Poland · operational · mixed
Altair
Quantum: linked to PIAST-Q (20 trapped ion qubits)
Operated by PSNC at PSNC Data Centre (Poznan) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.53 PFlop/s
- Rpeak
- 5.88 PFlop/s
- Rmax ÷ Rpeak
- 60.0%
- Cores
- 63,360
- Power
- 829 kW
- Per watt
- 4.3 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Altair, and those in Poland. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.53 PFlop/s | #137 of 210 · bottom 36% | #7 of 19 · top 33% |
| Energy efficiency | 4.3 GF/W | #100 of 109 · bottom 9% | #5 of 11 · top 40% |
| Rmax ÷ Rpeak | 60.0 % | #175 of 207 · bottom 17% | #17 of 19 · bottom 12% |
| Power draw | 829 kW | #48 of 112 · top 42% | #2 of 11 · top 10% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Huawei CH121L V5 liquid-cooled nodes | Huawei | - | Verified | top500.orgpsnc.pl |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W 9 nodes with 8 NVIDIA V100 GPUs each | NVIDIA | 72 reported | Reported | psnc.pl |
| CPU | - Intel Xeon Platinum 8268 24C 2.9GHz across 1320 two-socket nodes | Intel | 63,360 reported | Verified | top500.orgpsnc.pl |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds InfiniBand EDR | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Altair runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,329 nodes1320 two-processor Xeon Platinum 8268 nodes plus 9 nodes each with 8 NVIDIA V100 GPUs | 2021-06 | Operator stated | psnc.pl |
Funding
The read
Poland's largest computing system at its debut, built at the Poznan Supercomputing and Networking Center (PSNC) under the EU-funded PRACE-LAB project and physically and logically bridged to PSNC's earlier Eagle system for unified task management. A Huawei CH121L V5 liquid-cooled cluster of 1,320 two-socket Intel Xeon Platinum 8268 nodes (63,360 cores total) plus 9 NVIDIA V100-accelerated nodes for AI and data-analytics workloads, on InfiniBand EDR. TOP500 independently lists Rmax 3.53 PFlop/s, Rpeak 5.88 PFlop/s, 829 kW and the same CPU model that PSNC's own announcement describes, so the tier is verified. Integration work began in December 2020 and the system was fully commissioned in May 2021.
Timeline
- 2020-11 Listed at #85 on the TOP500 (November 2020) source
- 2020-12 Announced source
- 2021-01 Part of Altair is opened to the most active PSNC users, ahead of full commissioning in May 2021 source
- 2021-05 First operational source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-09-24 Altair added, Poland's PSNC national supercomputer
Nearby in scale
The machines closest to Altair by Rmax, smaller to larger.
- THX.A.B · France, operational · 3.5 PFlop/s
- Unizah-II · Saudi Arabia, operational · 3.49 PFlop/s
- Ohtaka · Japan, operational · 3.49 PFlop/s
- Forerunner 1 · Taiwan, operational · 3.53 PFlop/s
- Geely Wise Star-Dubhe · China, operational · 3.54 PFlop/s
- Anvil · USA, operational · 3.56 PFlop/s
Related systems
Same site
- Proxima · Poland, operational, 2024
- PSNC Eagle · Poland, operational, 2015
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Mellanox InfiniBand EDR |
| psnc.pl | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.