Supercomputers/Systems/Scafell Pike

United Kingdom · operational · hpc

Scafell Pike

Also known as Hartree Centre Scafell Pike; scafellpike

Operated by STFC Hartree Centre at Hartree Centre Supercomputing Centre (Daresbury) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.83 PFlop/s
HPL measured
Rpeak
4.33 PFlop/s
Rmax ÷ Rpeak
42.3%
Cores
80,640
Power
529 kW
Per watt
3.5 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Bull Sequana X1000
Eviden
ATOEPA rolls up to Atos
- Verified top500.orgwired-gov.net
CPU -
Intel Xeon Gold 6142 nodes and Intel Xeon Phi 7210 64C 1.3GHz nodes
Intel - Reported top500.org
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
Mellanox InfiniBand EDR
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.org
Operating system -
bullx SCS
Eviden
ATOEPA rolls up to Atos
- Reported top500.org

The read

The Science and Technology Facilities Council Hartree Centre's production HPC system, a Bull Sequana X1000 mixing Xeon Gold 6142 nodes with Xeon Phi 7210 (Knights Landing) nodes on EDR InfiniBand, installed in 2017. TOP500 lists it as 'scafellpike' with 80,640 cores, Rmax 1.83 and Rpeak 4.33 PFlop/s, 529 kW (power measurement level 2) and Nmax 4,162,560, on eleven lists from November 2017 (85th) to November 2022 (471st, its last list). STFC's 20 June 2019 release, mirrored by Wired-Gov, calls it a BullSequana X1000 supercomputing platform and says NVIDIA V100 GPUs would be added through GPU-enabled Sequana blades, with no GPU count; the TOP500 entry shows no GPUs, so those accelerators are not in its figures and are not recorded as an edge. Rmax is about 42 percent of Rpeak. Its successor, the Lenovo GPU system Mary Coombs, is recorded as hartree-mary-coombs. TOP500 and the STFC release are the only sources used, so the tier is reported.

Timeline

  • 2017 First operational source
  • 2021-11 List debut at #396 (November 2021) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Hartree Centre Supercomputing Centre (Daresbury)

Location
Daresbury, Cheshire, United Kingdom
Cooling
Direct liquid cooling (warm water)
Commissioned
2025