Supercomputers/Systems/Jean Zay H100
France · operational · mixed
Jean Zay H100
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 52.18 PFlop/s
- Rpeak
- 71.42 PFlop/s
- Rmax ÷ Rpeak
- 73.1%
- Cores
- 227,136
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Eviden BullSequana XH3000 (14 racks) | Eviden | - | Verified | top500.orggenci.fr |
| Accelerator | NVIDIA H100 SXM5 Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 1,456 NVIDIA H100 SXM5 80GB GPUs | NVIDIA | - | Verified | top500.orggenci.fr |
| CPU | Intel Xeon Platinum 8468 CPUs x86-64 · 48C · 2.1 GHz · Intel 7 · 350 W Intel Xeon Platinum 8468 48C 2.1GHz | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Quad-Rail NVIDIA InfiniBand NDR200 | NVIDIA | - | Reported | top500.org |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription Red Hat Enterprise Linux | Red Hat | - | Reported | top500.org |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 1,456 accelerators | 2024-11 | Operator stated | H100 partition: 14 racks of BullSequana AI 1200H. Added to the existing A100 and V100 partitions. | genci.fr |
The read
An H100 expansion of France's flagship national system, operated jointly by CNRS/IDRIS and GENCI under the France 2030 program: 1,456 H100s added atop pre-existing A100 and V100 partitions, on Eviden BullSequana XH3000 hardware. GENCI's own release names both foundation-model training and traditional simulation workloads, which is why this row is tagged mixed.
Timeline
- 2024-03 Announced source
- 2024-06 First operational source
- 2026-06 List debut at #49 (June 2026) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-04 Added AI datacenter metrics for jean-zay-h100
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA H100 SXM5, Intel Xeon Platinum 8468, NVIDIA InfiniBand NDR (Quantum-2) |
| genci.fr | does not name this system | NVIDIA H100 SXM5, NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.