Supercomputers/Systems/Fermi
Italy · decommissioned · hpc
Fermi
Also known as FERMI Blue Gene/Q at CINECA
Operated by CINECA .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.79 PFlop/s
- Rpeak
- 2.10 PFlop/s
- Rmax ÷ Rpeak
- 85.3%
- Cores
- 163,840
- Power
- 822 kW
- Per watt
- 2.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Fermi, and those in Italy. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.79 PFlop/s | #17 of 193 · top 8% | #17 of 21 · bottom 21% |
| Energy efficiency | 2.2 GF/W | #26 of 149 · top 17% | #12 of 14 · bottom 16% |
| Rmax ÷ Rpeak | 85.3 % | #56 of 192 · top 29% | #3 of 20 · top 11% |
| Power draw | 822 kW | #48 of 151 · top 31% | #10 of 14 · bottom 32% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM BlueGene/Q | IBM | - | Reported | top500.orghpc.cineca.it |
| CPU | IBM PowerPC A2 (Power BQC) CPUs PowerPC A2 · 18C · 1.6 GHz · 45 nm · 55 W Power BQC 16C 1.60GHz | IBM | - | Reported | top500.orghpc.cineca.it |
| Interconnect | IBM BlueGene/Q 5D torus Interconnect 5D torus · 2 GB/s per link per direction Custom Blue Gene/Q interconnect | IBM | - | Reported | top500.org |
Engineering, funding and access
What Fermi runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Total memory | 163.84 TB16 GB per 16-core PowerA2 processor (1 GB per core) x 10,240 processors = 163,840 GB by our arithmetic. | 2012-06 | Operator stated | hpc.cineca.it |
| Storage capacity | 10 PBI/O subsystem of total capacity in the order of ten PB, with front-end bandwidth above 100 GB/s. | 2012-06 | Operator stated | hpc.cineca.it |
| Cooling design | Liquid cooling combined with free-air cooling; CINECA cites a PUE in the order of 1.15 | 2012-06 | Operator stated | hpc.cineca.it |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | ISCRA, with 200 million core hours a year on FERMI allocated by peer review with an international panel (Class B projects of 1M to 10M core hours), and PRACE Tier-0 Project Access callsIn March 2014 ISCRA Class C requests on FERMI were temporarily suspended; FERMI was offered in the 9th PRACE Project Access call. | 2014-03 | Operator stated | hpc-forge.cineca.it |
The read
CINECA's IBM Blue Gene/Q, Italy's national tier-0 system and a PRACE resource, with 10,240 PowerA2 processors of 16 cores each (163,840 cores), seventh on the June 2012 TOP500. CINECA's news item confirms the hardware and the June 2012 install; Wikipedia gives full production from 8 August 2012. CINECA's Marconi page says Marconi replaced FERMI in June 2016, which is why the year 2016 is recorded as the end date. The system stayed on the TOP500 through June 2017. TOP500 is the only source for Rmax, Rpeak and power, so the tier is reported. Site left blank because the fetched sources place it at CINECA's Casalecchio di Reno campus rather than at a site already in this dataset.
Timeline
- 2012-06 Listed at #7 on the TOP500 (June 2012) source
- 2012-08 First operational source
- 2016 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Fermi, the CINECA Blue Gene/Q, seventh on the June 2012 TOP500
Nearby in scale
The machines closest to Fermi by Rmax, smaller to larger.
- RE1A (Flatiron) · USA, operational · 1.77 PFlop/s
- G42 POD3 · United Arab Emirates, operational · 1.76 PFlop/s
- Jaguar · USA, upgraded · 1.76 PFlop/s
- IMS Molecular Simulator · Japan, operational · 1.79 PFlop/s
- State Grid ESSystem · China, operational · 1.79 PFlop/s
- Beskow · Sweden, decommissioned · 1.8 PFlop/s
Related systems
Same operator
- Eurora · Italy, operational, 2013
- Galileo · Italy, decommissioned, 2015
- Marconi · Italy, decommissioned, 2016
- Marconi-100 · Italy, decommissioned, 2020
- Galileo100 · Italy, operational, 2021
- Leonardo · Italy, upgraded, 2022
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.cineca.it | names system only | - |
| top500.org | names system and part | IBM BlueGene/Q 5D torus |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.