Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.24 PFlop/s
- Rpeak
- 1.52 PFlop/s
- Rmax ÷ Rpeak
- 81.2%
- Cores
- 70,560
- Power
- 2.20 MW
- Per watt
- 0.6 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Helios (IFERC), and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.24 PFlop/s | #27 of 193 · top 14% | #65 of 131 · top 49% |
| Energy efficiency | 0.6 GF/W | #119 of 149 · bottom 21% | #64 of 74 · bottom 15% |
| Rmax ÷ Rpeak | 81.2 % | #103 of 192 · bottom 48% | #49 of 130 · top 37% |
| Power draw | 2,200 kW | #16 of 151 · top 10% | #6 of 74 · top 7% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Bull bullx B510 cluster | Bull | - | Reported | top500.orgfusionforenergy.europa.eu |
| CPU | Intel Xeon E5-2680 CPUs x86-64 · 8C · 2.7 GHz · 32 nm · 130 W Intel Xeon E5-2680 8C 2.7GHz | Intel | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand QDR Interconnect Fat tree · 40 Gb/s per 4x port InfiniBand QDR | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Helios (IFERC) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | bullx SUperCOmputer Suite A.E.2.1 operating systemTOP500 list entry | 2012-06 | Operator stated | top500.org |
| Programming and software stack | HPL run used Intel Compiler 12.1.1.256, Intel MKL v12 and Intel MPI 4.0.3TOP500 list entry | 2012-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | France, through CEA, as its voluntary contribution to the EU-Japan Broader ApproachThe ITER Newsline piece was written by Fusion for Energy staff, so the two pages are not independent. | 2012-02 | Operator stated | iter.orgfusionforenergy.europa.eu |
| Funding programme | EU-Japan Broader Approach Agreement (IFERC): Europe procured, operated and maintained the machine, while Japan prepared the building, services and cooling and integrated the IT equipment and user support | 2017-03 | Operator stated | fusionforenergy.europa.eu |
| Procurement | Supplied by Bull under a contract with CEA acting for Fusion for Energy; installation finished in early December 2011 and acceptance tests ran in Rokkasho from 13 to 22 December 2011 | 2012-02 | Operator stated | iter.orgfusionforenergy.europa.eu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Calls for proposals open to European and Japanese fusion researchers; the first call drew about three times the available computer time, and almost all users worked remotely | 2012-02 | Operator stated | iter.orgfusionforenergy.europa.eu |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2012-2016: predictive simulations of JT-60SA and ITER and comparisons with experiments including JET, JT-60U, ASDEX-Upgrade, MAST, Tore Supra, W7X, LHD and Heliotron J, behind 639 peer-reviewed papers | 2017-03 | Operator stated | fusionforenergy.europa.eu |
The read
A Bull bullx B510 cluster of Intel Xeon E5-2680 processors over InfiniBand QDR, supplied by France (through CEA) as its contribution to the EU-Japan Broader Approach fusion agreement and installed at the International Fusion Energy Research Centre in Rokkasho, Japan. TOP500 lists 70,560 cores, 1.237 PFlop/s Rmax, 1.524 PFlop/s Rpeak and 2,200 kW, and it peaked at 12th place on the June 2012 list. Fusion for Energy states the machine ran from 2012 to 2016, above 98 percent utilisation in a typical week, supporting 639 peer-reviewed papers, and that Europe's successor capacity went to the Marconi system managed by EUROfusion. Acceptance tests ran in December 2011 and the machine was inaugurated in March 2012, so the start date here is recorded only as 2012. A smaller Bull B515 system also named HELIOS (24,480 cores with Xeon Phi, 0.225 PFlop/s Rmax) appears on TOP500 from 2014 as an extension and is not counted in the figures on this row. TOP500 is the only source for the Rmax, Rpeak and core figures, so the tier is reported.
Timeline
- 2011-12-13 Acceptance tests began in Rokkasho after installation finished in early December 2011, running until 22 December source
- 2012 First operational source
- 2012-01 Four light-house test projects began running one at a time, scheduled through March 2012, ahead of routine operation from April 2012 source
- 2012-06 Listed at #12 on the TOP500 (June 2012) source
- 2016-12 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
IFERC Computer Simulation Centre (Rokkasho)
- Location
- Rokkasho, Aomori, Japan
- Commissioned
- 2012
Change history
- 2026-10-01 Added Helios (IFERC)
Nearby in scale
The machines closest to Helios (IFERC) by Rmax, smaller to larger.
- Graham · Canada, decommissioned · 1.23 PFlop/s
- Cayenne (Sandia) · USA, operational · 1.22 PFlop/s
- Serrano (Sandia) · USA, operational · 1.22 PFlop/s
- CNIC Era-AI · China, operational · 1.24 PFlop/s
- Sisu · Finland, decommissioned · 1.25 PFlop/s
- Yellowstone · USA, decommissioned · 1.26 PFlop/s
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| fusionforenergy.europa.eu | names system only | - |
| top500.org | names system and part | Intel Xeon E5-2680, Mellanox InfiniBand QDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.