Supercomputers/Systems/Conte
USA · decommissioned · hpc
Conte
Also known as Purdue Conte community cluster
Operated by Purdue University at Purdue RCAC (West Lafayette) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 976.76 TFlop/s
- Rpeak
- 1.34 PFlop/s
- Rmax ÷ Rpeak
- 72.8%
- Cores
- 77,520
- Power
- 510 kW
- Per watt
- 1.9 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Conte, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 976.76 TFlop/s | #66 of 227 · top 29% | #184 of 332 · bottom 46% |
| Energy efficiency | 1.9 GF/W | #53 of 186 · top 28% | #86 of 162 · bottom 48% |
| Rmax ÷ Rpeak | 72.8 % | #156 of 226 · bottom 32% | #181 of 331 · bottom 46% |
| Power draw | 510 kW | #91 of 188 · top 48% | #87 of 171 · bottom 50% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HP ProLiant SL250 Gen8 servers | Hewlett Packard Enterprise | - | Reported | top500.orgrcac.purdue.edu |
| Accelerator | - Intel Xeon Phi 5110P coprocessors | Intel | - | Reported | top500.orgrcac.purdue.edu |
| CPU | Intel Xeon E5-2670 CPUs x86-64 · 8C · 2.6 GHz · 32 nm · 115 W Xeon E5-2670 8C 2.600GHz | Intel | - | Reported | top500.orgrcac.purdue.edu |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond Infiniband FDR | NVIDIA | - | Reported | top500.orgrcac.purdue.edu |
Engineering, funding and access
What Conte runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | 40 Gb/s FDR10 InfiniBandEach node: two 8-core Xeon E5, 64 GB and two 60-core Xeon Phi coprocessors. | 2018-08 | Operator stated | rcac.purdue.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Built through a partnership with HP and Intel in June 2013 as the largest of Purdue's flagship community clusters, with a 5-year warranty | 2018-08 | Operator stated | rcac.purdue.edu |
The read
Purdue's flagship community cluster, built with HP and Intel as 580 ProLiant SL250 Gen8 servers each carrying two Xeon E5-2670 8-core CPUs and two Xeon Phi 5110P coprocessors, 34th on the November 2013 TOP500 (28th in June 2013, the highest campus system). TOP500 lists 77,520 cores on InfiniBand FDR at 976.76 TFlop/s Rmax, 1.341 PFlop/s Rpeak and 510 kW, on every list from June 2013 to November 2018. Purdue's RCAC page independently confirms the HP and Intel collaboration, dual 8-core Xeon E5 CPUs and two 60-core Xeon Phi per node, FDR10 InfiniBand and a service period from 30 July 2013 to 1 August 2018. TOP500 is the only source for Rmax, Rpeak and power, so the tier is reported.
Timeline
- 2013-07-30 First operational source
- 2013-11 Listed at #34 on the TOP500 (November 2013) source
- 2018-08-01 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added Conte, Purdue's HP and Xeon Phi cluster, 34th on the November 2013 TOP500
Nearby in scale
The machines closest to Conte by Rmax, smaller to larger.
- Aleph · South Korea, operational · 0.97 PFlop/s
- AIST AI Cloud · Japan, operational · 0.96 PFlop/s
- AWE Spruce A · United Kingdom, operational · 0.96 PFlop/s
- Raijin (NCI) · Australia, decommissioned · 0.98 PFlop/s
- HOKUSAI GreatWave · Japan, decommissioned · 0.99 PFlop/s
- Konrad (HLRN-III) · Germany, decommissioned · 0.99 PFlop/s
Related systems
Same site
- Carter (Purdue) · USA, decommissioned, 2011
- Rice (Purdue) · USA, decommissioned, 2015
- Bell (Purdue) · USA, operational, 2020
- Anvil · USA, operational, 2022
- Gautschi AI · USA, operational, 2024
Same operator
- Brown (Purdue) · USA, decommissioned, 2017
- Gilbreth (Purdue) · USA, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Intel Xeon E5-2670, Mellanox InfiniBand FDR |
| rcac.purdue.edu | names system and part | Intel Xeon E5-2670, Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.