Supercomputers/Systems/Jade (CINES)
France · decommissioned · hpc
Jade (CINES)
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 128.40 TFlop/s
- Rpeak
- 146.74 TFlop/s
- Rmax ÷ Rpeak
- 87.5%
- Cores
- 12,288
- Power
- 608 kW
- Per watt
- 0.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Jade (CINES), and those in France. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 128.40 TFlop/s | #36 of 125 · top 28% | #46 of 52 · bottom 13% |
| Energy efficiency | 0.2 GF/W | #37 of 71 · bottom 50% | #42 of 42 · bottom 1% |
| Rmax ÷ Rpeak | 87.5 % | #20 of 125 · top 15% | #9 of 51 · top 16% |
| Power draw | 608 kW | #33 of 72 · top 45% | #21 of 42 · top 49% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - SGI Altix ICE 8200EX | SGI HPENYSE
rolls up to Hewlett Packard Enterprise | - | Verified | top500.orgen.wikipedia.org |
| CPU | Intel Xeon E5450 CPUs x86-64 · 4C · 3 GHz · 45 nm · 120 W Xeon E5450 4C 3GHz (TOP500; Wikipedia names E5472 for the first block) | Intel | - | Reported | top500.org |
| Operating system | - SLES10 + SGI ProPack 5 | SUSE | - | Reported | top500.org |
Engineering, funding and access
What Jade (CINES) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,536 nodesInitial SGI ICE 8200 EX in 24 racks; the early-2010 extension added 1,344 Nehalem nodes for 2,880 nodes and 247 TFlop/s peak. | 2008 | Operator stated | cines.fr |
| Total memory | 48 TBDerived: 1,536 nodes x 32 GB (4 GB per core) = 49,152 GB. CINES names the Xeon E5472 where TOP500 says E5450. | 2008 | Operator stated | cines.fr |
| Storage capacity | 500 TB500 TB of directly attached disk on 7 racks; 700 TB of Lustre after the 2010 extension. | 2008 | Operator stated | cines.fr |
| Interconnect and topology | Dual-plane InfiniBand DDR in a hypercube topology, under 3 microseconds between nodes and 20 Gb/s peak | 2008 | Operator stated | cines.fr |
| Cooling design | Cold-water cooling inside the rack doors; maximum draw of the initial configuration 650 kW | 2008 | Operator stated | cines.fr |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre, 500 TB work space (700 TB after the 2010 extension) | 2010 | Operator stated | cines.fr |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | A tender launched in 2007 led in April 2008 to a joint CINES and GENCI decision to buy an SGI ICE 8200 EX of 147 TFlop/s, 1,536 nodes in 24 racks, with an extension foreseen in the contract | 2008-04 | Operator stated | cines.fr |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2009: mobilised in an emergency to model possible aftershocks of the 6 April 2009 L'Aquila earthquake, at the request of the Pau geoscience laboratory contacted by the Italian authorities | 2009-04 | Operator stated | cines.fr |
The read
SGI Altix ICE 8200EX bought through GENCI for the CINES national centre in Montpellier, 15th on the November 2008 TOP500 and one of the first national-centre petascale-track machines in France. TOP500 gives 12,288 cores of Xeon E5450 4-core 3.0 GHz on InfiniBand, 128.4 TFlop/s Rmax and 146.74 TFlop/s Rpeak; an AEF-info dispatch dated June 2008 reports the purchase as a 147 teraflop machine, matching the TOP500 peak. Wikipedia's CINES article describes later growth with 1,344 Nehalem X5560 nodes added to the original 1,536 dual-socket nodes (it names E5472 CPUs for the first block, which differs from TOP500's E5450), so the status is upgraded and the TOP500 figures describe the initial 12,288-core configuration, last listed in November 2009 under this entry. No shutdown date is recorded. CINES's 45-year report (https://cines.fr/wp-content/uploads/2024/10/CINES45-rapport-version-finale_compressed.pdf) says Jade was shut down at the end of 2014.
Timeline
- 2008 First operational source
- 2008-06 Announced source
- 2008-11 Listed at #15 on the TOP500 (November 2008) source
- 2008-11-05 Jade was inaugurated by French research minister Valérie Pécresse source
- 2010-02 Extended with 1,344 dual-socket Nehalem nodes to 2,880 nodes and 247 TFlop/s peak, with the extension reserved for grand challenges from March to July 2010 source
- 2014-12 Jade was shut down at the end of 2014 after six years of service, having delivered 150 million CPU hours in 2013 source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-11-08 Jade (CINES) marked decommissioned
- 2026-10-02 Added Jade, CINES SGI Altix ICE
Nearby in scale
The machines closest to Jade (CINES) by Rmax, smaller to larger.
- Encanto · USA, decommissioned · 0.13 PFlop/s
- Vayu (NCI) · Australia, operational · 0.13 PFlop/s
- TSUBAME-KFC · Japan, upgraded · 0.13 PFlop/s
- Midway (UChicago) · USA, operational · 0.13 PFlop/s
- Abisko · Sweden, decommissioned · 0.13 PFlop/s
- Argus · Canada, operational · 0.14 PFlop/s
Related systems
Same site
- Occigen · France, upgraded, 2014
- Occigen2 · France, decommissioned, 2017
- Adastra · France, operational, 2022
- Adastra 2 · France, operational, 2024
Same operator
- Turing (IDRIS) · France, decommissioned, 2012
- Jean Zay V100 · France, operational, 2019
- Jean Zay H100 · France, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
Every source cited on this page was readable, and none of them mentions this system. They are cited at page granularity, normally because no stable deep link could be found. That is a real weakness in this row and it is why the system carries a confidence tier below verified. See how this check works.
| Cited source | Result | Found on the page |
|---|---|---|
| aefinfo.fr | does not name this system | - |
| top500.org | does not name this system | Intel Xeon E5450 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
Programming a supercomputer
The software stack beneath the application, and why the OS is now a sovereignty signal as much as a technical choice.