Supercomputers/Systems/Thunder
USA · decommissioned · hpc
Thunder
Also known as LLNL Itanium 2 Quadrics cluster
Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 19.94 TFlop/s
- Rpeak
- 22.94 TFlop/s
- Rmax ÷ Rpeak
- 86.9%
- Cores
- 4,096
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Thunder, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 19.94 TFlop/s | #13 of 67 · top 18% | #276 of 332 · bottom 18% |
| Rmax ÷ Rpeak | 86.9 % | #4 of 67 · top 5% | #40 of 331 · top 12% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| CPU | - Itanium 2 1.4GHz (Tiger4 nodes) | Intel | - | Reported | top500.orglinuxtoday.com |
| Interconnect | Quadrics QsNet Interconnect Fat tree · 340 MB/s per direction · About 2 microseconds Quadrics QsNet II | Quadrics | - | Reported | top500.orglinuxtoday.com |
Engineering, funding and access
What Thunder runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Storage capacity | 190 TBMore than 190 TB of global disk in the November 2003 design, which planned 960 four-socket nodes with 8 GB of memory and 73 GB of local disk each. | 2003-11-16 | Vendor stated | intel.com |
| Interconnect and topology | QuadricsTOP500 list entry | 2004-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | RFP for Livermore Computing's first IA-64 cluster released in September 2003; California Digital Corporation's proposal was accepted, and the system was designed and deployed in about five months | 2003-11 | Operator stated | hpc.llnl.govintel.com |
The read
Lawrence Livermore's Linux cluster of 4,096 Itanium 2 1.4 GHz processors on Quadrics QsNet II, made by California Digital Corporation per TOP500. It was second on the June 2004 list at 19.94 TFLOPS, behind only the Earth Simulator, and was described as the largest Itanium 2 deployment and the largest QsNet II installation. TOP500 lists it until November 2008; no page we fetched gives a retirement date, so none is recorded. TOP500 is the only source for Rpeak, so the tier is reported.
Timeline
- 2003-11-16 Intel, California Digital and LLNL announced Thunder, a planned 960-node Itanium 2 cluster of more than 20 TFlop/s peak due for completion in January 2004 source
- 2004 First operational source
- 2004-06 Listed at #2 on the TOP500 (June 2004) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Change history
- 2026-10-02 Added Thunder, the LLNL Itanium 2 cluster, second on the June 2004 TOP500
Nearby in scale
The machines closest to Thunder by Rmax, smaller to larger.
- Aitzaloa · Mexico, operational · 0.02 PFlop/s
- Blue Protein · Japan, operational · 0.02 PFlop/s
- Calhoun (MSI) · USA, operational · 0.02 PFlop/s
- Merlin (Cardiff) · United Kingdom, operational · 0.02 PFlop/s
- MareNostrum (original) · Spain, upgraded · 0.02 PFlop/s
- Firefly (HCC) · USA, operational · 0.02 PFlop/s
Related systems
Same site
- BlueGene/L · USA, decommissioned, 2004
- ASC Purple · USA, decommissioned, 2005
- MCR · USA, decommissioned, 2002
- Atlas (LLNL) · USA, decommissioned, 2007
- ASCI White · USA, decommissioned, 2000
- Hera (LLNL) · USA, operational, 2009
Same operator
- ASCI Blue-Pacific · USA, decommissioned, 1998
- Edge (LLNL) · USA, operational, 2010
- Zin · USA, decommissioned, 2011
- Cab · USA, decommissioned, 2012
- Sequoia · USA, decommissioned, 2012
- Vulcan · USA, decommissioned, 2012
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| linuxtoday.com | names system and part | Quadrics QsNet |
| top500.org | names system and part | Quadrics QsNet |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.