Supercomputers/Systems/DAEDALUS
Greece · under construction · mixed
DAEDALUS
Operated by GRNET at Lavrion Technological and Cultural Park .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 85.69 PFlop/s
- Rpeak
- 115.1 PFlop/s
- Rmax ÷ Rpeak
- 74.5%
- Cores
- 411,264
- Power
- 1.40 MW
- Per watt
- 61.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of DAEDALUS, and those in Greece. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 85.69 PFlop/s | #26 of 202 · top 12% | - |
| Energy efficiency | 61.4 GF/W | #19 of 99 · top 18% | - |
| Rmax ÷ Rpeak | 74.5 % | #104 of 199 · bottom 49% | - |
| Power draw | 1,395 kW | #29 of 104 · top 27% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX254n; electromechanical fit-out by MainSys S.A. | Hewlett Packard Enterprise | - | Verified | top500.orggrnet.gr |
| Accelerator | NVIDIA GH200 Grace Hopper Superchip Accelerators Arm CPU + CUDA GPU · TSMC 4N >2,000 NVIDIA GH200 superchips | NVIDIA | - | Verified | top500.orgen.protothema.gr |
| CPU | NVIDIA Grace CPUs Armv9 (Neoverse V2) · 72C · 3.1 GHz · TSMC 4N NVIDIA Grace 72C 3.1GHz | NVIDIA | - | Reported | top500.org |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Reported | top500.org |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid Direct liquid cooling | Hewlett Packard Enterprise | - | Reported | top500.orgen.protothema.gr |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription Red Hat Enterprise Linux | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What DAEDALUS runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Storage capacity | 10 PBUsable capacity; also a 1 PB NVMe tier | 2026 | Operator stated | eurohpc-ju.europa.eu |
| Interconnect and topology | HPE Slingshot-11 | 2026-06 | Operator stated | top500.org |
| Cooling design | Direct liquid cooling | 2026-06 | Operator stated | eurohpc-ju.europa.eueurohpc-ju.europa.eu |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Red Hat Enterprise Linux, HPE Cray MPI and NVIDIA cuBLAS (as submitted for the TOP500 HPL run) | 2026-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | EuroHPC Joint Undertaking, 35% of a EUR 36 million acquisition cost | 2025-03 | Operator stated | eurohpc-ju.europa.eu |
| Funded by | Greece National Recovery and Resilience Plan (Greece 2.0), the remaining 65% of the acquisition cost | 2025-03 | Operator stated | eurohpc-ju.europa.eu |
| Funding programme | EuroHPC JU co-funding plus Greece 2.0 recovery and resilience funds | 2025-03 | Operator stated | eurohpc-ju.europa.eu |
| Procurement | HPE selected after a EuroHPC call for tender launched in June 2024; procurement contract announced 28 March 2025; EUR 36 million total acquisition costGRNET separately reports a EUR 58.9 million total project budget including a data-centre build, not used here | 2025-03 | Operator stated | eurohpc-ju.europa.eu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | EuroHPC JU and the DAEDALUS consortium (Greece, Cyprus, Montenegro, North Macedonia) jointly manage access in proportion to their investment; integrated with the Pharos AI Factory | 2025-03 | Operator stated | eurohpc-ju.europa.eu |
The read
The most powerful computing system ever ranked in Greece, and a genuine edge case for this schema: it has a real, published HPL result and TOP500 rank, yet both GRNET (its own operator) and EuroHPC JU stated as recently as June 2026 that it was not yet fully available to users. We record status as under_construction rather than operational, on the strength of the operator's own most recent public statement, rather than inferring readiness from the benchmark alone.
Timeline
- 2025-03 Announced source
- 2025-03-28 EuroHPC JU announced the DAEDALUS procurement contract with HPE, a EUR 36 million acquisition source
- 2026-06 Listed at #31 on the TOP500 (June 2026) source
- 2026-06 DAEDALUS debuted at rank 31 on the June 2026 TOP500 at 85.69 PFlop/s and 23rd on the Green500 source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Status: Under construction as recorded against Ranked 31st on the June 2026 TOP500 list; access expected shortly. A TOP500 entry implies a running machine; EuroHPC says users do not yet have access. Left as recorded.
Nearby in scale
The machines closest to DAEDALUS by Rmax, smaller to larger.
Related systems
Same operator
- ARIS · Greece, operational, 2015
Same accelerator
- Discovery 6 · USA, operational, 2025
- Isambard-AI Phase 2 · United Kingdom, operational, 2025
- JUPITER · Germany, operational, 2025
- KAIROS · France, operational
- KISTI-6 · South Korea, under construction
- Levante GPU Extension · Germany, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA GH200 Grace Hopper Superchip, NVIDIA Grace, HPE Slingshot-11 |
| eurohpc-ju.europa.eu | names system and part | NVIDIA GH200 Grace Hopper Superchip, NVIDIA Grace, Direct liquid cooling, warm water |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.