Supercomputers/Systems/ASPIRE 2A (GPU Partition)
Singapore · operational · mixed
ASPIRE 2A (GPU Partition)
Also known as NSCC ASPIRE 2A
Operated by National Supercomputing Centre Singapore .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.33 PFlop/s
- Rpeak
- 6.48 PFlop/s
- Rmax ÷ Rpeak
- 51.4%
- Cores
- 43,648
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of ASPIRE 2A (GPU Partition), and those in Singapore. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.33 PFlop/s | #214 of 257 · bottom 18% | #6 of 9 · bottom 39% |
| Rmax ÷ Rpeak | 51.4 % | #240 of 256 · bottom 7% | #9 of 9 · bottom 1% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX235n and Apollo 6500 GPU nodes | Hewlett Packard Enterprise | - | Verified | top500.orgnsccsg.github.io |
| Accelerator | NVIDIA A100 SXM4 40GB Accelerators CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W 352 NVIDIA A100 40GB GPUs (NSCC) | NVIDIA | 352 reported | Reported | nscc.sg |
| CPU | AMD EPYC 7713 (Milan) CPUs x86-64 · 64C · 2 GHz · 7 nm · 225 W AMD EPYC 7713 64C 2GHz | AMD | - | Verified | top500.orgnsccsg.github.io |
| Interconnect | HPE Slingshot-10 Interconnect Dragonfly · 100 Gb/s per port HPE Slingshot-10, dragonfly topology | Hewlett Packard Enterprise | - | Verified | top500.orgnsccsg.github.io |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription RHEL 8.3 | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What ASPIRE 2A (GPU Partition) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 82 nodes64 Cray EX GPU nodes with four A100 40 GB each plus 18 AI GPU nodes; NSCC lists 352 A100 in total, which does not match these counts exactly | 2024-05 | Operator stated | help.nscc.sgnscc.sg |
| Total memory | 476 TBTotal system memory of the whole ASPIRE 2A machine, not only the GPU partition | 2024-05 | Operator stated | nscc.sg |
| Storage capacity | 35 PB25 PB GPFS (PFSS) for project and home plus 10 PB Lustre scratch, for the whole ASPIRE 2A system | 2024-05 | Operator stated | help.nscc.sg |
| Interconnect and topology | HPE Slingshot, dragonfly topology | 2024-05 | Operator stated | nscc.sg |
| Cooling design | Warm-water-cooled Cray EX cabinets; air-cooled racks for AI, large-memory, storage and login nodes | 2024-05 | Operator stated | nscc.sg |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre and PFSS parallel file systems; 25 PB spinning and nearline plus 10 PB scratch | 2024-05 | Operator stated | nscc.sg |
| Job scheduler | Altair Workload Manager | 2024-05 | Operator stated | nscc.sg |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | NSCC Call for Projects for resource allocation; enrolment through user.nscc.sg for NUS, NTU, A*STAR, SUTD, SMU, SIT and polytechnic users and through new.nscc.sg for others | 2024-05 | Operator stated | help.nscc.sg |
The read
GPU partition of NSCC's HPE Cray EX national system, which also has 768 dual-EPYC 7713 CPU nodes and large-memory nodes, with up to 10 PFlops of raw compute stated by NSCC and service to researchers beginning on 1 July 2023. TOP500 lists the GPU partition as HPE Cray EX235n and Apollo 6500 with AMD EPYC 7713 64C 2GHz, NVIDIA A100 SXM4 40 GB and Slingshot-10 under RHEL 8.3: 43,648 cores, Rmax 3.33 PFlop/s, Rpeak 6.48 PFlop/s. It entered at rank 199 in June 2022, ranked 167th in November 2022 (the edition used here) and was 395th in June 2026. NSCC's user guide counts 64 Cray EX GPU nodes with 4 A100 each plus 12 four-GPU and 6 eight-GPU Apollo nodes, 352 A100 in all.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added ASPIRE 2A (GPU Partition), 167th on the November 2022 TOP500
Nearby in scale
The machines closest to ASPIRE 2A (GPU Partition) by Rmax, smaller to larger.
- SEIRAN · Japan, operational · 3.32 PFlop/s
- Topaz (ERDC) · USA, operational · 3.32 PFlop/s
- Facebook DGX-1 Cluster · USA, operational · 3.31 PFlop/s
- SEAS H100 (Harvard) · USA, operational · 3.38 PFlop/s
- Tenaya · USA, operational · 3.41 PFlop/s
- davinci-1 · Italy, operational · 3.45 PFlop/s
Related systems
Same operator
- ASPIRE 2A (CPU Partition) · Singapore, operational, 2023
- ASPIRE 2A+ · Singapore, operational, 2024
- ASPIRE 2B (CPU Partition) · Singapore, operational, 2026
- ASPIRE 2B (GPU Partition) · Singapore, operational, 2026
- ASPIRE 1 · Singapore, decommissioned, 2016
Same accelerator
- Derecho · USA, operational, 2023
- HEMUS · Bulgaria, operational, 2023
- Kempner AI Cluster · USA, operational, 2023
- Supek · Croatia, operational, 2023
- Delta · USA, operational, 2022
- Discovery 5 · USA, operational, 2022
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | AMD EPYC 7713 (Milan), NVIDIA A100 SXM4 40GB, HPE Slingshot-10 |
| nscc.sg | names system, part and count | AMD EPYC 7713 (Milan), NVIDIA A100 SXM4 40GB · counts: 352 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.