Quantum: linked to PIAST-Q (20 trapped ion qubits)

Operated by PSNC at PSNC Data Centre (Poznan) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
3.53 PFlop/s
HPL measured
Rpeak
5.88 PFlop/s
Rmax ÷ Rpeak
60.0%
Cores
63,360
Power
829 kW
Per watt
4.3 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Altair, and those in Poland. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax3.53 PFlop/s#137 of 210 · bottom 36%#7 of 19 · top 33%
Energy efficiency4.3 GF/W#100 of 109 · bottom 9%#5 of 11 · top 40%
Rmax ÷ Rpeak60.0 %#175 of 207 · bottom 17%#17 of 19 · bottom 12%
Power draw829 kW#48 of 112 · top 42%#2 of 11 · top 10%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Huawei CH121L V5 liquid-cooled nodes
Huawei
- Verified top500.orgpsnc.pl
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
9 nodes with 8 NVIDIA V100 GPUs each
NVIDIA 72
reported
Reported psnc.pl
CPU -
Intel Xeon Platinum 8268 24C 2.9GHz across 1320 two-socket nodes
Intel 63,360
reported
Verified top500.orgpsnc.pl
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
InfiniBand EDR
NVIDIA - Reported top500.org

Engineering, funding and access

What Altair runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes1,329 nodes1320 two-processor Xeon Platinum 8268 nodes plus 9 nodes each with 8 NVIDIA V100 GPUs2021-06Operator statedpsnc.pl

Funding

ItemDetailAs ofBasisSource
Funded byEU funds under the national PRACE-LAB project, within the Polish Roadmap for Research Infrastructure2021-06Operator statedpsnc.pl
Funding programmePRACE-LAB project (Polish Roadmap for Research Infrastructure)2021-06Operator statedpsnc.pl

The read

Poland's largest computing system at its debut, built at the Poznan Supercomputing and Networking Center (PSNC) under the EU-funded PRACE-LAB project and physically and logically bridged to PSNC's earlier Eagle system for unified task management. A Huawei CH121L V5 liquid-cooled cluster of 1,320 two-socket Intel Xeon Platinum 8268 nodes (63,360 cores total) plus 9 NVIDIA V100-accelerated nodes for AI and data-analytics workloads, on InfiniBand EDR. TOP500 independently lists Rmax 3.53 PFlop/s, Rpeak 5.88 PFlop/s, 829 kW and the same CPU model that PSNC's own announcement describes, so the tier is verified. Integration work began in December 2020 and the system was fully commissioned in May 2021.

Timeline

  • 2020-11 Listed at #85 on the TOP500 (November 2020) source
  • 2020-12 Announced source
  • 2021-01 Part of Altair is opened to the most active PSNC users, ahead of full commissioning in May 2021 source
  • 2021-05 First operational source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

PSNC Data Centre (Poznan)

Location
Poznan, Poland
Commissioned
2021

Change history

Nearby in scale

The machines closest to Altair by Rmax, smaller to larger.

Same site

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partMellanox InfiniBand EDR
psnc.plnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.