Supercomputers/Systems/ARF-ACC
Turkey · operational · hpc
ARF-ACC
Operated by TUBITAK ULAKBIM at TRUBA (Ankara) .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 12.09 PFlop/s
- Rpeak
- 18.82 PFlop/s
- Rmax ÷ Rpeak
- 64.2%
- Cores
- 26,496
- Power
- 238.87 kW
- Per watt
- 50.6 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Lenovo ThinkSystem SD650-N V3 | Lenovo | - | Reported | top500.org |
| Accelerator | NVIDIA H100 SXM5 Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W NVIDIA H100 GPUs, the original 2024 accelerator deployment | NVIDIA | - | Verified | top500.orgulakbim.tubitak.gov.tr |
| Accelerator | NVIDIA H200 SXM Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 192 NVIDIA H200 GPUs added in 2025 | NVIDIA | 192 reported | Verified | tubitak.gov.trtop500.org |
| CPU | Intel Xeon Gold 6548Y+ CPUs x86-64 · 32C · 2.5 GHz · Intel 7 · 250 W Xeon Gold 6548Y+ 32C 2.5GHz | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Infiniband NDR200 | NVIDIA | - | Reported | top500.org |
| Operating system | Rocky Linux Operating systems RHEL-compatible Linux, community-maintained · Downstream rebuild of Red Hat Enterprise Linux source Rocky Linux 9.4 | Rocky Enterprise Software Foundation | - | Reported | top500.org |
The read
TRUBA's Lenovo ThinkSystem SD650-N V3 cluster at TUBITAK ULAKBIM's Ankara data centre, serving Turkish university and public-sector researchers. Installed with NVIDIA H100 GPUs in 2024, then expanded with 192 NVIDIA H200 GPUs in 2025 per ULAKBIM's own announcement, which nearly doubled its core count and performance between the June 2025 and November 2025 TOP500 editions; November 2025, at 145th, is its best-ever rank. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-09-24 Added: first supercomputer from Turkey in the dataset, TUBITAK ULAKBIM's TRUBA infrastructure
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| ulakbim.tubitak.gov.tr | names system and part | NVIDIA H100 SXM5 |
| top500.org | names system and part | Intel Xeon Gold 6548Y+, NVIDIA H100 SXM5, NVIDIA H200 SXM, NVIDIA InfiniBand NDR (Quantum-2), Rocky Linux |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.