Supercomputers/Systems/Nibi
Canada · operational · mixed
Nibi
Also known as Nibi (GPU)
Operated by SHARCNET at University of Waterloo (Nibi) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 7.99 PFlop/s
- Rpeak
- 15.36 PFlop/s
- Rmax ÷ Rpeak
- 52.0%
- Cores
- 6,144
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Nibi, and those in Canada. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 7.99 PFlop/s | #129 of 202 · bottom 37% | #6 of 27 · top 19% |
| Rmax ÷ Rpeak | 52.0 % | #187 of 199 · bottom 7% | #22 of 27 · bottom 20% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Hypertec system architect and prime integrator; TOP500 lists a Hypertec TRIDENT iC610DR-G7 | Hypertec Cloud | - | Reported | telconews.catop500.org |
| Accelerator | - 288 NVIDIA H100 GPUs | NVIDIA | 288 reported | Reported | alliancecan.caalliancecan.ca |
| CPU | - Intel Xeon 6972P 96C 2.4GHz (TOP500 GPU entry host CPU) | Intel | - | Reported | top500.org |
| Interconnect | - Ethernet data centre fabric (400g Ethernet per TOP500), Nokia networking | Nokia | - | Reported | telconews.catop500.org |
| Cooling | - Immersion cooling plus direct liquid cooling, deployed by Hypertec | Hypertec Cloud | - | Reported | telconews.caalliancecan.ca |
Engineering, funding and access
What Nibi runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Storage capacity | 25 PBHigh-performance storage as described by the Alliance | 2025-10 | Operator stated | alliancecan.ca |
| Interconnect and topology | 400 Gb/s EthernetAs listed on the TOP500 system page (GPU partition entry) | 2026-06 | Vendor stated | top500.org |
| Cooling design | Fully water-cooled design | 2025-10 | Operator stated | alliancecan.ca |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Rocky Linux 8 operating system | 2026-06 | Vendor stated | top500.org |
| Programming and software stack | gcc 12.3.0 and OpenMPI 5.0.5 (HPL run configuration) | 2026-06 | Vendor stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Digital Research Alliance of Canada, CAD 21,848,300 | 2025-10 | Operator stated | alliancecan.ca |
| Funded by | Government of Ontario, CAD 21,195,500 matching contribution | 2025-10 | Operator stated | alliancecan.ca |
| Funding programme | Digital Research Infrastructure Strategy, funded through Innovation, Science and Economic Development Canada, with the Alliance and OntarioTotal joint investment stated as CAD 43.04 million; no USD figure given | 2025-10 | Operator stated | alliancecan.ca |
The read
SHARCNET's national system at the University of Waterloo, run for the Digital Research Alliance of Canada and replacing Graham. The Alliance describes 134,400 CPU cores (the Waterloo news piece says about 140,000 over 700+ nodes), 288 NVIDIA H100 GPUs and more than 25 PB of all-flash storage; Hypertec was the system architect and prime integrator and deployed immersion cooling alongside direct liquid cooling, on an Ethernet fabric from Nokia, with waste heat reused to warm the Lazaridis Quantum-Nano Centre. Full production began on 31 October 2025. TOP500 lists Nibi as separate CPU and GPU entries; the row here carries the GPU entry (Hypertec TRIDENT iC610DR-G7, Xeon 6972P, 400g Ethernet, Rocky Linux 8, 6,144 cores, Rmax 7.985 PFlop/s, Rpeak 15.36 PFlop/s), which ranked 173rd on the June 2025 list, its best rank, and 227th on the June 2026 list. The benchmark run predates the October 2025 production date, so first_operational_date reflects the Alliance's production announcement rather than the TOP500 submission. The TOP500 core count is that partition's, not the 134,400-core whole system. The Alliance wiki page with node-level detail blocked automated access, so per-node counts are not used.
Timeline
- 2025-06 Listed at #173 on the TOP500 (June 2025) source
- 2025-10 First operational source
- 2025-10-31 Nibi was in full production for Canadian researchers, one of five new or upgraded national systems funded by the Alliance. source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
University of Waterloo (Nibi)
- Location
- Waterloo, Canada
- Cooling
- Immersion and direct liquid cooling
- Commissioned
- 2025
Change history
- 2026-10-02 Added Nibi, SHARCNET's Waterloo H100 research system, 173rd on the June 2025 TOP500
Nearby in scale
The machines closest to Nibi by Rmax, smaller to larger.
Related systems
Same operator
- Graham · Canada, decommissioned, 2017
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| alliancecan.ca | names system only | - |
| top500.org | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.