Supercomputers/Systems/Firebird Armenian AI Factory (DC-1)
Armenia · operational · ai training
Firebird Armenian AI Factory (DC-1)
Also known as DC-1 Hrazdan; Firebird AI Factory
Operated by Firebird at Firebird DC-1 (Hrazdan) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- 15.00 MW
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Firebird Armenian AI Factory (DC-1), and those in Armenia. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Power draw | 15,000 kW | #5 of 85 · top 5% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge servers as the compute node platform for DC-1 | Dell Technologies | - | Verified | unite.aifirebird.ai |
| Accelerator | NVIDIA B200 SXM Accelerators CUDA (Blackwell) · TSMC 4NP · 1,000 W 6,144 NVIDIA B200 GPUs (marketed DC-1 opening-day capacity; an Armenian government brief separately cites 18MW/'more than 6,000' GPUs, an unreconciled discrepancy per techi.com) | NVIDIA | 6,144 reported | Verified | unite.aifirebird.ai |
| Interconnect | NVIDIA Spectrum-4 Networking Ethernet switch ASIC · 51.2 Tb/s aggregate, 64 ports at 800G NVIDIA Spectrum-X Ethernet networking on NVIDIA's Vera Rubin and Blackwell reference platforms | NVIDIA | - | Reported | firebird.ai |
| Cooling | - Vertiv cooling infrastructure partner for DC-1 | Vertiv | - | Reported | unite.ai |
| Power | - Schneider Electric power infrastructure partner for DC-1 | Schneider Electric | - | Reported | unite.ai |
Engineering, funding and access
What Firebird Armenian AI Factory (DC-1) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | NVIDIA Spectrum-X Ethernet per Firebird; Unite.AI describes InfiniBand for east-west and Ethernet for north-south traffic with a BlueField-3 DPU on every node | 2026-08-08 | Operator stated | firebird.aiunite.ai |
| Cooling design | Liquid-cooled, with a Vertiv chilled-water architecture managed by Vertiv's iCOM CWM manager | 2026-08-08 | Press report | unite.ai |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | NVIDIA DSX AI Factory reference design, with a control plane API for provisioning, fabric and observability and the multi-tenant Firebird Cloud | 2026-08-08 | Operator stated | firebird.ai |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Firebird, with NVIDIA intending to invest and CoreWeave having invested in 2026; amounts not disclosed | 2026-08-08 | Operator stated | firebird.ai |
| Stated cost | 500 USD mStated as the first-phase investment; Phase 2 is announced at 4 billion dollars | 2025-06-17 | Press report | unite.ai |
| Procurement | Dell Technologies PowerEdge servers, Schneider Electric power gear and Vertiv cooling; U.S. export authorization was secured in November 2025 | 2026-08-08 | Press report | unite.ai |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Firebird Cloud multi-tenant GPU cloud; Perplexity is the first customer | 2026-08-08 | Operator stated | firebird.ai |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 70,000 accelerators | 2027-12 | Design target | Firebird plans more than 70,000 Rubin and Blackwell GPUs and 300 MW in Armenia by end 2027. Plan; the operating B200 count was not found on a fetched page. | firebird.aiw.media |
The read
Armenia's first large-scale sovereign AI cluster and, per Firebird, the CIS region's largest AI data center at launch. The $500 million first phase was announced at Viva Technology on 17 June 2025 by the Government of Armenia, NVIDIA, Firebird, Team Group and Team Telecom Armenia; DC-1 opened in Hrazdan on 8 August 2026 in a ceremony attended by Prime Minister Nikol Pashinyan and NVIDIA VP Rev Lebaredian. Firebird's own announcement and the independent outlet Unite.AI both report 6,144 NVIDIA B200 GPUs on Dell PowerEdge servers drawing 15 megawatts, with NVIDIA Spectrum-X Ethernet networking and Schneider Electric/Vertiv power and cooling infrastructure; a February 2026 Phase Two announcement (with US government export-licence approval) scales the project toward 41,000 additional NVIDIA GB300 GPUs and a stated $4 billion total investment, with a roadmap to over 70,000 Blackwell/Vera Rubin GPUs and 300 MW by end of 2027. Some coverage (techi.com) flags an unreconciled discrepancy between the 15 MW marketed DC-1 figure and an 18 MW figure in an Armenian government brief, and notes that opening-day announcements did not disclose exactly how much of the cluster was energized or available to customers on day one; this row records the marketed DC-1 figures. No confirmed TOP500 submission was found, so ranked is 0 and no FLOPS figure is recorded.
Timeline
- 2025-06-17 Announced source
- 2025-11 Firebird secured a U.S. export license for NVIDIA GPUs for its Armenian AI factory source
- 2026-02 Phase 2 announced at a stated 4 billion dollars, scaling toward about 50,000 GPUs with export approval for 41,000 GB300 units source
- 2026-08-08 First operational source
Site & facility
Firebird DC-1 (Hrazdan)
- Location
- Hrazdan, Armenia
- Substation
- 15 MW
- Commissioned
- 2026
Change history
- 2026-10-04 Added AI datacenter metrics for firebird-dc1-hrazdan
- 2026-09-27 Added Firebird Armenian AI Factory (DC-1, Hrazdan)
Nearby in scale
The machines closest to Firebird Armenian AI Factory (DC-1) by accelerator count, smaller to larger.
- Meta Montgomery (Alabama) · USA, operational · 69,100 accelerators
- Meta Cheyenne (Wyoming) · USA, operational · 68,400 accelerators
- Aurora · USA, operational · 63,744 accelerators
- Meta Rosemount (Minnesota) · USA, operational · 85,400 accelerators
- xAI Colossus · USA, operational · 100,000 accelerators
- Solstice · USA, planned · 100,000 accelerators
Related systems
Same accelerator
- E2E Chennai B200 Cluster · India, operational
- Industrial AI Cloud · Germany, operational, 2026
- Jairu · Brazil, operational, 2026
- Naver B200 4K Cluster · South Korea, operational, 2026
- Nexus (Georgia Tech) · USA, operational, 2026
- NIPA (Kakao) · South Korea, operational, 2026
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| firebird.ai | names system and part | NVIDIA B200 SXM |
| unite.ai | names system, part and count | NVIDIA B200 SXM · counts: 6144 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.