Supercomputers/Systems/Barnard
Germany · operational · hpc
Barnard
Also known as NHR@TUD Barnard; Barnard CPU cluster
Operated by TU Dresden at TU Dresden ZIH .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.05 PFlop/s
- Rpeak
- 4.05 PFlop/s
- Rmax ÷ Rpeak
- 75.3%
- Cores
- 65,520
- Power
- 535.7 kW
- Per watt
- 5.7 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Barnard, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.05 PFlop/s | #223 of 257 · bottom 14% | #38 of 95 · top 39% |
| Energy efficiency | 5.7 GF/W | #116 of 135 · bottom 15% | #26 of 68 · top 37% |
| Rmax ÷ Rpeak | 75.3 % | #117 of 256 · top 45% | #44 of 94 · top 46% |
| Power draw | 536 kW | #67 of 139 · top 48% | #31 of 69 · top 44% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - EVIDEN BullSequana X2140 | Eviden | - | Reported | top500.org |
| CPU | - Intel Xeon Platinum 8470 52C 2.0GHz, two per node | Intel | - | Verified | top500.orgcompendium.hpc.tu-dresden.de |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds Mellanox HDR InfiniBand (ConnectX-6) | NVIDIA | - | Verified | top500.orgcompendium.hpc.tu-dresden.de |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription Red Hat Enterprise Linux | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What Barnard runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 720 nodesZIH hardware overview; 720 nodes x 104 cores is 74,880 cores against 65,520 in the TOP500 entry, which probably covers a subset of nodes. | 2026-01 | Operator stated | compendium.hpc.tu-dresden.de |
| Interconnect and topology | Mellanox ConnectX-6 InfiniBand, 2xHDR (100 Gb/s) on compute nodes and 4xHDR (200 Gb/s) on login nodesTOP500 lists Mellanox HDR InfiniBand. | 2026-01 | Operator stated | compendium.hpc.tu-dresden.detop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Shared horse and walrus filesystems; other filesystems reached through the Datamover | 2026-01 | Operator stated | compendium.hpc.tu-dresden.de |
| Job scheduler | Slurm, with a batch system separate from other ZIH clusters | 2026-01 | Operator stated | compendium.hpc.tu-dresden.de |
| Programming and software stack | Red Hat Enterprise Linux 9.6 on the cluster; Intel oneAPI MKL 2023.0.0 and Intel oneAPI MPI 2021.8.0 for the TOP500 runZIH documents RHEL 9.6; TOP500 lists the Intel oneAPI stack. | 2026-06 | Operator stated | compendium.hpc.tu-dresden.detop500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | BullSequana XH2000 servers integrating Gigabyte R283-S91-AAE1 nodes, introduced in 2023 | 2026-01 | Operator stated | compendium.hpc.tu-dresden.de |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2023: entered the TOP500 at 238th on the June 2023 list with 3.05 PFlop/s Rmax at 535.7 kW | 2023-06 | Operator stated | top500.org |
The read
General-purpose CPU cluster of the TU Dresden Center for Information Services and High Performance Computing (ZIH), introduced in 2023. TOP500 lists it as an Eviden BullSequana X2140 with Intel Xeon Platinum 8470 52-core 2 GHz processors, Mellanox HDR InfiniBand and Red Hat Enterprise Linux, 65,520 cores, Rmax 3.05 PFlop/s, Rpeak 4.05 PFlop/s and 535.7 kW. The ZIH HPC Compendium independently describes dual Xeon Platinum 8470 (52 cores, 2.00 GHz) nodes with 512 GiB of memory (90 nodes with 1 TiB) and ConnectX-6 InfiniBand HDR; it does not give a total node count, so none is recorded here. TOP500 shows it debuting 238th on the June 2023 list and still ranked in June 2026 (444th). This is the CPU-only sibling of the Capella GPU cluster at the same centre.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Core count: 65,520 cores as recorded (TOP500) against 720 nodes of 2 x 52 cores, 74,880 cores by arithmetic (ZIH). Hardware overview and the TOP500 entry differ.
Change history
- 2026-10-02 Added Barnard, TU Dresden's Sapphire Rapids CPU cluster
Nearby in scale
The machines closest to Barnard by Rmax, smaller to larger.
- KAIROS · France, operational · 3.05 PFlop/s
- Palmetto2 (Clemson) · USA, operational · 3.01 PFlop/s
- DKRZ Mistral · Germany, operational · 3.01 PFlop/s
- Circe · USA, operational · 3.06 PFlop/s
- Camphor 2 · Japan, operational · 3.06 PFlop/s
- Hera · USA, operational · 3.08 PFlop/s
Related systems
Same site
- Capella · Germany, operational, 2024
- AlphaCentauri · Germany, operational, 2021
- CARA · Germany, operational, 2019
- Taurus · Germany, decommissioned, 2015
Same operator
- SpiNNcloud · Germany, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| compendium.hpc.tu-dresden.de | names system and part | NVIDIA InfiniBand HDR |
| top500.org | names system and part | NVIDIA InfiniBand HDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.