COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Helios (IFERC)

Japan · decommissioned · hpc

Helios (IFERC)

Also known as IFERC-CSC Helios

Operated by IFERC-CSC at IFERC Computer Simulation Centre (Rokkasho) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.24 PFlop/s
HPL measured
Rpeak
1.52 PFlop/s
Rmax ÷ Rpeak
81.2%
Cores
70,560
Power
2.20 MW
Per watt
0.6 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Helios (IFERC), and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.24 PFlop/s#27 of 193 · top 14%#65 of 131 · top 49%
Energy efficiency0.6 GF/W#119 of 149 · bottom 21%#64 of 74 · bottom 15%
Rmax ÷ Rpeak81.2 %#103 of 192 · bottom 48%#49 of 130 · top 37%
Power draw2,200 kW#16 of 151 · top 10%#6 of 74 · top 7%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Bull bullx B510 cluster
Bull
ATOEPA rolls up to Atos
- Reported top500.orgfusionforenergy.europa.eu
CPU Intel Xeon E5-2680
CPUs
x86-64 · 8C · 2.7 GHz · 32 nm · 130 W
Intel Xeon E5-2680 8C 2.7GHz
Intel - Reported top500.org
Interconnect Mellanox InfiniBand QDR
Interconnect
Fat tree · 40 Gb/s per 4x port
InfiniBand QDR
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.org

Engineering, funding and access

What Helios (IFERC) runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Software

ItemDetailAs ofBasisSource
Programming and software stackbullx SUperCOmputer Suite A.E.2.1 operating systemTOP500 list entry2012-06Operator statedtop500.org
Programming and software stackHPL run used Intel Compiler 12.1.1.256, Intel MKL v12 and Intel MPI 4.0.3TOP500 list entry2012-06Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
Funded byFrance, through CEA, as its voluntary contribution to the EU-Japan Broader ApproachThe ITER Newsline piece was written by Fusion for Energy staff, so the two pages are not independent.2012-02Operator statediter.orgfusionforenergy.europa.eu
Funding programmeEU-Japan Broader Approach Agreement (IFERC): Europe procured, operated and maintained the machine, while Japan prepared the building, services and cooling and integrated the IT equipment and user support2017-03Operator statedfusionforenergy.europa.eu
ProcurementSupplied by Bull under a contract with CEA acting for Fusion for Energy; installation finished in early December 2011 and acceptance tests ran in Rokkasho from 13 to 22 December 20112012-02Operator statediter.orgfusionforenergy.europa.eu

Access

ItemDetailAs ofBasisSource
How researchers get timeCalls for proposals open to European and Japanese fusion researchers; the first call drew about three times the available computer time, and almost all users worked remotely2012-02Operator statediter.orgfusionforenergy.europa.eu

Results

ItemDetailAs ofBasisSource
Notable result2012-2016: predictive simulations of JT-60SA and ITER and comparisons with experiments including JET, JT-60U, ASDEX-Upgrade, MAST, Tore Supra, W7X, LHD and Heliotron J, behind 639 peer-reviewed papers2017-03Operator statedfusionforenergy.europa.eu

The read

A Bull bullx B510 cluster of Intel Xeon E5-2680 processors over InfiniBand QDR, supplied by France (through CEA) as its contribution to the EU-Japan Broader Approach fusion agreement and installed at the International Fusion Energy Research Centre in Rokkasho, Japan. TOP500 lists 70,560 cores, 1.237 PFlop/s Rmax, 1.524 PFlop/s Rpeak and 2,200 kW, and it peaked at 12th place on the June 2012 list. Fusion for Energy states the machine ran from 2012 to 2016, above 98 percent utilisation in a typical week, supporting 639 peer-reviewed papers, and that Europe's successor capacity went to the Marconi system managed by EUROfusion. Acceptance tests ran in December 2011 and the machine was inaugurated in March 2012, so the start date here is recorded only as 2012. A smaller Bull B515 system also named HELIOS (24,480 cores with Xeon Phi, 0.225 PFlop/s Rmax) appears on TOP500 from 2014 as an extension and is not counted in the figures on this row. TOP500 is the only source for the Rmax, Rpeak and core figures, so the tier is reported.

Timeline

  • 2011-12-13 Acceptance tests began in Rokkasho after installation finished in early December 2011, running until 22 December source
  • 2012 First operational source
  • 2012-01 Four light-house test projects began running one at a time, scheduled through March 2012, ahead of routine operation from April 2012 source
  • 2012-06 Listed at #12 on the TOP500 (June 2012) source
  • 2016-12 Decommissioned source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

IFERC Computer Simulation Centre (Rokkasho)

Location
Rokkasho, Aomori, Japan
Commissioned
2012

Change history

Nearby in scale

The machines closest to Helios (IFERC) by Rmax, smaller to larger.

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
fusionforenergy.europa.eunames system only-
top500.orgnames system and partIntel Xeon E5-2680, Mellanox InfiniBand QDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.