COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/CoreWeave Vennesla (Bulk N01)

Norway · operational · ai training

CoreWeave Vennesla (Bulk N01)

Also known as CoreWeave Norway; Bulk N01 AI deployment

Operated by CoreWeave at Bulk N01 Campus (Vennesla) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
CoreWeave deploys and runs the NVIDIA GB200 NVL72 cluster at Bulk N01
CoreWeave
- Reported bulkinfrastructure.comepoch.ai
Accelerator NVIDIA GB200 NVL72
Accelerators
Arm CPU + CUDA GPU · TSMC 4NP
NVIDIA GB200 NVL72 cluster
NVIDIA - Reported bulkinfrastructure.com
Interconnect -
NVIDIA Quantum-2 InfiniBand networking
NVIDIA - Reported bulkinfrastructure.com
Power -
Bulk Infrastructure owns the N01 campus with 400 MW secured and 100 percent hydropower via direct redundant connections
Bulk Infrastructure
- Reported bulkinfrastructure.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 400 MW 2025-03 Operator stated Bulk: 400 MW secured at the whole N01 campus, potential 1 GW; not the CoreWeave building alone bulkinfrastructure.com
IT power 42 MW 2026-08 Third-party estimate Epoch AI assumes the whole 42 MW Bulk facility is leased to CoreWeave epoch.ai

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Hydro Bulk Infrastructure 400 contracted 2025-03 Operator stated 100 percent renewable hydropower through direct redundant connections to multiple hydropower stations; 400 MW secured at the whole campus bulkinfrastructure.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

CoreWeave's NVIDIA GB200 NVL72 cluster with Quantum-2 InfiniBand at Bulk Infrastructure's N01 data center campus in Vennesla, outside Kristiansand, Norway, announced on 14 March 2025 and expected to be operational by summer 2025. Bulk says it has secured 400 MW at the campus, expandable to 1 GW, on hydropower through direct redundant connections; the CoreWeave deployment is one building inside that campus. Epoch AI's imagery review (updated August 2026) finds Building 1 operational at Øvrebø, assumes the whole 42 MW facility Bulk referred to is leased to CoreWeave, and lists OpenAI as a speculative user. Epoch estimates about 20,100 B200 chips, but Bulk names GB200 NVL72, so no accelerator count is entered here. Cleared land to the south west may hold further halls; Epoch notes that is not confirmed for CoreWeave.

Timeline

Site & facility

Bulk N01 Campus (Vennesla)

Location
Vennesla, Norway
Substation
400 MW

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
bulkinfrastructure.comnames system and partNVIDIA GB200 NVL72
epoch.ainames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading