Supercomputers/Systems/SAGA-220
India · operational · hpc
SAGA-220
Also known as Supercomputer for Aerospace with GPU Architecture-220 teraflops
Operated by ISRO at Satish Dhawan Supercomputing Facility (VSSC) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- 220.00 TFlop/s
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- 150 kW
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of SAGA-220, and those in India. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Power draw | 150 kW | #114 of 135 · bottom 17% | #9 of 10 · bottom 12% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Built in-house at ISRO Satish Dhawan Supercomputing Facility, VSSC | ISRO | - | Reported | governancenow.comdqindia.com |
| Accelerator | - NVIDIA Tesla C2070 GPUs (400 per Governance Now, 436 per DQ India) | NVIDIA | - | Reported | governancenow.comdqindia.com |
| CPU | - Intel quad-core Xeon CPUs (DQ India: E5530 2.4 GHz) | Intel | - | Reported | dqindia.com |
| Interconnect | Mellanox InfiniBand QDR Interconnect Fat tree · 40 Gb/s per 4x port Mellanox InfiniBand QDR switches | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | dqindia.com |
Engineering, funding and access
What SAGA-220 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Total memory | 4.5 TBDQ India gives 4.5 TB of built-in memory for the 2011 configuration | 2011-06 | Press report | dqindia.com |
| Interconnect and topology | Mellanox QDR InfiniBand through seven QDR switches, plus 12 gigabit Ethernet switches | 2011-06 | Press report | dqindia.com |
| Cooling design | Air cooled by three 23-ton air conditionersDQ India also lists two 200 kVA UPS systems and a fire alarm system for the installation | 2011-06 | Press report | dqindia.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Job scheduler | In-house ISRO cluster manager and job scheduler that powers compute nodes on and off automatically | 2011-06 | Press report | dqindia.com |
| Programming and software stack | 64-bit Tiny Linux on the compute nodes and 64-bit Linux on the servers | 2011-06 | Press report | dqindia.com |
| Programming and software stack | ISRO's in-house aerospace application for launch-vehicle CFD, alongside open-source software | 2011-06 | Press report | dqindia.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Built in-house over six months by a 15-member VSSC team for an investment of about 14 crore rupees, with processors supplied by WiproThe currency symbol before 14 crore is garbled on the DQ India page | 2011-06 | Press report | dqindia.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Internal ISRO use for launch-vehicle and aerospace CFD; sized for over 100 engineers at once, with 60 researchers using it at launch | 2011-06 | Press report | dqindia.com |
The read
GPU supercomputer built in-house by ISRO's Satish Dhawan Supercomputing Facility at the Vikram Sarabhai Space Centre, inaugurated on 2-3 May 2011 at about Rs 14 crore for launch-vehicle CFD. Both sources give 220 TFlops theoretical peak and about 150 kW, with NVIDIA Tesla C2070 GPUs and quad-core Xeon CPUs; Governance Now counts 400 of each, DQ India counts 436 of each, so no quantity is recorded. DQ India adds Mellanox QDR InfiniBand, 4.5 TB of memory and Xeon E5530 at 2.4 GHz. Current service status is not confirmed by either source, so the status date is the launch date.
Timeline
Site & facility
Satish Dhawan Supercomputing Facility (VSSC)
- Location
- Thiruvananthapuram, India
- Commissioned
- 2011
Change history
- 2026-10-02 Added SAGA-220, ISRO's 2011 GPU supercomputer
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| dqindia.com | names system and part | Mellanox InfiniBand QDR |
| governancenow.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.