COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Companies/Applied Digital

Dallas, TX, USA

Applied Digital

Data center developer that built and leases the Polaris Forge 1 AI factory campus in Ellendale, North Dakota to CoreWeave.

Systems this company appears in

Systems
3
Aggregate Rmax
0.0 GFlop/s
systems it appears in
Aggregate power
0 kW
where disclosed
First appearance
2025-10
Most recent
2026-04-23
Concentration
-
largest is Polaris Forge 1 (Ellendale)

Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.

Role breakdown

Role Systems Rmax in those systems
Integrator 3 0.0 GFlop/s
Cooling 1 0.0 GFlop/s

Appearances

System Supplied as Shipped under Rmax Rank
Polaris Forge 1 (Ellendale)
USA · 2025-10
Integrator, Cooling Applied Digital - unranked
Polaris Forge 2 (Harwood)
USA ·
Integrator Applied Digital - unranked
Delta Forge 1 (Rapides Parish)
USA ·
Integrator Applied Digital - unranked

AI datacenters operated

SystemStatusAcceleratorsStated power (MW)
Polaris Forge 2 (Harwood) under construction - 200
Delta Forge 1 (Rapides Parish) under construction - 430

Figures come from the AI datacenter metrics; blank means none recorded.

Compute deals

DateRoleCounterpartyTypeMWValue ($bn)Source
2025-08-29 Seller CoreWeave Datacenter lease 150 4 sec.gov
2025-06-02 Seller CoreWeave Datacenter lease 250 7 sec.gov

Headline values are as announced and are not additive. See all compute deals.

Sites operated

Site Location Cooling Commissioned
Applied Digital Polaris Forge Campus (Ellendale) Ellendale, ND, USA Proprietary waterless liquid cooling 2025
Applied Digital Polaris Forge 2 Campus (Harwood) Harwood, ND, USA - -
Delta Forge Site (Rapides Parish) Rapides Parish, LA, USA - -

Related news

  • Applied Digital to develop 1GW data center campus in Finland · Data Center Dynamics
    Applied Digital's first development outside the US is only a power-access agreement with no site or tenant named yet, so the 1GW figure is pipeline capacity, not contracted load; it shows the same Dakota/Louisiana/Alabama AI-campus playbook now reaching for Nordic power and climate advantages.

All news →