Supercomputers/Systems/Tuolumne
USA · operational · hpc
Tuolumne
Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 208.1 PFlop/s
- Rpeak
- 288.9 PFlop/s
- Rmax ÷ Rpeak
- 72.0%
- Cores
- 1,161,216
- Power
- 3.39 MW
- Per watt
- 61.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Tuolumne, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 208.1 PFlop/s | #10 of 202 · top 4% | #5 of 332 · top 1% |
| Energy efficiency | 61.4 GF/W | #18 of 99 · top 17% | #6 of 162 · top 3% |
| Rmax ÷ Rpeak | 72.0 % | #111 of 199 · bottom 45% | #185 of 331 · bottom 45% |
| Power draw | 3,387 kW | #16 of 104 · top 15% | #21 of 171 · top 12% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX255a | Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | AMD Instinct MI300A Accelerators ROCm (CDNA 3) · TSMC N5/N6 · 550 W AMD Instinct MI300A | AMD | - | Verified | top500.orgllnl.gov |
| CPU | AMD 4th Gen EPYC 24C (in MI300A) CPUs x86-64 · 24C · 1.8 GHz · TSMC N5 AMD 4th Gen EPYC 24C 1.8GHz (integrated in MI300A) | AMD | - | Reported | top500.org |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds HPE Slingshot-11 | Hewlett Packard Enterprise | - | Reported | top500.org |
| Operating system | Tri-Lab Operating System Stack Operating systems Linux distribution, RHEL-derived, HPC-tuned · Open source, LLNL-maintained TOSS | Lawrence Livermore National Laboratory | - | Reported | top500.org |
Engineering, funding and access
What Tuolumne runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,152 nodes1,100 batch, 44 debug and 8 login nodes | 2025 | Operator stated | hpc.llnl.gov |
| Total memory | 576 TBLLNL lists 589,824 GiB total (512 GiB per node), which is 576 TiB; unified HBM3 on the MI300A | 2025 | Operator stated | hpc.llnl.gov |
| Interconnect and topology | HPE Slingshot-11 | 2025 | Operator stated | hpc.llnl.govtop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre parallel file space /p/lustre5LLNL page names the path but not the file system type; /p/lustre paths are Lustre at LLNL | 2025 | Operator stated | hpc.llnl.gov |
| Job scheduler | FluxQueues pdebug (16 nodes per user), pbatch (256 nodes per job, 24 hours) and pci (1 node, 4 hours, GitLab CI) | 2025 | Operator stated | hpc.llnl.gov |
| Programming and software stack | TOSS 4 with Cray compilers and HPE Cray MPITOP500 run used g++ 12.2.1, hipcc 6.2.0 and rocBLAS 6.0.2 | 2025 | Operator stated | hpc.llnl.govtop500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | DOE National Nuclear Security Administration (NNSA) programs and LLNL Institutional Computing | 2024-11 | Operator stated | llnl.gov |
| Funding programme | ASC, Multiprogrammatic and Institutional Computing (M&IC) and Bio programs; class ATS-4, CORAL-2 | 2025 | Operator stated | hpc.llnl.gov |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Unclassified system for LLNL staff through M&IC, plus ASC-awarded time for academic programs such as PSAAP | 2025 | Operator stated | llnl.gov |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Debuted at number 10 on the November 2024 TOP500 with 288.8 PFlop/s peak | 2024-11 | Operator stated | hpc.llnl.gov |
The read
El Capitan's unclassified companion system under the same CORAL-2 procurement: same MI300A APU, same HPE Cray EX255a chassis, same Slingshot-11 fabric, but LLNL's own dedication material is explicit that Tuolumne runs open science, not stockpile stewardship, which is why its workload class differs from El Capitan's despite identical hardware.
Timeline
- 2024-11 Listed at #12 on the Green500 (November 2024) source
- 2024-11 Debuted at number 10 on the TOP500 list at SC24 source
- 2025-01 First operational source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Change history
- 2026-09-22 Gained a Green500 rank pointer (#12 on the 2024-11 list)
Nearby in scale
The machines closest to Tuolumne by Rmax, smaller to larger.
- ISEG2 · Netherlands, operational · 202.4 PFlop/s
- Discovery 6 · USA, operational · 164.2 PFlop/s
- Maximus-02 · USA, operational · 156.1 PFlop/s
- Isambard-AI Phase 2 · United Kingdom, operational · 216.5 PFlop/s
- Leonardo · Italy, upgraded · 241.2 PFlop/s
- LUMI · Finland, upgraded · 379.7 PFlop/s
Related systems
Same site
- Matrix · USA, operational, 2025
- El Capitan · USA, operational, 2024
- Lynx (LLNL) · USA, operational, 2026
- Neo · USA, operational, 2026
- rzAdams · USA, operational, 2024
- Bengal · USA, operational, 2023
Same operator
- Dane · USA, operational, 2023
- RZHound · USA, operational, 2023
- rzVernal · USA, operational, 2022
- Tenaya · USA, operational, 2022
- Tioga · USA, operational, 2022
- Magma (LLNL) · USA, operational, 2020
Same accelerator
- bwUniCluster 3.0 · Germany, operational, 2025
- Cosmos (SDSC) · USA, operational, 2025
- Hunter · Germany, operational, 2025
- Plasma Simulator Sosei · Japan, operational, 2025
- Viper-GPU · Germany, operational, 2025
- Adastra 2 · France, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | AMD Instinct MI300A, HPE Slingshot-11 |
| llnl.gov | names system and part | AMD Instinct MI300A, Tri-Lab Operating System Stack |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.