 31S1P NUDT TH Express-2 Upgraded in place #1 June 2013 →
Titan
2012-11
Oak Ridge National Laboratory USA 17.59 PFlop/s 8.21 MW NVIDIA Tesla K20X Cray Gemini Decommissioned #1 November 2012 →
K computer
2011-06
RIKEN Japan 10.51 PFlop/s 12.66 MW none Fujitsu Tofu Interconnect Decommissioned #1 June 2011 →
Tianhe-1A
2010-11
National Supercomputing Center in Tianjin China 2.57 PFlop/s 4.04 MW NVIDIA Tesla M2050 NUDT Arch interconnect Operational #1 November 2010 →
Jaguar
2009-11
Oak Ridge National Laboratory USA 1.76 PFlop/s 6.95 MW none Cray SeaStar2+ Upgraded in place #1 November 2009 →
Roadrunner
2008-06
Los Alamos National Laboratory USA 1.03 PFlop/s 2.35 MW IBM PowerXCell 8i Mellanox InfiniBand DDR Decommissioned #1 June 2008 →
BlueGene/L
2004-11
Lawrence Livermore National Laboratory USA 478.20 TFlop/s 1.43 MW none IBM BlueGene 3D torus Decommissioned #1 November 2004 →
Earth Simulator
2002-03
JAMSTEC Japan 35.86 TFlop/s none NEC Earth Simulator crossbar Decommissioned #1 June 2002 →
ASCI Red
1997-06
Sandia National Laboratories USA 1.07 TFlop/s none Intel ASCI Red mesh Decommissioned #1 June 1997 →
CM-5/1024
1993-06
Los Alamos National Laboratory USA 59.7 GFlop/s none Thinking Machines CM-5 fat tree Decommissioned #1 June 1993 →

The Rank column links out to the canonical entry on top500.org. We store rank and edition as a pointer and never reproduce a ranked table — see sourcing policy.