Supercomputers/Systems/fortythree
Germany · operational · ai training
fortythree
Also known as hessian.AI 43; forty.THREE
Operated by hessian.AI at GSI Helmholtz Centre (Darmstadt) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 11.27 PFlop/s
- Rpeak
- 14.86 PFlop/s
- Rmax ÷ Rpeak
- 75.8%
- Cores
- 39,712
- Power
- 259.2 kW
- Per watt
- 43.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of fortythree, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 11.27 PFlop/s | #116 of 234 · top 49% | #12 of 95 · top 12% |
| Energy efficiency | 43.5 GF/W | #52 of 121 · top 43% | #12 of 68 · top 16% |
| Rmax ÷ Rpeak | 75.8 % | #106 of 231 · top 46% | #43 of 94 · top 45% |
| Power draw | 259 kW | #84 of 126 · bottom 35% | #44 of 69 · bottom 38% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - 35 HPE Cray XD670 servers | Hewlett Packard Enterprise | 35 reported | Verified | hessian.aitop500.org |
| Accelerator | NVIDIA H100 SXM5 Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 280 NVIDIA H100 GPUs, eight per server | NVIDIA | 280 reported | Verified | hessian.aitop500.org |
| CPU | - Xeon Platinum 8480+ 56C 2GHz | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Infiniband NDR | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What fortythree runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | NVIDIA InfiniBand NDR | 2026-06 | Operator stated | top500.org |
| Cooling design | Direct water cooling, which hessian.AI credits for the low energy consumption | 2024-12-03 | Operator stated | hessian.ai |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Rocky Linux 8.9 operating system | 2026-06 | Operator stated | top500.org |
| Programming and software stack | NVIDIA NGC HPL 23.3 binary, cuBLAS 12.6 and OpenMPI 4.1.5 for the TOP500 HPL run | 2026-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Three Hessian ministries and the German Federal Ministry of Education and Research (BMBF) fund the hessian.AI initiative; the AI Innovation Lab is funded by HMD, the AI Lab by HMWK and the AI Service Center by BMBFNo amounts stated | 2024-12-03 | Operator stated | hessian.ai |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Through the hessian.AI AI Innovation Lab, which gives companies and research institutions access to the cluster, including AI start-ups, AI Startup Rising projects, EDITH project partners and Hessian SMEs | 2024-12-03 | Operator stated | hessian.ai |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2024: 108th on the November 2024 TOP500 (8th among 41 German installations) and 42nd on the Green500 | 2024-11 | Operator stated | hessian.ai |
The read
The first expansion stage of hessian.AI's fortytwo supercomputer, in the Green IT Cube at GSI in Darmstadt. hessian.AI's infrastructure page lists 280 NVIDIA H100 GPUs in 35 HPE Cray XD670 servers, each with dual Xeon Platinum processors and eight H100s; its 3 December 2024 announcement states 108th on the November 2024 TOP500, 42nd on the Green500 and direct water cooling. TOP500 lists Xeon Platinum 8480+ hosts, H100 SXM5 80GB on InfiniBand NDR, 39,712 cores, 11.27 PFlop/s Rmax, 14.86 PFlop/s Rpeak and 259.2 kW under Rocky Linux 8.9, then ranks of 130th, 152nd and 172nd to June 2026. It is a separate installation from fortytwo, the A100 system, which is its own row.
Timeline
- 2024 First operational source
- 2024-11 Listed at #42 on the Green500 (November 2024) source
- 2024-12-03 Announced source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- GPU count source: 280 H100 in 35 servers, cited to hessian.AI infrastructure page against The page describes only fortytwo (79 nodes, 632 A100) and does not mention fortythree. The cited page does not support the recorded figure.
Change history
- 2026-10-02 Added fortythree, hessian.AI's H100 expansion
Nearby in scale
The machines closest to fortythree by Rmax, smaller to larger.
- CWA FX1000 · Taiwan, operational · 11.16 PFlop/s
- Cycloud ML Platform · Japan, operational · 10.82 PFlop/s
- Torch · USA, operational · 10.79 PFlop/s
- DeepL Ceres · Sweden, operational · 11.3 PFlop/s
- Carpenter · USA, operational · 11.62 PFlop/s
- Christofari Neo · Russia, operational · 11.95 PFlop/s
Related systems
Same site
- fortytwo · Germany, operational, 2023
- GSI Virgo Cluster · Germany, operational, 2020
- L-CSC · Germany, operational, 2014
Same accelerator
- ARF-ACC · Turkey, operational, 2024
- Arka AI/ML · India, operational, 2024
- ASPIRE 2A+ · Singapore, operational, 2024
- BioHive-2 · USA, operational, 2024
- CHIE-2 · Japan, operational, 2024
- CHIE-3 · Japan, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hessian.ai | names system only | - |
| top500.org | does not name this system | NVIDIA H100 SXM5, NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.