COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/Maverick (TACC)

USA · operational · hpc

Maverick (TACC)

Also known as Maverick

Operated by Texas Advanced Computing Center at Texas Advanced Computing Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
158.10 TFlop/s
HPL measured
Rpeak
247.90 TFlop/s
Rmax ÷ Rpeak
63.8%
Cores
4,620
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
132 HP ProLiant SL250s Gen8 compute nodes
Hewlett Packard Enterprise 132
reported
Reported top500.orgnews.utexas.edu
Accelerator -
One NVIDIA Tesla K40 per compute node
NVIDIA 132
estimated
Reported top500.orgnews.utexas.edu
CPU -
Two 10-core Intel Xeon E5-2680 v2 per compute node
Intel 264
estimated
Reported top500.orgnews.utexas.edu
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
Mellanox FDR InfiniBand
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.orgnews.utexas.edu

The read

TACC's interactive visualization and data-analytics resource, announced 19 Nov 2013 with HP and NVIDIA for deployment in January 2014 to replace Longhorn (longhorn) and complement Stampede (stampede). The announcement describes 132 HP ProLiant SL250s Gen8 compute nodes plus 14 management, login and Lustre-router servers in five racks; each compute node has two 10-core Xeon E5-2680 v2 CPUs, one NVIDIA Tesla K40, 256 GB of DDR3-1866 memory and Mellanox FDR InfiniBand, attached to the 20 PB Stockyard global file system. The TOP500 entry (Jun 2014 rank 397, Nov 2014 rank 474) lists 4,620 cores, Rmax 158.1 TF and Rpeak 247.9 TF and points to TACC's Maverick user guide. The announcement gives January 2014 as the planned deployment month and no later page confirmed the production date, so only the year is recorded.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Texas Advanced Computing Center

Location
Austin, TX, USA
Cooling
Direct liquid cooling
Commissioned
2007

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
news.utexas.edunames system and partMellanox InfiniBand FDR
top500.orgnames system and partMellanox InfiniBand FDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading