COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Opera Iceland KEF-1 SuperPOD

Iceland · operational · ai training

Opera Iceland KEF-1 SuperPOD

Also known as Opera KEF-1

Operated by Opera at atNorth ICE02, Keflavik .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
10.53 PFlop/s
HPL measured
Rpeak
17.02 PFlop/s
Rmax ÷ Rpeak
61.9%
Cores
36,208
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Opera Iceland KEF-1 SuperPOD, and those in Iceland. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax10.53 PFlop/s#119 of 234 · bottom 50%-
Rmax ÷ Rpeak61.9 %#191 of 231 · bottom 18%-

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
NVIDIA DGX SuperPOD
NVIDIA - Reported top500.org
Accelerator NVIDIA H100 SXM5
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
NVIDIA DGX H100, H100 80GB SXM5
NVIDIA - Reported top500.org
CPU Intel Xeon Platinum 8480C
CPUs
x86-64 · 56C · 2 GHz · Intel 7 · 350 W
Xeon Platinum 8480C 56C 3.8GHz
Intel - Reported top500.org
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
Infiniband NDR400
NVIDIA - Reported top500.org

Engineering, funding and access

What Opera Iceland KEF-1 SuperPOD runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyNVIDIA InfiniBand NDR400TOP500 list entry; Opera's own release does not name the fabric.2026-06Press reporttop500.org
Cooling designFresh Icelandic airOpera's release gives no further cooling detail.2024-02-07Operator statedpress.opera.com

Software

ItemDetailAs ofBasisSource
Programming and software stackNVIDIA AI Enterprise software platform2024-02-07Operator statedpress.opera.com

Funding

ItemDetailAs ofBasisSource
ProcurementNVIDIA DGX SuperPOD with H100 GPUs deployed by Opera for its Aria browser AI features, announced 7 February 2024 with operation due to start that monthOpera claims 4x faster training and 30x faster LLM inference than the prior GPU generation (NVIDIA-supplied comparison).2024-02-07Operator statedpress.opera.com

Access

ItemDetailAs ofBasisSource
How researchers get timePrivate cluster for Opera's own browser AI services2024-02-07Operator statedpress.opera.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 83 MW 2026-10 Operator stated atNorth lists 83 MW campus power capacity for ICE02 Keflavik, the host site of the Opera cluster. Host campus, not the Opera cluster draw. atnorth.com
PUE 1.2 2026-10 Design target atNorth ICE02 page lists PUE of 1.2 or lower for the host data center. Stated design rating, not a measured year figure; host campus. atnorth.com
Rack power 40 kW 2026-10 Design target atNorth ICE02: average rack density of 40 kW supported, 100+ kW liquid-cooled racks possible. Host facility capability, not Opera racks. atnorth.com

The read

Iceland's only TOP500 entry: an NVIDIA DGX H100 SuperPOD that Opera deployed at atNorth's ICE02 data center in Keflavik to train and run its Aria browser AI features on hydroelectric and geothermal power. TOP500 lists Xeon Platinum 8480C hosts, H100 80GB accelerators and NDR400 InfiniBand, debuting at rank 88 on the June 2024 list; Opera's own release confirms the deployment, location and H100 hardware but not the precise Rmax/Rpeak figures, so those numbers rest on TOP500 alone.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

atNorth ICE02, Keflavik

Location
Keflavik, Iceland
Commissioned
2024

Change history

Nearby in scale

The machines closest to Opera Iceland KEF-1 SuperPOD by Rmax, smaller to larger.

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
press.opera.comnames system and partNVIDIA H100 SXM5
top500.orgnames system and partIntel Xeon Platinum 8480C, NVIDIA H100 SXM5, NVIDIA InfiniBand NDR (Quantum-2)

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading