COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Firebird Armenian AI Factory (DC-1)

Armenia · operational · ai training

Firebird Armenian AI Factory (DC-1)

Also known as DC-1 Hrazdan; Firebird AI Factory

Operated by Firebird at Firebird DC-1 (Hrazdan) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
15.00 MW
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Firebird Armenian AI Factory (DC-1), and those in Armenia. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Power draw15,000 kW#5 of 85 · top 5%-

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge servers as the compute node platform for DC-1
Dell Technologies - Verified unite.aifirebird.ai
Accelerator NVIDIA B200 SXM
Accelerators
CUDA (Blackwell) · TSMC 4NP · 1,000 W
6,144 NVIDIA B200 GPUs (marketed DC-1 opening-day capacity; an Armenian government brief separately cites 18MW/'more than 6,000' GPUs, an unreconciled discrepancy per techi.com)
NVIDIA 6,144
reported
Verified unite.aifirebird.ai
Interconnect NVIDIA Spectrum-4
Networking
Ethernet switch ASIC · 51.2 Tb/s aggregate, 64 ports at 800G
NVIDIA Spectrum-X Ethernet networking on NVIDIA's Vera Rubin and Blackwell reference platforms
NVIDIA - Reported firebird.ai
Cooling -
Vertiv cooling infrastructure partner for DC-1
Vertiv - Reported unite.ai
Power -
Schneider Electric power infrastructure partner for DC-1
Schneider Electric - Reported unite.ai

Engineering, funding and access

What Firebird Armenian AI Factory (DC-1) runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyNVIDIA Spectrum-X Ethernet per Firebird; Unite.AI describes InfiniBand for east-west and Ethernet for north-south traffic with a BlueField-3 DPU on every node2026-08-08Operator statedfirebird.aiunite.ai
Cooling designLiquid-cooled, with a Vertiv chilled-water architecture managed by Vertiv's iCOM CWM manager2026-08-08Press reportunite.ai

Software

ItemDetailAs ofBasisSource
Programming and software stackNVIDIA DSX AI Factory reference design, with a control plane API for provisioning, fabric and observability and the multi-tenant Firebird Cloud2026-08-08Operator statedfirebird.ai

Funding

ItemDetailAs ofBasisSource
Funded byFirebird, with NVIDIA intending to invest and CoreWeave having invested in 2026; amounts not disclosed2026-08-08Operator statedfirebird.ai
Stated cost500 USD mStated as the first-phase investment; Phase 2 is announced at 4 billion dollars2025-06-17Press reportunite.ai
ProcurementDell Technologies PowerEdge servers, Schneider Electric power gear and Vertiv cooling; U.S. export authorization was secured in November 20252026-08-08Press reportunite.ai

Access

ItemDetailAs ofBasisSource
How researchers get timeFirebird Cloud multi-tenant GPU cloud; Perplexity is the first customer2026-08-08Operator statedfirebird.ai

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 70,000 accelerators 2027-12 Design target Firebird plans more than 70,000 Rubin and Blackwell GPUs and 300 MW in Armenia by end 2027. Plan; the operating B200 count was not found on a fetched page. firebird.aiw.media

The read

Armenia's first large-scale sovereign AI cluster and, per Firebird, the CIS region's largest AI data center at launch. The $500 million first phase was announced at Viva Technology on 17 June 2025 by the Government of Armenia, NVIDIA, Firebird, Team Group and Team Telecom Armenia; DC-1 opened in Hrazdan on 8 August 2026 in a ceremony attended by Prime Minister Nikol Pashinyan and NVIDIA VP Rev Lebaredian. Firebird's own announcement and the independent outlet Unite.AI both report 6,144 NVIDIA B200 GPUs on Dell PowerEdge servers drawing 15 megawatts, with NVIDIA Spectrum-X Ethernet networking and Schneider Electric/Vertiv power and cooling infrastructure; a February 2026 Phase Two announcement (with US government export-licence approval) scales the project toward 41,000 additional NVIDIA GB300 GPUs and a stated $4 billion total investment, with a roadmap to over 70,000 Blackwell/Vera Rubin GPUs and 300 MW by end of 2027. Some coverage (techi.com) flags an unreconciled discrepancy between the 15 MW marketed DC-1 figure and an 18 MW figure in an Armenian government brief, and notes that opening-day announcements did not disclose exactly how much of the cluster was energized or available to customers on day one; this row records the marketed DC-1 figures. No confirmed TOP500 submission was found, so ranked is 0 and no FLOPS figure is recorded.

Timeline

  • 2025-06-17 Announced source
  • 2025-11 Firebird secured a U.S. export license for NVIDIA GPUs for its Armenian AI factory source
  • 2026-02 Phase 2 announced at a stated 4 billion dollars, scaling toward about 50,000 GPUs with export approval for 41,000 GB300 units source
  • 2026-08-08 First operational source

Site & facility

Firebird DC-1 (Hrazdan)

Location
Hrazdan, Armenia
Substation
15 MW
Commissioned
2026

Change history

Nearby in scale

The machines closest to Firebird Armenian AI Factory (DC-1) by accelerator count, smaller to larger.

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
firebird.ainames system and partNVIDIA B200 SXM
unite.ainames system, part and countNVIDIA B200 SXM · counts: 6144

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.