COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Jade (CINES)

France · upgraded · hpc

Jade (CINES)

Operated by GENCI at CINES .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
128.40 TFlop/s
HPL measured
Rpeak
146.74 TFlop/s
Rmax ÷ Rpeak
87.5%
Cores
12,288
Power
608 kW
Per watt
0.2 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
SGI Altix ICE 8200EX
SGI - Verified top500.orgen.wikipedia.org
CPU Intel Xeon E5450
CPUs
x86-64 · 4C · 3 GHz · 45 nm · 120 W
Xeon E5450 4C 3GHz (TOP500; Wikipedia names E5472 for the first block)
Intel - Reported top500.org
Operating system -
SLES10 + SGI ProPack 5
SUSE
- Reported top500.org

The read

SGI Altix ICE 8200EX bought through GENCI for the CINES national centre in Montpellier, 15th on the November 2008 TOP500 and one of the first national-centre petascale-track machines in France. TOP500 gives 12,288 cores of Xeon E5450 4-core 3.0 GHz on InfiniBand, 128.4 TFlop/s Rmax and 146.74 TFlop/s Rpeak; an AEF-info dispatch dated June 2008 reports the purchase as a 147 teraflop machine, matching the TOP500 peak. Wikipedia's CINES article describes later growth with 1,344 Nehalem X5560 nodes added to the original 1,536 dual-socket nodes (it names E5472 CPUs for the first block, which differs from TOP500's E5450), so the status is upgraded and the TOP500 figures describe the initial 12,288-core configuration, last listed in November 2009 under this entry. No shutdown date is recorded.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

CINES

Location
Montpellier, France
Commissioned
2022

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Every source cited on this page was readable, and none of them mentions this system. They are cited at page granularity, normally because no stable deep link could be found. That is a real weakness in this row and it is why the system carries a confidence tier below verified. See how this check works.

Cited sourceResultFound on the page
aefinfo.frdoes not name this system-
top500.orgdoes not name this systemIntel Xeon E5450

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading