Supercomputers/Systems/Blue Horizon
USA · decommissioned · hpc
Blue Horizon
Also known as SDSC IBM RS/6000 SP
Operated by SDSC at San Diego Supercomputer Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 929.0 GFlop/s
- Rpeak
- 1.73 TFlop/s
- Rmax ÷ Rpeak
- 53.8%
- Cores
- 1,152
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Blue Horizon, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 929.0 GFlop/s | #23 of 39 · bottom 43% | #319 of 332 · bottom 5% |
| Rmax ÷ Rpeak | 53.8 % | #30 of 39 · bottom 25% | #303 of 331 · bottom 9% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM RS/6000 SP | IBM | - | Verified | top500.orgsdsc.edu |
| CPU | IBM POWER3-II CPUs POWER · 1C · 0.375 GHz · 220 nm POWER3 375 MHz, 1,152 processors in 8-way nodes | IBM | - | Reported | top500.orgsdsc.edu |
| Interconnect | IBM SP Switch Interconnect multi-stage Omega network · 150 MB/s per node SP Switch | IBM | - | Reported | top500.org |
| Operating system | IBM AIX Operating systems Unix (System V-derived) · Proprietary AIX | IBM | - | Reported | top500.org |
Engineering, funding and access
What Blue Horizon runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | IBM SP SwitchTOP500 list entry | 2000-11 | Operator stated | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | IBM AIXTOP500 list entry | 2000-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | National Science Foundation, through NPACI | 1998-11-04 | Operator stated | sdsc.edu |
| Funded by | State of California and the University of California, through NPACI | 1998-11-04 | Operator stated | sdsc.edu |
| Procurement | IBM RS/6000 SP announced on 4 November 1998 for delivery in the second half of 1999, installed first at a quarter teraflops and then upgraded to a full teraflops | 1998-11-04 | Operator stated | sdsc.edu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Aimed at US academic researchers through NPACI | 1998-11-04 | Operator stated | sdsc.edu |
The read
The IBM RS/6000 SP at the San Diego Supercomputer Center that NPACI called the first teraflops-class computer dedicated to academic researchers. SDSC's 4 November 1998 announcement describes an SP with more than 1,000 Power3 processors and about a teraflop of peak, backed by the NSF, the State of California and the University of California. TOP500 lists the delivered system as 1,152 POWER3 375 MHz processors on the SP Switch under AIX, 929 GFlop/s Rmax and 1,728 GFlop/s peak, eighth on the November 2000 list and listed until June 2004. TOP500 is the only source for Rmax, so the tier is reported.
Timeline
- 1998-11-04 Announced source
- 2000 First operational source
- 2000-11 Listed at #8 on the TOP500 (November 2000) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added Blue Horizon, SDSC's IBM SP, eighth on the November 2000 TOP500
Nearby in scale
The machines closest to Blue Horizon by Rmax, smaller to larger.
- KEK SR8000-F1/100 · Japan, decommissioned · 0 PFlop/s
- ECMWF VPP5000/100 · United Kingdom, decommissioned · 0 PFlop/s
- UTokyo SR8000/128 · Japan, decommissioned · 0 PFlop/s
- Jazz (Argonne LCRC) · USA, decommissioned · 0 PFlop/s
- SNU Pegasus · South Korea, operational · 0 PFlop/s
- HLRB SR8000-F1 · Germany, decommissioned · 0 PFlop/s
Related systems
Same site
- DataStar · USA, decommissioned, 2004
- Intimidata · USA, operational, 2004
- Trestles (SDSC) · USA, decommissioned, 2010
- Gordon · USA, decommissioned, 2012
- Comet · USA, decommissioned, 2015
- Expanse · USA, operational, 2020
Same operator
- Voyager · USA, operational, 2022
- Cosmos (SDSC) · USA, operational, 2025
- Expanse2 · USA, planned
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
Every source cited on this page was readable, and none of them mentions this system. They are cited at page granularity, normally because no stable deep link could be found. That is a real weakness in this row and it is why the system carries a confidence tier below verified. See how this check works.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | does not name this system | - |
| sdsc.edu | does not name this system | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Programming a supercomputer
The software stack beneath the application, and why the OS is now a sovereignty signal as much as a technical choice.