Supercomputers/Systems/Graham
Canada · decommissioned · hpc
Graham
Also known as Compute Canada Graham
Operated by SHARCNET .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.23 PFlop/s
- Rpeak
- 2.64 PFlop/s
- Rmax ÷ Rpeak
- 46.5%
- Cores
- 51,200
- Power
- 546 kW
- Per watt
- 2.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Graham, and those in Canada. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.23 PFlop/s | #136 of 234 · bottom 43% | #16 of 27 · bottom 43% |
| Energy efficiency | 2.2 GF/W | #91 of 158 · bottom 44% | #9 of 15 · bottom 44% |
| Rmax ÷ Rpeak | 46.5 % | #221 of 229 · bottom 5% | #25 of 27 · bottom 9% |
| Power draw | 546 kW | #88 of 161 · bottom 47% | #5 of 16 · top 27% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Huawei X6800 V3 | Huawei | - | Reported | top500.orgcs.uwaterloo.ca |
| Accelerator | NVIDIA Tesla P100 Accelerators CUDA (Pascal GP100) · 3,584C · 1.48 GHz · 16 nm · 300 W NVIDIA Tesla P100 | NVIDIA | - | Reported | top500.org |
| CPU | Intel Xeon E5-2683 v4 CPUs x86-64 · 16C · 2.1 GHz · 14 nm · 120 W Xeon E5-2683 v4 16C 2.1GHz | Intel | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds InfiniBand EDR/FDR | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Graham runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | CentOS operating systemTOP500 list entry | 2017-06 | Operator stated | top500.org |
| Programming and software stack | HPL run used gcc, Intel MKL with cuBLAS, and Open MPITOP500 list entry | 2017-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Canada Foundation for Innovation, part of $17 million from CFI and the Government of OntarioCurrency not stated (Canadian context). | 2017-05 | Operator stated | cs.uwaterloo.ca |
| Funded by | Government of Ontario, part of the $17 million with CFI | 2017-05 | Operator stated | cs.uwaterloo.ca |
| Funding programme | A national initiative valued at $75 million involving CFI, provincial partners and industry partners | 2017-05 | Operator stated | cs.uwaterloo.ca |
The read
Huawei X6800 V3 national cluster at the University of Waterloo, led by SHARCNET with Compute Ontario and Compute Canada and unveiled on 5 May 2017: over 1,000 nodes and 33,000 CPU cores, more GPU nodes than any other Canadian academic system, 2.6 PFLOPS theoretical peak, 650 kW, 16 tonnes, a 17 million dollar CFI and Ontario investment, and rear-door liquid cooling. TOP500 lists Xeon E5-2683 v4, NVIDIA Tesla P100 and InfiniBand EDR/FDR with 51,200 cores, 1.23 PFLOPS Rmax and 546 kW; it ranked 166th in June 2018 after 96th in June 2017. The Alliance status page says Graham was retired on 15 September 2025 and replaced by Nibi (https://status.alliancecan.ca/view_incident?incident=1409).
Timeline
- 2017-05 First operational source
- 2018-06 Listed at #166 on the TOP500 (June 2018) source
- 2025-09-15 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Graham, the Waterloo national cluster
Nearby in scale
The machines closest to Graham by Rmax, smaller to larger.
- Cayenne (Sandia) · USA, operational · 1.22 PFlop/s
- Serrano (Sandia) · USA, operational · 1.22 PFlop/s
- RAIDEN · Japan, operational · 1.21 PFlop/s
- Helios (IFERC) · Japan, decommissioned · 1.24 PFlop/s
- CNIC Era-AI · China, operational · 1.24 PFlop/s
- Sisu · Finland, decommissioned · 1.25 PFlop/s
Related systems
Same operator
- Nibi · Canada, operational, 2025
Same accelerator
- AIST AI Cloud · Japan, operational, 2017
- Cedar (SFU) · Canada, decommissioned, 2017
- CNIC Era-AI · China, operational, 2017
- Facebook DGX-1 Cluster · USA, operational, 2017
- Kukai · Japan, operational, 2017
- MN-1 · Japan, operational, 2017
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| cs.uwaterloo.ca | names system only | - |
| top500.org | names system and part | Intel Xeon E5-2683 v4, NVIDIA Tesla P100, Mellanox InfiniBand EDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.