Supercomputers/Systems/Deucalion
Portugal · operational · hpc
Deucalion
Operated by MACC at Deucalion (Guimaraes) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.96 PFlop/s
- Rpeak
- 5.01 PFlop/s
- Rmax ÷ Rpeak
- 79.0%
- Cores
- 78,336
- Power
- 371.72 kW
- Per watt
- 10.7 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Deucalion, and those in Portugal. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.96 PFlop/s | #198 of 257 · bottom 24% | - |
| Energy efficiency | 10.7 GF/W | #99 of 135 · bottom 28% | - |
| Rmax ÷ Rpeak | 79.0 % | #87 of 256 · top 34% | - |
| Power draw | 372 kW | #81 of 139 · bottom 43% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Fujitsu, with Atos BullSequana for the x86 partitions | Fujitsu | - | Verified | eurohpc-ju.europa.eutop500.org |
| CPU | Fujitsu A64FX CPUs Armv8.2-A SVE · 48C · 2.2 GHz · 7 nm Fujitsu A64FX 48C 2.2GHz | Fujitsu | - | Reported | top500.orgeurohpc-ju.europa.eu |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds InfiniBand HDR100 | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Deucalion runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 2,165 nodesSum of 1632 ARM, 500 x86 and 33 accelerated nodes listed on the EuroHPC page; accelerated nodes have four NVIDIA A100 (40 or 80 GB) each | 2026 | Operator stated | eurohpc-ju.europa.eu |
| Storage capacity | 10.6 PBHigh-speed parallel file system partition; a separate 430 TB NVMe partition is also listed | 2026 | Operator stated | eurohpc-ju.europa.eu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | EuroHPC Joint Undertaking, EUR 6.95 millionDescribed as part of a joint investment of more than EUR 20 million over three years | 2021-02 | Operator stated | eurohpc-ju.europa.eufct.pt |
| Funded by | FCT with the Innovation Support Fund, the Energy Efficiency Fund, European Structural Funds of Northern Portugal and the Municipality of GuimaraesFCT page gives no separate FCT amount | 2021-02 | Operator stated | eurohpc-ju.europa.eufct.pt |
| Procurement | Fujitsu selected through a tender launched in March 2020; purchase contract signed on 5 February 2021 by FCT, EuroHPC JU and Fujitsux86 and accelerated partitions are listed by EuroHPC as Atos Bull Sequana | 2021-02 | Operator stated | eurohpc-ju.europa.eufct.pt |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | EuroHPC access calls; pay-per-use conditions via the hosting siteDeucalion site reports 700+ projects and 2000+ users | 2026 | Operator stated | eurohpc-ju.europa.eudeucalion.acnca.pt |
The read
Portugal's EuroHPC system, managed by MACC and built by Fujitsu, inaugurated in September 2023, with an A64FX ARM partition (the one TOP500 lists), x86 partitions and a small NVIDIA A100 partition. It ranked 219th in June 2024 and has slipped since. EuroHPC and the Deucalion site both describe it, but the site is the only source for the inauguration. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
- 2021-02-05 FCT, EuroHPC JU and Fujitsu sign the purchase contract for Deucalion after a tender launched in March 2020 source
- 2023-09 First operational source
- 2024-06 Listed at #219 on the TOP500 (June 2024) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Deucalion (Guimaraes)
- Location
- Guimaraes, Portugal
- Commissioned
- 2023
Change history
- 2026-09-22 Gained a Green500 rank pointer (#80 on the 2024-06 list)
- 2026-09-20 Added with a rank pointer on the edition where it ranked highest
Nearby in scale
The machines closest to Deucalion by Rmax, smaller to larger.
- ECMWF Cray XC40 · United Kingdom, decommissioned · 3.94 PFlop/s
- Nautilus · USA, operational · 3.9 PFlop/s
- Gemini (Petrobras) · Brazil, operational · 3.86 PFlop/s
- DGX SaturnV · USA, upgraded · 4 PFlop/s
- Raider · USA, operational · 4.02 PFlop/s
- Warhawk · USA, operational · 4.03 PFlop/s
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| deucalion.acnca.pt | blocked our fetch | - |
| top500.org | names system and part | Fujitsu A64FX, NVIDIA InfiniBand HDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.