Supercomputers/Systems/Lonestar 4
USA · decommissioned · hpc
Lonestar 4
Also known as TACC Lonestar 4
Operated by Texas Advanced Computing Center at Texas Advanced Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 251.80 TFlop/s
- Rpeak
- 301.78 TFlop/s
- Rmax ÷ Rpeak
- 83.4%
- Cores
- 22,656
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Lonestar 4, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 251.80 TFlop/s | #92 of 179 · bottom 50% | #226 of 332 · bottom 33% |
| Rmax ÷ Rpeak | 83.4 % | #88 of 178 · top 49% | #69 of 331 · top 21% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge M610 cluster | Dell Technologies | - | Reported | top500.orgdatacenterknowledge.com |
| CPU | - Xeon X5680 6C 3.33GHz (Westmere) | Intel | - | Reported | top500.orgdatacenterknowledge.com |
| Interconnect | Mellanox InfiniBand QDR Interconnect Fat tree · 40 Gb/s per 4x port Infiniband QDR (Mellanox 40Gb/s) | NVIDIA | - | Reported | top500.orgdatacenterknowledge.com |
Engineering, funding and access
What Lonestar 4 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,888 nodesDell PowerEdge M610 blades, each with two six-core Xeon 5600 (Westmere) processors; 1,888 x 12 = 22,656 cores, matching TOP500 | 2011 | Press report | scientific-computing.com |
| Total memory | 44.3 TBTotal memory | 2011-06 | Operator stated | news.utexas.eduscientific-computing.com |
| Storage capacity | 1.2 PBRaw disk; Scientific Computing World names DataDirect Networks as the storage supplier | 2011-06 | Operator stated | news.utexas.eduscientific-computing.com |
| Interconnect and topology | Mellanox InfiniBand QDR, 40 Gb/sTOP500 lists InfiniBand QDR | 2011 | Press report | scientific-computing.comtop500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | National Science Foundation | 2011 | Press report | scientific-computing.com |
| Funded by | University of Texas at Austin, the UT System and UT's Institute for Computational Engineering and Sciences | 2011 | Press report | scientific-computing.com |
| Funded by | Texas A&M University | 2011 | Press report | scientific-computing.com |
| Funded by | Texas Tech University | 2011 | Press report | scientific-computing.com |
| Stated cost | 12 USD m$12 million committed by NSF, UT Austin, the UT System, UT's ICES, Texas A&M, Texas Tech and US technology partners; a commitment total, not an audited cost | 2011 | Press report | scientific-computing.com |
| Procurement | Dell PowerEdge M610 blade system, with Intel, Mellanox Technologies and DataDirect Networks as technology partners | 2011 | Press report | scientific-computing.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | US open-science researchers through NSF TeraGrid allocations, of which it was the third largest system, at nearly 200 million core-hours a yearCore-hour figure from Scientific Computing World | 2011-06 | Operator stated | news.utexas.eduscientific-computing.com |
The read
TACC's Dell PowerEdge M610 blade cluster for the NSF TeraGrid, University of Texas System, Texas A&M and Texas Tech, 39th on the November 2011 TOP500. TOP500 lists 22,656 Xeon X5680 6-core 3.33 GHz cores on InfiniBand QDR at 251.8 TFlop/s Rmax and 301.78 TFlop/s Rpeak, with list positions from 28th in June 2011 to 404th in November 2015. Data Center Knowledge's report independently confirms the TACC site, 1,888 Dell M610 blades with dual six-core Westmere processors, 302 teraflops peak, 44.3 TB of memory and Mellanox 40 Gb/s InfiniBand. Decommissioned reflects its disappearance from TOP500 after November 2015 after Lonestar 5 debuted on the November 2015 list; no retirement date is recorded. TOP500 is the only source for Rmax, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Texas Advanced Computing Center
- Location
- Austin, TX, USA
- Cooling
- Direct liquid cooling
- Commissioned
- 2007
Change history
- 2026-10-02 Added Lonestar 4, TACC's Dell blade cluster, 39th on the November 2011 TOP500
Nearby in scale
The machines closest to Lonestar 4 by Rmax, smaller to larger.
- Camphor 1 · Japan, operational · 0.25 PFlop/s
- Grifo04 · Brazil, operational · 0.25 PFlop/s
- Lichtenberg I Phase 2 · Germany, operational · 0.25 PFlop/s
- Sango · Japan, decommissioned · 0.25 PFlop/s
- Plasma Simulator SR16000 · Japan, decommissioned · 0.25 PFlop/s
- Leo (Debrecen) · Hungary, operational · 0.25 PFlop/s
Related systems
Same site
- Stampede · USA, decommissioned, 2013
- Maverick (TACC) · USA, operational, 2014
- Ranger · USA, decommissioned, 2008
- Lonestar 5 · USA, decommissioned, 2016
- Stampede2 · USA, decommissioned, 2017
- Frontera · USA, decommissioned, 2019
Same operator
- Longhorn · USA, operational, 2019
- Lonestar6 · USA, operational
- Horizon · USA, under construction
- Stampede3 · USA, operational, 2024
- Vista (TACC) · USA, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Mellanox InfiniBand QDR |
| datacenterknowledge.com | names system and part | Mellanox InfiniBand QDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.