COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Companies/Alphabet

Mountain View, CA, USA

Alphabet

Google designs the TPU line and operates it at pod and multi-pod scale. TPU FLOPS are almost entirely absent from public rankings.

Systems this company appears in

Systems
15
Aggregate Rmax
none published
systems it appears in
Aggregate power
0 kW
where disclosed
First appearance
2020
Most recent
2026-04
Concentration
-
largest is Google TPU v6e (Trillium) pod

Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.

Role breakdown

Role Systems Rmax in those systems
Integrator 7 none published
Accelerator 14 none published
CPU 2 none published
Interconnect 8 none published

Appearances

System Supplied as Shipped under Rmax Rank
Google TPU v6e (Trillium) pod
USA · 2024-12
Accelerator, Interconnect Alphabet - unranked
Google Council Bluffs East TPU Campus
USA · 2024-11
Accelerator, Integrator Alphabet - unranked
Google Pryor North TPU Campus
USA · 2024-07
Accelerator, Integrator Alphabet - unranked
Google Columbus TPU Campus
USA · 2024-04
Accelerator, Integrator Alphabet - unranked
Google New Albany TPU Campus
USA · 2024-04
Accelerator, Integrator Alphabet - unranked
Google TPU v4 ML Hub (Oklahoma)
USA · 2022-05
Accelerator, Integrator Alphabet - unranked
Google TPU v4 supercomputer
USA · 2020
Accelerator, Interconnect Alphabet - unranked
Google TPU v5p pod
USA ·
Accelerator, Interconnect Alphabet - unranked
Google TPU7x (Ironwood) pod
USA ·
Accelerator, Interconnect Alphabet - unranked
Google TPU (Ironwood) capacity for Anthropic
USA ·
Accelerator, Integrator Alphabet - unranked
Google India AI Hub (Vizag)
India ·
Integrator Alphabet - unranked
Google TPU v5e pod
USA ·
Accelerator, Interconnect Alphabet - unranked
Google TPU v3 pod
USA ·
Accelerator, Interconnect Alphabet - unranked
Google TPU 8t superpod
USA ·
Accelerator, Interconnect, CPU Alphabet - unranked
Google TPU 8i pod
USA ·
Accelerator, Interconnect, CPU Alphabet - unranked

Parts supplied

Part Category Generation Released
Google TPU 8t Accelerators TPU 8 2026
Google TPU 8i Accelerators TPU 8 2026
Google TPU7x (Ironwood) Accelerators TPU7x 2025
Google TPU v6e (Trillium) Accelerators v6e 2024
Google TPU v5p Accelerators TPU v5 2023
Google TPU v5e Accelerators v5e 2023
Google TPU v4 Accelerators TPU v4 2020
Google TPU inter-chip interconnect (3D torus) Interconnect ICI -

AI datacenters operated

SystemStatusAcceleratorsStated power (MW)
Google TPU v5p pod operational 8,960 -
Google TPU7x (Ironwood) pod operational 9,216 -
Google TPU v4 supercomputer operational 4,096 -
Google TPU (Ironwood) capacity for Anthropic under construction 1,000,000 1,000
Google TPU v4 ML Hub (Oklahoma) operational - -
Google Pryor North TPU Campus operational 101,400 368
Google Columbus TPU Campus operational 465,700 303
Google New Albany TPU Campus operational 576,400 333
Google Council Bluffs East TPU Campus operational 305,600 237
Google TPU v3 pod operational 1,024 -
Google TPU 8t superpod planned 9,600 -
Google TPU 8i pod planned 1,024 -

Figures come from the AI datacenter metrics; blank means none recorded.

Compute deals

DateRoleCounterpartyTypeMWValue ($bn)Source
2025-10-23 Seller Anthropic Cloud contract 1,000 - anthropic.comnasdaq.com
2025-08-21 Seller Meta Platforms Cloud contract - 10 cnbc.comdatacentrereview.com

Headline values are as announced and are not additive. See all compute deals.

Quantum computers operated

Sites operated

Site Location Cooling Commissioned
Google Cloud (undisclosed location) USA - 2023
Google Mayes County Data Center Mayes County, OK, USA - -
Visakhapatnam Google AI Hub Campus Visakhapatnam, Andhra Pradesh, India - -
Google Columbus Data Center Columbus, OH, USA - -
Google New Albany Data Center New Albany, OH, USA - -
Google Council Bluffs East Data Center Council Bluffs, IA, USA - -

Related news

  • Emerald AI, Google and NVIDIA Launch Alliance to Advance Flexible AI Data Centers · NVIDIA Blog
    NVIDIA, Google and startup Emerald AI founded the AI Energy Management Alliance to set technology-neutral standards letting AI data centers shift load, discharge storage or curtail draw on signal from the grid, instead of connecting as fixed always-on demand. It matters here because it is the two largest buyers of AI accelerators publicly treating grid power, not chip supply, as the binding constraint on how fast their own compute buildouts can scale, and because flexibility commitments like these are what utilities are starting to condition faster interconnection on.
  • Google and Blackstone's TPU venture launches as Crux AI with a stated 2GW capacity target · Data Center Dynamics
    TPUs sit in this graph as parts inside Google's own infrastructure; a separately capitalised operator selling TPU capacity puts the same accelerator on the far side of a company boundary, which is exactly the case entity resolution here has to get right rather than collapse into its parent. The capacity numbers are the company's own forward plans and an executive hire, not built floor space, so they establish intent and nothing more.
  • Google's Ironwood (TPU v7) becomes generally available, compared directly to El Capitan · Google
    Google's own launch materials put a full Ironwood pod at 42.5 exaflops of FP8 compute, described as more than 24x El Capitan's 1.7 exaflops figure, though the two numbers measure different things, dense FP8 inference throughput versus double precision HPL, and are not a like for like comparison. It is nonetheless the most direct public benchmark claim yet tying a hyperscaler's own accelerator generation to a specific system already in this dataset.

All news →