Supercomputers/Systems/Rudens
Latvia · operational · hpc
Rudens
Operated by Riga Technical University at RTU HPC Center, Riga .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- 240.00 TFlop/s
- Rmax ÷ Rpeak
- -
- Cores
- 2,736
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Accelerator | - 4x NVIDIA A100 GPU per node, 1 Lenovo SR670 V2 node | NVIDIA | 8 reported | Reported | hpc-guide.rtu.lv |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W 4x NVIDIA Tesla V100 GPU per node, 2 Dell nodes | NVIDIA | 8 reported | Reported | hpc-guide.rtu.lv |
| Accelerator | - NVIDIA L40S 48GB, 2 or 4 per node across 6 nodes | NVIDIA | 12 reported | Reported | hpc-guide.rtu.lv |
| CPU | AMD EPYC 9004 (Genoa) CPUs x86-64 · 96C · 2.4 GHz · TSMC N5 · 360 W AMD EPYC 9654 (Genoa), 4 nodes | AMD | - | Reported | hpc-guide.rtu.lv |
| CPU | AMD EPYC 7713 (Milan) CPUs x86-64 · 64C · 2 GHz · 7 nm · 225 W AMD EPYC 7713 (Milan), 3 nodes | AMD | - | Reported | hpc-guide.rtu.lv |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds InfiniBand, FDR to HDR 200Gb/s across nodes | NVIDIA | - | Reported | hpc-guide.rtu.lv |
Engineering, funding and access
What Rudens runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 30 nodesStated as 30 computing nodes; the node lists on the same page sum to 28 plus 2 login nodes | 2026 | Operator stated | hpc-guide.rtu.lv |
| Total memory | 25 TBStated total; the per-node figures on the page do not sum exactly to it | 2026 | Operator stated | hpc-guide.rtu.lv |
| Storage capacity | 1.6 PBStated total data storage | 2026 | Operator stated | hpc-guide.rtu.lv |
| Interconnect and topology | InfiniBand at 56 to 200 Gb/s between nodes; 10 Gbps to the Latvian academic network and 100 Gbps to GEANT | 2026 | Operator stated | hpc-guide.rtu.lv |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | BeeGFS (1.3 PB NL-SAS plus a 30 TB NVMe pool for home and scratch, and an older 104 TB system), EMC Isilon OneFS 238 TB over NFS, and a 600 TB backup NAS | 2026 | Operator stated | hpc-guide.rtu.lv |
| Job scheduler | Torque 6.1.1.1 and Moab 9.1.1 with Moab Accounting Manager | 2026 | Operator stated | hpc-guide.rtu.lv |
| Programming and software stack | CentOS 7.9 with xCAT provisioning | 2026 | Operator stated | hpc-guide.rtu.lv |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Application form reviewed by the RTU HPC Centre, which then contacts the applicant; users sign a user agreement | 2026 | Operator stated | hpc-guide.rtu.lv |
| Access page | hpc-guide.rtu.lv/01_getting_access.html | 2026 | Operator stated | hpc-guide.rtu.lv |
The read
Latvia's national academic HPC cluster, operated by the Riga Technical University HPC Center alongside the University of Latvia's Institute of Computational Modelling as part of the EuroCC national competence centre. RTU's own hardware manual lists 32 nodes (30 compute plus head/login), mixing AMD EPYC 9654 (Genoa) and EPYC 7713 (Milan) CPU-only nodes with GPU nodes carrying NVIDIA L40S, A100 and Tesla V100 accelerators (28 GPUs total) over InfiniBand ranging FDR to HDR 200Gb/s, for 2,736 CPU cores and a vendor-stated 240 TFlop/s combined peak (134 TFlop/s CPU plus 106 TFlop/s GPU). No HPL run has been published, so rmax is left blank and the peak figure is marked vendor_peak rather than hpl_measured; it does not appear on TOP500.
Timeline
No dated events recorded.
Site & facility
Change history
- 2026-09-24 Rudens added (Latvia)
Related systems
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| eurocc-latvia.lv | does not name this system | · counts: 8 |
| hpc-guide.rtu.lv | names system, part and count | AMD EPYC 9004 (Genoa), AMD EPYC 7713 (Milan), NVIDIA Tesla V100, NVIDIA InfiniBand HDR · counts: 8 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.