COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/Koukaryoku PHY H200 Container DC

Japan · operational · mixed

Koukaryoku PHY H200 Container DC

Also known as SAKURA internet Ishikari container data center

Operated by SAKURA internet at SAKURA internet (Ishikari) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator NVIDIA H200 SXM
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
Approximately 1,000 NVIDIA H200 SXM 141GB GPUs, eight per server
NVIDIA 1,000
reported
Reported sakura.ad.jpai.sakura.ad.jp
CPU -
Two Intel Xeon Platinum 8580 (60 cores) CPUs per H200 server
Intel - Reported sakura.ad.jpai.sakura.ad.jp

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 1,000 accelerators 2025-08 Operator stated SAKURA internet release: approximately 1,000 H200 GPUs in the container data center sakura.ad.jpai.sakura.ad.jp

The read

A container-type data center on the grounds of SAKURA internet's Ishikari Data Center that began operating on 11 June 2025 (construction finished in May 2025) and holds approximately 1,000 NVIDIA H200 GPUs, sold as the H200 plan of the Koukaryoku PHY bare-metal GPU cloud. Two containers carry 40 racks (20 each) on about 3.5 MVA of power supply; SAKURA quotes MVA rather than MW of IT load, so no capacity claim is recorded. Each H200 server has eight H200 SXM 141 GB GPUs, two Xeon Platinum 8580 CPUs, 1.5 TB of memory and 8 x 400 Gbps of local interconnect. Direct liquid cooling lets a rack take up to five GPU servers instead of two, and the container build took about a year and a half from planning against about three years and three months for Ishikari Building 3. It is separate from SAKURAONE (sakuraone), the H100 HPC cluster on the TOP500 list. NVIDIA's 2024 Japan cloud release separately says SAKURA plans to grow Koukaryoku from 2,000 to nearly 4,000 Hopper GPUs plus HGX B200, about 10,800 GPUs in all, with no per-site split, so none of that is attributed here. The 1,000 figure is 'approximately' in SAKURA's own release and the per-server page gives no fleet size.

Timeline

Site & facility

SAKURA internet (Ishikari)

Location
Ishikari, Japan

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
ai.sakura.ad.jpnames system and partNVIDIA H200 SXM
sakura.ad.jpnames system, part and countNVIDIA H200 SXM · counts: 1000

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.