Supercomputers/Systems/Triolith
Sweden · decommissioned · hpc
Triolith
Also known as NSC Triolith HP SL230s cluster
Operated by NSC at NSC Data Centre, Linkoping .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 407.24 TFlop/s
- Rpeak
- 446.62 TFlop/s
- Rmax ÷ Rpeak
- 91.2%
- Cores
- -
- Power
- 519 kW
- Per watt
- 0.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Triolith, and those in Sweden. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 407.24 TFlop/s | #85 of 193 · top 44% | #11 of 18 · bottom 42% |
| Energy efficiency | 0.8 GF/W | #103 of 149 · bottom 32% | #6 of 8 · bottom 30% |
| Rmax ÷ Rpeak | 91.2 % | #19 of 192 · top 9% | #1 of 18 · highest |
| Power draw | 519 kW | #66 of 151 · top 43% | #3 of 8 · top 29% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HP Cluster Platform 3000 SL230s Gen8 | Hewlett Packard Enterprise | - | Reported | top500.orgnsc.liu.se |
| CPU | - Intel Xeon E5-2660 Sandy Bridge 8-core 2.2 GHz | Intel | - | Reported | nsc.liu.setop500.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond Mellanox Infiniband FDR | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | nsc.liu.se |
Engineering, funding and access
What Triolith runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,017 nodesFinal size after the 3 April 2017 reduction: 896 thin, 48 fat, 7 GPU or Xeon Phi, 2 huge, 12 analysis and 52 WLCG grid nodes; 1,600 nodes at the November 2013 peak | 2018-09 | Operator stated | nsc.liu.se |
| Total memory | 35 TBTotal at retirement; thin nodes had 32 GB DDR3 each | 2018-09 | Operator stated | nsc.liu.se |
| Interconnect and topology | Mellanox InfiniBand FDR, about 1 microsecond latency and 7 GB/s MPI bandwidth, 56 Tbit/s aggregate | 2018-09 | Operator stated | nsc.liu.se |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | NSC Centre Storage global file system shared with Gamma, plus 500 GB of local scratch per node (500 TB in all) | 2018-09 | Operator stated | nsc.liu.se |
| Job scheduler | Slurm | 2018-09 | Operator stated | nsc.liu.se |
| Programming and software stack | CentOS Linux 6 | 2018-09 | Operator stated | nsc.liu.se |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | HP Cluster Platform 3000 (SL230s Gen8 and DL980 Gen7 nodes) delivered by GoVirtual AB in 2012 and expanded in 2013; budget about 60 MSEK for phases I to III over the first four years | 2018-09 | Operator stated | nsc.liu.se |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Swedish academic researchers applied for computer time through SNIC | 2018-09 | Operator stated | nsc.liu.se |
The read
NSC's flagship cluster from July 2012, an HP Cluster Platform 3000 of SL230s Gen8 nodes with Xeon E5-2660 8-core CPUs on Mellanox InfiniBand FDR, grown to 1,600 nodes by November 2013 and cut to 1,017 nodes in April 2017. NSC says it was retired on 21 September 2018 and replaced by Tetralith. TOP500 lists 25,376 cores and 407.24 teraflops Rmax, 95th on the June 2014 list; NSC counts 16,368 compute cores after the 2017 reduction, so no core count is recorded. TOP500 is the only source for Rmax and power, so the tier is reported.
Timeline
- 2012 First operational source
- 2012-06-16 Phase I of 240 nodes was delivered, opening to users on 6 July 2012 source
- 2012-11-10 Phase II made all 1,200 nodes available to users source
- 2013-11 Phase III expanded the system to 1,600 nodes source
- 2014-06 Listed at #95 on the TOP500 (June 2014) source
- 2017-04-03 Reduced by 576 nodes because funding for a replacement system was delayed source
- 2018-09-21 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added Triolith, NSC's HP SL230s cluster
Nearby in scale
The machines closest to Triolith by Rmax, smaller to larger.
- Rice (Purdue) · USA, decommissioned · 0.41 PFlop/s
- CNIC Era · China, operational · 0.41 PFlop/s
- Yemoja · Brazil, operational · 0.41 PFlop/s
- Computerome 1 · Denmark, operational · 0.41 PFlop/s
- NETL HPCEE · USA, operational · 0.41 PFlop/s
- HA-PACS · Japan, decommissioned · 0.42 PFlop/s
Related systems
Same site
- Bifrost · Sweden, operational, 2015
- Neolith · Sweden, operational, 2007
- Stratus (NSC) · Sweden, operational, 2018
- Tetralith · Sweden, decommissioned, 2018
- Berzelius · Sweden, operational, 2021
Same operator
- NSC Monolith · Sweden, operational, 2002
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| nsc.liu.se | names system and part | Mellanox InfiniBand FDR |
| top500.org | names system and part | Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.