COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/PARAM Rudra (GMRT)

India · operational · hpc

PARAM Rudra (GMRT)

Operated by TIFR .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
operator stated
Rpeak
1.00 PFlop/s
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
C-DAC designed and commissioned; Rudra servers supplied by VVDN Technologies (Gurgaon)
C-DAC
- Reported nsmindia.incdac.in
Accelerator -
45 GPU compute nodes, 90 NVIDIA A100 PCIe per NSM sheet
NVIDIA 90
reported
Reported nsmindia.in
CPU -
2 x Intel Xeon Gold 6240R 24C 2.4GHz per node
Intel - Reported nsmindia.in
Interconnect NVIDIA InfiniBand HDR
Interconnect
Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds
100Gbps Mellanox InfiniBand HDR, non-blocking fat tree
NVIDIA - Reported nsmindia.in

The read

PARAM Rudra at the Giant Metrewave Radio Telescope near Pune (operated by NCRA, part of TIFR), one of three PARAM Rudra facilities dedicated on 27 September 2024 together with IUAC (param-rudra-iuac) and SNBNCBS Kolkata (param-rudra-snbncbs). C-DAC's release describes a 1 PFlop/s facility with a GPU in every node, aimed at radio-astronomy work such as fast radio bursts; the NSM page's own spec table instead gives Rpeak 1.3 PFlop/s, and both are noted here with 1.0 recorded as the headline figure. The NSM sheet lists nodes with two Xeon Gold 6240R 24-core 2.4 GHz processors, 45 GPU nodes (90 NVIDIA A100 PCIe cards) plus 15 GPU-ready nodes, 37.68 TB of memory, a 100 Gb/s Mellanox HDR InfiniBand non-blocking fat tree and 2.0 PiB of storage; that sheet is internally inconsistent on the GPU node count (its node tables show two A100 on both groups), so the 90-card figure is the page's own headline and not independently confirmed. The servers are Rudra-series machines transferred by C-DAC to Indian manufacturers, with VVDN Technologies supplying this batch.

Timeline

Change history

Further reading