Companies/Applied Digital
Dallas, TX, USA
Applied Digital
Data center developer that built and leases the Polaris Forge 1 AI factory campus in Ellendale, North Dakota to CoreWeave.
Systems this company appears in
- Systems
- 3
- Aggregate Rmax
- 0.0 GFlop/s
- Aggregate power
- 0 kW
- First appearance
- 2025-10
- Most recent
- 2026-04-23
- Concentration
- -
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Integrator | 3 | 0.0 GFlop/s |
| Cooling | 1 | 0.0 GFlop/s |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| Polaris Forge 1 (Ellendale) USA · 2025-10 | Integrator, Cooling | Applied Digital | - | unranked |
| Polaris Forge 2 (Harwood) USA · | Integrator | Applied Digital | - | unranked |
| Delta Forge 1 (Rapides Parish) USA · | Integrator | Applied Digital | - | unranked |
AI datacenters operated
| System | Status | Accelerators | Stated power (MW) |
|---|---|---|---|
| Polaris Forge 2 (Harwood) | under construction | - | 200 |
| Delta Forge 1 (Rapides Parish) | under construction | - | 430 |
Figures come from the AI datacenter metrics; blank means none recorded.
Compute deals
| Date | Role | Counterparty | Type | MW | Value ($bn) | Source |
|---|---|---|---|---|---|---|
| 2025-08-29 | Seller | CoreWeave | Datacenter lease | 150 | 4 | sec.gov |
| 2025-06-02 | Seller | CoreWeave | Datacenter lease | 250 | 7 | sec.gov |
Headline values are as announced and are not additive. See all compute deals.
Sites operated
| Site | Location | Cooling | Commissioned |
|---|---|---|---|
| Applied Digital Polaris Forge Campus (Ellendale) | Ellendale, ND, USA | Proprietary waterless liquid cooling | 2025 |
| Applied Digital Polaris Forge 2 Campus (Harwood) | Harwood, ND, USA | - | - |
| Delta Forge Site (Rapides Parish) | Rapides Parish, LA, USA | - | - |
Related news
- Applied Digital to develop 1GW data center campus in Finland · Data Center DynamicsApplied Digital's first development outside the US is only a power-access agreement with no site or tenant named yet, so the 1GW figure is pipeline capacity, not contracted load; it shows the same Dakota/Louisiana/Alabama AI-campus playbook now reaching for Nordic power and climate advantages.