COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Rudens

Latvia · operational · hpc

Rudens

Operated by Riga Technical University at RTU HPC Center, Riga .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
vendor peak
Rpeak
240.00 TFlop/s
Rmax ÷ Rpeak
-
Cores
2,736
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator -
4x NVIDIA A100 GPU per node, 1 Lenovo SR670 V2 node
NVIDIA 8
reported
Reported hpc-guide.rtu.lv
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
4x NVIDIA Tesla V100 GPU per node, 2 Dell nodes
NVIDIA 8
reported
Reported hpc-guide.rtu.lv
Accelerator -
NVIDIA L40S 48GB, 2 or 4 per node across 6 nodes
NVIDIA 12
reported
Reported hpc-guide.rtu.lv
CPU AMD EPYC 9004 (Genoa)
CPUs
x86-64 · 96C · 2.4 GHz · TSMC N5 · 360 W
AMD EPYC 9654 (Genoa), 4 nodes
AMD - Reported hpc-guide.rtu.lv
CPU AMD EPYC 7713 (Milan)
CPUs
x86-64 · 64C · 2 GHz · 7 nm · 225 W
AMD EPYC 7713 (Milan), 3 nodes
AMD - Reported hpc-guide.rtu.lv
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
InfiniBand, FDR to HDR 200Gb/s across nodes
NVIDIA - Reported hpc-guide.rtu.lv

Engineering, funding and access

What Rudens runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes30 nodesStated as 30 computing nodes; the node lists on the same page sum to 28 plus 2 login nodes2026Operator statedhpc-guide.rtu.lv
Total memory25 TBStated total; the per-node figures on the page do not sum exactly to it2026Operator statedhpc-guide.rtu.lv
Storage capacity1.6 PBStated total data storage2026Operator statedhpc-guide.rtu.lv
Interconnect and topologyInfiniBand at 56 to 200 Gb/s between nodes; 10 Gbps to the Latvian academic network and 100 Gbps to GEANT2026Operator statedhpc-guide.rtu.lv

Software

ItemDetailAs ofBasisSource
Parallel filesystemBeeGFS (1.3 PB NL-SAS plus a 30 TB NVMe pool for home and scratch, and an older 104 TB system), EMC Isilon OneFS 238 TB over NFS, and a 600 TB backup NAS2026Operator statedhpc-guide.rtu.lv
Job schedulerTorque 6.1.1.1 and Moab 9.1.1 with Moab Accounting Manager2026Operator statedhpc-guide.rtu.lv
Programming and software stackCentOS 7.9 with xCAT provisioning2026Operator statedhpc-guide.rtu.lv

Access

ItemDetailAs ofBasisSource
How researchers get timeApplication form reviewed by the RTU HPC Centre, which then contacts the applicant; users sign a user agreement2026Operator statedhpc-guide.rtu.lv
Access pagehpc-guide.rtu.lv/01_getting_access.html2026Operator statedhpc-guide.rtu.lv

The read

Latvia's national academic HPC cluster, operated by the Riga Technical University HPC Center alongside the University of Latvia's Institute of Computational Modelling as part of the EuroCC national competence centre. RTU's own hardware manual lists 32 nodes (30 compute plus head/login), mixing AMD EPYC 9654 (Genoa) and EPYC 7713 (Milan) CPU-only nodes with GPU nodes carrying NVIDIA L40S, A100 and Tesla V100 accelerators (28 GPUs total) over InfiniBand ranging FDR to HDR 200Gb/s, for 2,736 CPU cores and a vendor-stated 240 TFlop/s combined peak (134 TFlop/s CPU plus 106 TFlop/s GPU). No HPL run has been published, so rmax is left blank and the peak figure is marked vendor_peak rather than hpl_measured; it does not appear on TOP500.

Timeline

No dated events recorded.

Site & facility

Change history

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
eurocc-latvia.lvdoes not name this system · counts: 8
hpc-guide.rtu.lvnames system, part and countAMD EPYC 9004 (Genoa), AMD EPYC 7713 (Milan), NVIDIA Tesla V100, NVIDIA InfiniBand HDR · counts: 8

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading