Companies/Crusoe
USA
Crusoe
AI data center developer that designed and built the Abilene, Texas campus that Oracle operates for OpenAI.
Systems this company appears in
- Systems
- 3
- Aggregate Rmax
- 0.0 GFlop/s
- Aggregate power
- 0 kW
- First appearance
- 2025-06
- Most recent
- 2026-03
- Concentration
- -
systems it appears in
where disclosed
largest is Stargate Abilene
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Integrator | 3 | 0.0 GFlop/s |
| Cooling | 2 | 0.0 GFlop/s |
| Power | 1 | 0.0 GFlop/s |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| Stargate Abilene USA · 2025-06 | Integrator, Cooling | Crusoe | - | unranked |
| Crusoe Abilene Campus (Microsoft) USA · | Integrator, Power, Cooling | Crusoe | - | unranked |
| Project Jade (Cheyenne) USA · | Integrator | Crusoe | - | unranked |
AI datacenters operated
| System | Status | Accelerators | Stated power (MW) |
|---|---|---|---|
| Crusoe Abilene Campus (Microsoft) | under construction | - | 900 |
Figures come from the AI datacenter metrics; blank means none recorded.
Sites operated
| Site | Location | Cooling | Commissioned |
|---|---|---|---|
| Lancium Clean Campus (Abilene) | Abilene, TX, USA | Direct-to-chip liquid cooling | 2025 |
| Crusoe Abilene Microsoft Campus | Abilene, TX, USA | Closed-loop non-evaporative liquid cooling | 2027 |
Related news
- Crusoe files for $4.8bn data center campus in Jayton, Texas · Data Center DynamicsTwo more spur buildings of Crusoe's Project Hyper campus, filed in Jayton near its existing Childress and Abilene Texas sites, bring Crusoe's disclosed spend across the Jayton and Childress filings to roughly $16.8bn across five buildings. Useful for tracking Crusoe's pace and footprint as a developer/landlord, distinct from the GPU-cloud deals under its own brand already in the graph.
- Google named as customer for Crusoe's data center campus in Amarillo, Texas · Data Center DynamicsCrusoe confirmed Google as the anchor customer for its multi-building Amarillo campus, sited next to and powered by Crusoe's own wind farms; a useful data point on Crusoe's role as developer/landlord rather than compute operator, distinct from the GPU-cloud deals under Crusoe's own brand already tracked here.