Supercomputers/Systems/Kuma
Switzerland · operational · mixed
Kuma
Also known as EPFL Kuma
Operated by EPFL at SCITAS (EPFL Lausanne) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 12.31 PFlop/s
- Rpeak
- 21.66 PFlop/s
- Rmax ÷ Rpeak
- 56.8%
- Cores
- 49,728
- Power
- 291.92 kW
- Per watt
- 42.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Kuma, and those in Switzerland. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 12.31 PFlop/s | #113 of 234 · top 48% | #3 of 11 · top 20% |
| Energy efficiency | 42.2 GF/W | #56 of 121 · top 46% | - |
| Rmax ÷ Rpeak | 56.8 % | #207 of 231 · bottom 11% | #11 of 11 · bottom 1% |
| Power draw | 292 kW | #82 of 126 · bottom 36% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Lenovo ThinkSystem SR675 V3 | Lenovo | - | Reported | top500.org |
| Accelerator | NVIDIA H100 SXM5 94GB Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 84 nodes x 4 NVIDIA H100 SXM5 94GB (plus 20 nodes of 8 L40S) | NVIDIA | 336 reported | Verified | epfl.chtop500.org |
| CPU | AMD EPYC 9004 (Genoa) CPUs x86-64 · 96C · 2.4 GHz · TSMC N5 · 360 W AMD EPYC 9334 32C 2.7GHz | AMD | - | Reported | top500.org |
| Interconnect | - ConnectX-7 Infiniband (EPFL cites 2x200Gb HDR per node) | NVIDIA | - | Reported | top500.orgepfl.ch |
Engineering, funding and access
What Kuma runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 104 nodes84 nodes with four H100 SXM5 94 GB GPUs and 20 nodes with eight L40S GPUs; each node has 384 GB DDR5 | 2025 | Operator stated | epfl.ch |
| Interconnect and topology | Two 200 Gb InfiniBand HDR connections per node; NVLink at 900 GB/s between H100 GPUsTOP500 lists ConnectX-7 InfiniBand | 2025 | Operator stated | epfl.ch |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | /scratch on a full-flash infrastructure | 2025 | Operator stated | epfl.ch |
| Programming and software stack | Red Hat Enterprise Linux 9 operating system | 2026-06 | Operator stated | top500.org |
| Programming and software stack | NVIDIA CUDA compiler (nvcc) 12.4.1, cuBLAS 12.4.5.8 and NVIDIA HPC-X 2.18 with OpenMPI 4.1.4+ for the TOP500 HPL run | 2026-06 | Operator stated | top500.org |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Pay-per-use SCITAS account for EPFL accredited researchers: the lab head signs a Service Agreement, then a Service Request Form is submitted; billed monthly at the SCITAS price list | 2024-11 | Operator stated | epfl.ch |
| Access page | www.epfl.ch/research/facilities/scitas/getting-started/accounts-on-our-facilities | 2024-11 | Operator stated | epfl.ch |
The read
The GPU cluster of EPFL's SCITAS research computing unit in Lausanne. EPFL lists 104 GPU nodes: 84 with four NVIDIA H100 SXM5 94GB GPUs each (336 H100s) and 20 with eight NVIDIA L40S GPUs each, on 200Gb InfiniBand with all-flash scratch. TOP500 lists it as a Lenovo ThinkSystem SR675 V3 system with AMD EPYC 9334 hosts, 49,728 cores, Rmax 12.31 PFlop/s, Rpeak 21.66 PFlop/s and 291.9 kW (207 kW in the optimised run); it first ranked 102nd on the November 2024 list and was 164th on June 2026. EPFL's page gives no production date.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added Kuma, EPFL's H100 cluster, 102nd on the November 2024 TOP500
Nearby in scale
The machines closest to Kuma by Rmax, smaller to larger.
- HPC4 · Italy, operational · 12.21 PFlop/s
- ARF-ACC · Turkey, operational · 12.09 PFlop/s
- Tera-1000-2 · France, operational · 11.97 PFlop/s
- Lem · Poland, operational · 12.8 PFlop/s
- Lyapunov · Russia, operational · 12.81 PFlop/s
- NHN Cloud Gwangju AI · South Korea, operational · 12.84 PFlop/s
Related systems
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA H100 SXM5 94GB, AMD EPYC 9004 (Genoa) |
| epfl.ch | names system and part | NVIDIA H100 SXM5 94GB |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.