COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Adastra 2

France · operational · mixed

Adastra 2

Also known as Adastra2; Adastra MI300A partition

Operated by GENCI at CINES .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
2.53 PFlop/s
HPL measured
Rpeak
4.06 PFlop/s
Rmax ÷ Rpeak
62.3%
Cores
16,128
Power
36.6 kW
Per watt
69.1 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Adastra 2, and those in France. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax2.53 PFlop/s#222 of 234 · bottom 6%#22 of 52 · top 41%
Energy efficiency69.1 GF/W#1 of 121 · highest#1 of 42 · highest
Rmax ÷ Rpeak62.3 %#189 of 231 · bottom 19%#44 of 51 · bottom 15%
Power draw37 kW#125 of 126 · bottom 2%#42 of 42 · bottom 1%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray EX4000 cabinet with 14 EX255a blades
Hewlett Packard Enterprise - Verified hpcwire.comtop500.org
Accelerator AMD Instinct MI300A
Accelerators
ROCm (CDNA 3) · TSMC N5/N6 · 550 W
28 nodes with 4 AMD Instinct MI300A APUs each
AMD 112
reported
Verified dci.dci-gitlab.cines.frhpcwire.com
CPU AMD 4th Gen EPYC 24C (in MI300A)
CPUs
x86-64 · 24C · 1.8 GHz · TSMC N5
24 Zen 4 cores per MI300A APU (AMD 4th Gen EPYC 24C 1.8GHz)
AMD - Reported top500.org
Interconnect HPE Slingshot-11
Interconnect
Dragonfly · 200 Gb/s per port · Around 2 microseconds
HPE Slingshot-11, one 200 Gb/s NIC per APU
Hewlett Packard Enterprise - Verified dci.dci-gitlab.cines.frhpcwire.com
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
Red Hat Enterprise Linux
Red Hat
IBMNYSE rolls up to IBM
- Reported top500.org

The read

The AMD Instinct MI300A extension of GENCI's Adastra, hosted and run by CINES in Montpellier; the MI250X/Genoa original is the adastra row. GENCI's announcement of 14 November 2023 (reproduced by HPCwire) planned 112 MI300A APUs in one new HPE Cray EX4000 cabinet holding 14 EX255a blades, i.e. 28 nodes with four APUs each and one 200 Gbps Slingshot NIC per APU, after GENCI and CINES decided on the extension in October 2023. CINES's architecture page now lists it as the Accelerated (MI300A) partition: 28 nodes, 512 GiB of HBM3 shared by CPU and GPU per node and 6.98 PFlop/s theoretical FP64 (the same page says HBM2 once, an internal inconsistency); it does not use the name Adastra 2, whereas TOP500 does. TOP500 (system 180319) lists 16,128 cores, 2.53 PFlop/s Rmax, 4.06 PFlop/s Rpeak and 36.6 kW at measurement level 1, installation year 2024, and ranks it 484th in June 2025; it is not on the November 2025 list. The TOP500 Rpeak (4.06) and CINES's theoretical FP64 (6.98) differ and neither source explains why. No exact go-live date was found, so only the installation year is recorded.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

CINES

Location
Montpellier, France
Commissioned
2022

Change history

Nearby in scale

The machines closest to Adastra 2 by Rmax, smaller to larger.

Same site

Same operator

Same accelerator

Further reading