COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/Cedar Creek Campus (Bastrop County)

USA · planned · ai training

Cedar Creek Campus (Bastrop County)

Also known as Project Longhorn; BlackChamber Pacifico campus

Operated by BlackChamber Group at Cedar Creek Site (Bastrop County) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
BlackChamber Group data center, 498,165 sq ft first building of two
BlackChamber Group
- Reported baxtel.com
Power -
Pacifico Energy 710 MW gas-fired plant supporting about 490 MW of load, independent of ERCOT
Pacifico Energy
- Reported baxtel.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Stated investment 2.2 USD bn 2026-10 Operator stated Estimated total investment per the developers, via Baxtel baxtel.com
Facility power 490 MW 2026-10 Design target Data center load supported by the 710 MW gas plant baxtel.com

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
On-site gas Pacifico Energy 710 planned 2026-10 Operator stated 710 MW gas-fired plant with site-rated redundancy supporting about 490 MW of data center load; campus to run independently of the ERCOT grid baxtel.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

A 2,842-acre campus at Cedar Creek in Bastrop County, Texas, about 26 miles south east of Austin, developed by Pacifico Energy (a 710 MW gas-fired plant, supporting about 490 MW of data center load, run independently of the ERCOT grid) and BlackChamber Group (the data center, through Black Chamber Partners); estimated total investment 2.2 billion dollars. A 7 October 2026 filing with the Texas Department of Licensing and Regulation lists a 498,165 square foot first building (366 million dollars, construction 30 November 2026 to 31 January 2028) as the first of two. Baxtel, citing Austin Business Journal, reports Anthropic is in talks to lease the site, but the filing names no tenant and no lease is final; the same article notes stormwater permit challenges, withdrawn tax abatement requests and a state-ordered pause on approvals. No accelerator type or count is public.

Timeline

No dated events recorded.

Site & facility

Cedar Creek Site (Bastrop County)

Location
Cedar Creek, TX, USA

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
baxtel.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.