Supercomputers/Systems/Theta
USA · decommissioned · hpc
Theta
Operated by Argonne National Laboratory at Argonne Leadership Computing Facility .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 5.88 PFlop/s
- Rpeak
- 9.63 PFlop/s
- Rmax ÷ Rpeak
- 61.1%
- Cores
- 231,424
- Power
- 1.09 MW
- Per watt
- 5.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Cray XC40 | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | top500.orgweb.archive.org |
| Interconnect | Cray Aries Interconnect Dragonfly · About 10 GB/s per direction · Around 1 microsecond Cray Aries interconnect, three-tier dragonfly | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | cug.org |
| Operating system | Cray Linux Environment Operating systems Linux, Cray-customised · Proprietary layer over open-source Linux Cray Linux Environment | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | top500.org |
The read
Argonne's Cray XC40 of Xeon Phi 7230 nodes, sixteenth on the June 2017 TOP500 at 231,424 cores, retired at the end of 2023 according to ALCF and Argonne, which are one organization and reachable here only through archived copies. TOP500 kept listing it until 2025. The later ThetaGPU expansion is not recorded. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
- 2017-06 List debut at #16 (June 2017) source
- 2017-07 First operational source
- 2023-12 Retired at year end; ThetaGPU hardware later repurposed into a new system, Sophia source
- 2023-12 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Argonne Leadership Computing Facility
- Location
- Lemont, IL, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 2006
Change history
- 2026-09-20 Added with a rank pointer on the edition where it ranked highest
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| web.archive.org | names system only | - |
| top500.org | names system and part | Cray Aries, Cray Linux Environment |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Programming a supercomputer
The software stack beneath the application, and why the OS is now a sovereignty signal as much as a technical choice.