Israel · operational · ai training

SDS-AI

Also known as SDS Shonfeld AI supercomputer

Operated by SDS Shonfeld at SDS Bet Yehoshua AI Data Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator NVIDIA B200 SXM
Accelerators
CUDA (Blackwell) · TSMC 4NP · 1,000 W
2,032 NVIDIA Blackwell B200 processors
NVIDIA 2,032
reported
Reported calcalistech.com
Storage -
VAST Data storage, tens of petabytes
VAST Data
- Reported en.globes.co.il

The read

A roughly NIS 1 billion (about $300 million) Nvidia Blackwell cluster built by the Israeli data-centre operator SDS and billed as Israel's first open-access AI supercomputer for local business and academia. Calcalist counts 2,032 B200 processors and says it was due to launch in September 2025 with expansion planned for 2026; Globes places the build at Bet Yehoshua with about 2,000 B200 GPUs and VAST Data storage, first reported in August 2024 and acknowledged by SDS on 5 October 2025. Calcalist rates it at 6.5 to 6.8 times Nvidia's Israel-1. No power figure appears in either page, and neither page gives an interconnect, so none is recorded.

Timeline

Site & facility

SDS Bet Yehoshua AI Data Center

Location
Bet Yehoshua, Israel
Commissioned
2025

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
en.globes.co.ildoes not name this systemNVIDIA B200 SXM
calcalistech.comnames system, part and countNVIDIA B200 SXM · counts: 2032

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading