Supercomputers/Systems/Cassava AI Factory

South Africa · operational · ai training

Cassava AI Factory

Operated by Cassava Technologies at Africa Data Centres CPT1 .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
77.79 PFlop/s
HPL measured
Rpeak
102.2 PFlop/s
Rmax ÷ Rpeak
76.1%
Cores
285,696
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Cassava AI Factory, and those in South Africa. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax77.79 PFlop/s#27 of 158 · top 17%-
Rmax ÷ Rpeak76.1 %#66 of 155 · top 42%-

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray XD670
Hewlett Packard Enterprise - Reported top500.org
Accelerator NVIDIA H200 SXM
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
NVIDIA H200 SXM5 141GB
NVIDIA - Reported top500.org
CPU Intel Xeon Platinum 8558
CPUs
x86-64 · 48C · 2.1 GHz · Intel 7
Xeon Platinum 8558 48C 2.1GHz
Intel - Reported top500.org
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
Infiniband NDR
NVIDIA - Reported top500.org

Engineering, funding and access

What Cassava AI Factory runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyInfiniBand NDR2026-06Operator statedtop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackLinux, HPL-NVIDIA 25.9.0 and Open MPI (as submitted for the TOP500 HPL run)2026-06Operator statedtop500.org

Access

ItemDetailAs ofBasisSource
How researchers get timeGPU-as-a-Service and AI-as-a-Service/APIs aimed at African businesses, governments and researchers2026-05Operator stateditweb.co.za

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 12,000 accelerators 2025-11 Operator stated Founder says Cassava acquired 12,000 NVIDIA GPUs for sites in five countries; shipments landed in Cape Town. Per-site split not stated, so this is programme-wide. connectingafrica.com

The read

The only system in this dataset on the African continent. Cassava originally targeted a mid-2025 go-live; independent reporting as late as May 2026 described the Cape Town site as still preparing to go live, and its only TOP500 appearance is the June 2026 list, so the original target should be read as missed and superseded rather than met. Exact hardware configuration is confirmed only by TOP500 itself, not by Cassava's own public statements.

Timeline

  • 2025-03 Announced source
  • 2026-05 Cassava said its Cape Town AI factory was preparing to go live, with full operation expected over the following four to six weeks source
  • 2026-06 Listed at #36 on the TOP500 (June 2026) source
  • 2026-06 First operational source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Africa Data Centres CPT1

Location
Cape Town, South Africa
Commissioned
2026

Change history

Nearby in scale

The machines closest to Cassava AI Factory by Rmax, smaller to larger.

  • Harpia · Brazil, operational · 75.2 PFlop/s
  • ABCI-Q · Japan, operational · 74.58 PFlop/s
  • NIPA (Kakao) · South Korea, operational · 69.1 PFlop/s
  • Njoerd · United Kingdom, operational · 78.2 PFlop/s
  • Perlmutter · USA, upgraded · 79.23 PFlop/s
  • Nano 4 · Taiwan, operational · 81.55 PFlop/s

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partNVIDIA H200 SXM, Intel Xeon Platinum 8558, NVIDIA InfiniBand NDR (Quantum-2)
itweb.co.zanames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.