Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 24.38 PFlop/s
- Rpeak
- 32.10 PFlop/s
- Rmax ÷ Rpeak
- 76.0%
- Cores
- 129,024
- Power
- 388.2 kW
- Per watt
- 62.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of rzAdams, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 24.38 PFlop/s | #75 of 234 · top 32% | #25 of 332 · top 7% |
| Energy efficiency | 62.8 GF/W | #12 of 121 · top 9% | #3 of 162 · top 1% |
| Rmax ÷ Rpeak | 76.0 % | #105 of 231 · top 45% | #149 of 331 · top 45% |
| Power draw | 388 kW | #74 of 126 · bottom 43% | #102 of 171 · bottom 42% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX255a | Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | AMD Instinct MI300A Accelerators ROCm (CDNA 3) · TSMC N5/N6 · 550 W AMD Instinct MI300A | AMD | - | Verified | top500.orghpc.llnl.gov |
| CPU | AMD 4th Gen EPYC 24C (in MI300A) CPUs x86-64 · 24C · 1.8 GHz · TSMC N5 AMD 4th Gen EPYC 24C 1.8GHz | AMD | - | Verified | top500.orghpc.llnl.gov |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Verified | top500.orghpc.llnl.gov |
| Operating system | Tri-Lab Operating System Stack Operating systems Linux distribution, RHEL-derived, HPC-tuned · Open source, LLNL-maintained TOSS | Lawrence Livermore National Laboratory | - | Verified | top500.orghpc.llnl.gov |
Engineering, funding and access
What rzAdams runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 128 nodes102 batch, 24 debug and 2 login nodes; 4 AMD MI300A per compute node, 512 APUs in total | 2025 | Operator stated | hpc.llnl.gov |
| Total memory | 64 TBLLNL lists 65,536 GiB total, which is 64 TiB, with 512 GiB per node | 2025 | Operator stated | hpc.llnl.gov |
| Interconnect and topology | HPE Slingshot-11 | 2025 | Operator stated | hpc.llnl.gov |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Parallel Lustre space under /p/lustre plus RZ scratch | 2025 | Operator stated | hpc.llnl.gov |
| Job scheduler | FluxNode-scheduled; pdev and plarge pools alternate on the 102 batch nodes, pdebug has 24 nodes, pci is for GitLab CI | 2025 | Operator stated | hpc.llnl.gov |
| Programming and software stack | TOSS 4 operating system | 2025 | Operator stated | hpc.llnl.gov |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | Advanced Simulation and Computing (ASC) program, platform class ATS-4Located in the restricted (RZ) zone at LLNL | 2025 | Operator stated | hpc.llnl.gov |
The read
An NNSA ATS-4 tri-lab AMD MI300A system in LLNL's Restricted Zone. LLNL's own hardware page independently states a combined CPU+GPU peak of 32.102 PFlops, matching TOP500's 32.10 Rpeak almost exactly, and independently confirms the MI300A/4th-gen-EPYC/Slingshot-11/TOSS architecture; it also resolves an apparent core-count anomaly: TOP500's 129,024 cores is the sum of 12,288 CPU cores and 116,736 GPU compute units (512 MI300As × 228 CUs), not CPU cores alone. Rmax and power draw are not independently republished, so those two facts stay TOP500-sourced within an otherwise verified row.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Change history
- 2026-09-22 Gained a Green500 rank pointer (#10 on the 2024-11 list)
Nearby in scale
The machines closest to rzAdams by Rmax, smaller to larger.
Related systems
Same site
- El Capitan · USA, operational, 2024
- Bengal · USA, operational, 2023
- Dane · USA, operational, 2023
- Matrix · USA, operational, 2025
- RZHound · USA, operational, 2023
- Tuolumne · USA, operational, 2025
Same operator
- Lynx (LLNL) · USA, operational, 2026
- Neo · USA, operational, 2026
- rzVernal · USA, operational, 2022
- Tenaya · USA, operational, 2022
- Tioga · USA, operational, 2022
- Magma (LLNL) · USA, operational, 2020
Same accelerator
- Adastra 2 · France, operational, 2024
- AMD Ouranos · France, operational, 2024
- Blueback · USA, operational, 2024
- El Dorado · USA, operational, 2024
- Portage · USA, operational, 2024
- Santos Dumont · Brazil, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.llnl.gov | names system and part | Tri-Lab Operating System Stack |
| top500.org | names system and part | AMD Instinct MI300A, HPE Slingshot-11 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.