Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 36.62 TFlop/s
- Rpeak
- 44.24 TFlop/s
- Rmax ÷ Rpeak
- 82.8%
- Cores
- 9,216
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Atlas (LLNL), and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 36.62 TFlop/s | #66 of 112 · bottom 42% | #270 of 332 · bottom 20% |
| Rmax ÷ Rpeak | 82.8 % | #34 of 112 · top 30% | #75 of 331 · top 22% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Appro Xtreme Server nodes, 1,152 nodes | Appro HPENYSE
rolls up to Hewlett Packard Enterprise | 1,152 reported | Reported | hpc.llnl.govtop500.org |
| CPU | - Four dual-core AMD Opteron 2.4 GHz Socket F processors per node | AMD | 9,216 reported | Reported | hpc.llnl.govtop500.org |
Engineering, funding and access
What Atlas (LLNL) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,152 nodesPeloton table in LLNL's cluster tutorial: 1,152 nodes, 9,216 cores and 44.2 TFlop/s in the OCF zone. | 2026-11 | Operator stated | hpc.llnl.gov |
| Interconnect and topology | Two-stage 4x DDR InfiniBand at 20 Gb/s, Voltaire edge and spine switches with Mellanox dual-port HCAsAppro's Peloton award release describes the fabric for all Peloton clusters; LLNL's tutorial lists Atlas as a Peloton cluster. | 2006-06-27 | Vendor stated | linux.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | Multiprogrammatic and Institutional Computing (M&IC) in the unclassified environmentAppro's release assigns the unclassified Peloton clusters to M⁣ LLNL's tutorial places Atlas in the OCF zone. | 2006-06-27 | Vendor stated | linux.comhpc.llnl.gov |
| Procurement | Peloton: RFP released in early 2006 and contract awarded to Appro in June 2006 for clusters built from 5.5 TFlop/s scalable units of about 144 nodes | 2006-06 | Operator stated | hpc.llnl.govlinux.com |
The read
One of six Peloton clusters Livermore bought after awarding Appro the contract in June 2006: 1,152 nodes of four dual-core 2.4 GHz Opterons each (9,216 cores, 44.2 TFLOPS peak) on 4x DDR InfiniBand. LLNL's cluster tutorial says the last Peloton clusters were retired in June 2012 but gives no date for Atlas alone. TOP500 ranks it 19th on the June 2007 list at 36.62 TFLOPS Rmax and 44.24 peak and credits Cray/HPE as manufacturer, reflecting Appro's later acquisition. The Rmax is from TOP500 alone, so the tier is reported.
Timeline
- 2006-06-27 Appro announced it had won LLNL's Peloton project, the procurement that produced Atlas source
- 2007 First operational source
- 2007-06 Listed at #19 on the TOP500 (June 2007) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Change history
- 2026-10-02 Added Atlas, a Livermore Peloton Opteron cluster
Nearby in scale
The machines closest to Atlas (LLNL) by Rmax, smaller to larger.
- Stokes · Ireland, decommissioned · 0.04 PFlop/s
- Earth Simulator · Japan, decommissioned · 0.04 PFlop/s
- VSC-1 · Austria, decommissioned · 0.04 PFlop/s
- JUBL · Germany, decommissioned · 0.04 PFlop/s
- Galera · Poland, decommissioned · 0.04 PFlop/s
- TSUBAME1.0 · Japan, decommissioned · 0.04 PFlop/s
Related systems
Same site
- ASC Purple · USA, decommissioned, 2005
- Hera (LLNL) · USA, operational, 2009
- BlueGene/L · USA, decommissioned, 2004
- Edge (LLNL) · USA, operational, 2010
- Thunder · USA, decommissioned, 2004
- Zin · USA, decommissioned, 2011
Same operator
- Cab · USA, decommissioned, 2012
- MCR · USA, decommissioned, 2002
- Sequoia · USA, decommissioned, 2012
- Vulcan · USA, decommissioned, 2012
- ASCI White · USA, decommissioned, 2000
- ASCI Blue-Pacific · USA, decommissioned, 1998
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.llnl.gov | names system only | - |
| top500.org | names system only | - |