Supercomputers/Systems/COBRA
Germany · decommissioned · hpc
COBRA
Also known as MPCDF COBRA; MPI/IPP COBRA
Operated by MPCDF at MPCDF Garching .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 5.61 PFlop/s
- Rpeak
- 9.79 PFlop/s
- Rmax ÷ Rpeak
- 57.3%
- Cores
- 127,520
- Power
- 1.64 MW
- Per watt
- 3.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Intel Compute Module HNS2600BP cluster | Intel | - | Reported | top500.orgdocs.mpcdf.mpg.de |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W 128 NVIDIA Tesla V100 32GB GPUs added December 2018 | NVIDIA | 128 reported | Reported | docs.mpcdf.mpg.de |
| CPU | Intel Xeon Gold 6148 CPUs x86-64 · 20C · 2.4 GHz · 14 nm · 150 W Two Intel Xeon Gold 6148 20C 2.4GHz per node | Intel | - | Verified | top500.orgdocs.mpcdf.mpg.de |
| Interconnect | Omni-Path Architecture Interconnect Fat tree · 100 Gb/s per port · About 1 microsecond 100 Gb/s Omni-Path, fat tree within islands of about 636 nodes | Intel | - | Verified | top500.orgdocs.mpcdf.mpg.de |
The read
The Max Planck Computing and Data Facility flagship of 2018: an Intel-built cluster of dual Xeon Gold 6148 (20-core) nodes on 100 Gb/s Omni-Path in non-blocking islands of about 636 nodes, later extended with 64 Tesla V100 and 120 Quadro RTX 5000 GPU nodes. TOP500 lists 127,520 cores with Rmax 5.61 and Rpeak 9.79 PFlop/s at 1,635 kW; MPCDF quotes 11.4 PFlop/s double-precision peak for the whole machine including GPUs. MPCDF documents batch processing ending on 1 July 2024 and login nodes retired on 19 July 2024. It ranked 36th on the November 2019 TOP500.
Timeline
- 2018 First operational source
- 2019-11 List debut at #36 (November 2019) source
- 2024-07 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added COBRA, the Max Planck Computing and Data Facility Skylake cluster, 36th on the November 2019 TOP500
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| docs.mpcdf.mpg.de | names system, part and count | Intel Xeon Gold 6148, NVIDIA Tesla V100 · counts: 128 |
| top500.org | names system and part | Intel Xeon Gold 6148, Omni-Path Architecture |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.