Supercomputers/Systems/PSNC Eagle
Poland · operational · hpc
PSNC Eagle
Also known as EAGLE; Eagle (PSNC); Orzel
Operated by PSNC at PSNC Data Centre (Poznan) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.01 PFlop/s
- Rpeak
- 1.37 PFlop/s
- Rmax ÷ Rpeak
- 73.9%
- Cores
- 32,984
- Power
- 549.6 kW
- Per watt
- 1.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of PSNC Eagle, and those in Poland. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.01 PFlop/s | #95 of 230 · top 41% | #11 of 19 · bottom 45% |
| Energy efficiency | 1.8 GF/W | #97 of 180 · bottom 47% | #8 of 11 · bottom 31% |
| Rmax ÷ Rpeak | 73.9 % | #127 of 226 · bottom 45% | #7 of 19 · top 33% |
| Power draw | 550 kW | #90 of 182 · top 49% | #5 of 11 · top 40% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Huawei E9000 Blade Server | Huawei | - | Reported | top500.orgpsnc.pl |
| CPU | Intel Xeon E5-2697 v3 CPUs x86-64 · 14C · 2.6 GHz · 22 nm · 145 W Intel Xeon E5-2697v3 14C 2.6 GHz (TOP500: 32,984 cores) | Intel | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond 56G InfiniBand FDR | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What PSNC Eagle runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | 56G InfiniBand FDRTOP500 list entry (Huawei E9000 blades) | 2015-11 | Operator stated | top500.org |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Offered to the academic community and SMEs in an HPC cloud model through the PSNC-Huawei Innovation Center | 2016-01 | Operator stated | psnc.pl |
The read
A Huawei E9000 blade cluster at the Poznan Supercomputing and Networking Center, listed by TOP500 with 32,984 cores of Xeon E5-2697v3 (14 cores, 2.6 GHz) on 56G InfiniBand FDR, 1.01 PFlop/s Rmax, 1.37 PFlop/s Rpeak and 549.6 kW, installed in 2015. It entered the TOP500 at 80th on the November 2015 list (recorded here) and stayed on the list until November 2018, when it ranked 416th. PSNC and Huawei launched it at the PSNC-Huawei Innovation Center inauguration on 22 January 2016 as a 1.4 PFlop/s machine and the second most powerful in Poland, which agrees with the TOP500 peak figure. The status date is the last TOP500 appearance, because no later operator statement was found. The newer PSNC systems Altair and Proxima are separate rows.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-04 Added PSNC Eagle, Poznan
Nearby in scale
The machines closest to PSNC Eagle by Rmax, smaller to larger.
- Tryton · Poland, decommissioned · 1.01 PFlop/s
- CRESCO6 · Italy, operational · 1.01 PFlop/s
- ASPIRE 1 · Singapore, decommissioned · 1.01 PFlop/s
- MareNostrum P9 CTE · Spain, operational · 1.02 PFlop/s
- QUARTETTO · Japan, operational · 1.02 PFlop/s
- Lonestar 5 · USA, decommissioned · 1.02 PFlop/s
Related systems
Same site
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| psnc.pl | names system only | - |
| top500.org | names system and part | Intel Xeon E5-2697 v3, Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.