Wuhan Supercomputing Center

Operated by Hubei Science and Technology Investment Group at Wuhan Optics Valley Computing Campus .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
operator stated
Rpeak
100.0 PFlop/s
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Huawei FusionDC1000C prefabricated modular data center, 66 kW per rack, built in 172 days
Huawei
- Reported digitalpower.huawei.com
CPU -
Tens of thousands of Huawei Kunpeng processor cores
Huawei
- Reported digitalpower.huawei.com

The read

Twin of the Wuhan AI Computing Center, opened on 23 November 2022 with a planned 200 PFLOPS and an initial deployment of 54 PFLOPS (Huawei Digital Power), built from Huawei FusionDC1000C prefabricated modules in 172 days with 66 kW racks. The hardware is described as tens of thousands of Kunpeng processor cores plus thousands of accelerator cards. The Wuhan government page of October 2025 reports that the second phase of Kunpeng compute came online the previous month, taking capacity past 100 P, so 100 is recorded as a floor. China Daily (August 2022) gave the first stage as 50 PFLOPS. Operated by Hubei Science and Technology Investment Group via Wuhan Guanggu Aijisuan. Power and accelerator vendor are not stated in the pages fetched.

Timeline

Site & facility

Wuhan Optics Valley Computing Campus

Location
Wuhan, Hubei, China
Commissioned
2021

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
digitalpower.huawei.comnames system only-
jxj.wuhan.gov.cnnames system only-