Finland · operational · mixed

Roihu

Operated by CSC at LUMI Data Center, Kajaani .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
BullSequana XH3000 hybrid system, liquid-cooled
Bull
ATOEPA rolls up to Atos
- Reported csc.fibull.com
Accelerator NVIDIA GH200 Grace Hopper Superchip
Accelerators
Arm CPU + CUDA GPU · TSMC 4N
132 GPU nodes with four NVIDIA GH200 superchips each
NVIDIA 528
reported
Reported csc.fi
CPU AMD EPYC 9005 (Turin)
CPUs
x86-64 · 192C · 2.7 GHz · TSMC N3E · 500 W
486 CPU nodes, two 192-core AMD EPYC Turin 9965 each
AMD - Reported csc.fi

Engineering, funding and access

What Roihu runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes618 nodes486 CPU nodes (414 with 768 GiB, 72 with 1,536 GiB) plus 132 GPU nodes: 486 + 132 = 618. Four high-memory and four visualisation nodes are extra.2026-11Operator stateddocs.csc.ficsc.fi
Storage capacity7.3 PB6.0 PiB scratch plus 0.5 PiB home and ProjAppl = 6.5 PiB; 6.5 x 1.1259 = 7.3 PB.2026-11Operator stateddocs.csc.ficsc.fi
Interconnect and topologyInfiniBand NDR: one 200 Gb/s link per CPU node and four per GPU node, one per GPU2026-11Operator stateddocs.csc.fi

Software

ItemDetailAs ofBasisSource
Parallel filesystemTwo all-flash DDN EXAScaler Lustre file systems: 6.0 PiB scratch (about 560 GB/s read and 280 GB/s write) and 0.5 PiB for home and ProjAppl, plus about 180 TB of disaggregated NVMe2026-11Operator stateddocs.csc.fi
Job schedulerSlurm, with node-local NVMe reservable through --gres=nvme2026-11Operator stateddocs.csc.fi
Programming and software stackRed Hat Enterprise Linux 9 with GNU and AOCC stacks, CUDA and the NVIDIA HPC SDK, and Open MPI2026-11Operator stateddocs.csc.fi

Funding

ItemDetailAs ofBasisSource
ProcurementEviden BullSequana XH3000 contract announced in November 2024: about 30 million euros for the system and extra cloud capacity, up to 60 million euros if CSC opts into future systems and extensions2024-11-21Press reporttheregister.com

Access

ItemDetailAs ofBasisSource
How researchers get timeResearchers at Finnish higher education institutions and research institutes, using a CSC user account and project managed in MyCSC; research and education use is typically free of charge2026Operator statedcsc.firesearch.csc.fi
Access pageresearch.csc.fi/how-to-startCSC's Roihu page points new users to this start page.2026Operator statedcsc.firesearch.csc.fi

The read

Finland's new national supercomputer, a liquid-cooled Bull BullSequana XH3000 hybrid system in CSC's Kajaani data centre alongside LUMI, replacing Puhti and Mahti. CSC lists 486 CPU nodes with two 192-core AMD EPYC Turin 9965 CPUs each and 132 GPU nodes with four NVIDIA GH200 superchips each, a 6.0 PiB flash scratch file system and a 0.5 PiB project and home system. Pilot use began in April 2026, the system was inaugurated in May 2026 and became generally available on 29 June 2026. CSC states only estimated HPL of above 10 PFlop/s for the CPU nodes and above 20 PFlop/s for the GPU nodes, and different CSC and press pages quote different combined theoretical peaks (33.9 and 49 PFlop/s), so no FLOPS figure is recorded. Bull's own press release confirms the delivery, the Kajaani location and the liquid-cooled BullSequana platform but not the node counts; it has no TOP500 entry that was confirmed.

Timeline

  • 2024-11 CSC awarded Eviden the Roihu contract, an investment of about 30 million euros with extra cloud capacity, rising to 60 million euros if CSC opts into future systems source
  • 2025-09 The first shipment of Roihu arrived at CSC's Kajaani data centre and installation began, after the data centre was upgraded with extra power and cooling capacity source
  • 2026-06 First operational source

Site & facility

LUMI Data Center, Kajaani

Location
Kajaani, Finland
Cooling
Direct liquid cooling with waste-heat recovery
PUE
1.03
Commissioned
2022

Change history

Same site

  • LUMI-AI · Finland, planned
  • LUMI · Finland, upgraded, 2022

Same operator

  • Mahti · Finland, decommissioned, 2020
  • Puhti · Finland, decommissioned, 2019
  • Sisu · Finland, decommissioned, 2012
  • Taito (CSC) · Finland, operational, 2012
  • Louhi · Finland, operational, 2007

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
csc.finames system and partNVIDIA GH200 Grace Hopper Superchip
bull.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.