Supercomputers/Systems/Reedbush-H
Japan · decommissioned · mixed
Reedbush-H
Also known as Reedbush (GPU 2 per node)
Operated by University of Tokyo .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 800.00 TFlop/s
- Rpeak
- 1.42 PFlop/s
- Rmax ÷ Rpeak
- 56.3%
- Cores
- 17,760
- Power
- 93.57 kW
- Per watt
- 8.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Reedbush-H, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 800.00 TFlop/s | #175 of 234 · bottom 26% | #79 of 131 · bottom 41% |
| Energy efficiency | 8.5 GF/W | #26 of 158 · top 16% | #26 of 74 · top 34% |
| Rmax ÷ Rpeak | 56.3 % | #204 of 229 · bottom 12% | #118 of 130 · bottom 10% |
| Power draw | 94 kW | #148 of 161 · bottom 9% | #62 of 74 · bottom 17% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - SGI Rackable C1102-GP8, 120 nodes | Hewlett Packard Enterprise | - | Reported | top500.orgcc.u-tokyo.ac.jp |
| Accelerator | NVIDIA Tesla P100 Accelerators CUDA (Pascal GP100) · 3,584C · 1.48 GHz · 16 nm · 300 W 120 nodes with two Tesla P100 SXM2 each (240 GPUs) | NVIDIA | 240 reported | Verified | cc.u-tokyo.ac.jptop500.org |
| CPU | Intel Xeon E5-2695 v4 CPUs x86-64 · 18C · 2.1 GHz · 14 nm · 120 W Xeon E5-2695v4 18C 2.1GHz, two per node | Intel | 240 estimated | Reported | top500.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond Infiniband FDR | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Reedbush-H runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 120 nodesSGI Rackable C1102-GP8 nodes with two Xeon E5-2695 v4, 256 GB and two Tesla P100 each. | 2021-11 | Operator stated | cc.u-tokyo.ac.jpcc.u-tokyo.ac.jp |
| Total memory | 30 TBHost memory; each P100 adds 16 GB. | 2021-11 | Operator stated | cc.u-tokyo.ac.jp |
| Storage capacity | 5.04 PBLustre file system shared by Reedbush-U, H and L. | 2021-11 | Operator stated | cc.u-tokyo.ac.jp |
| Interconnect and topology | InfiniBand FDR 4x with two links per node (2 x 56 Gb/s) in a full-bisection fat tree; GPUs linked by NVLink | 2021-11 | Operator stated | cc.u-tokyo.ac.jp |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre on DDN SFA14KE with 3 OSS servers, 5.04 PB at 145.2 GB/s, shared by Reedbush-U, H and L, plus DDN IME burst-buffer caches of 209 TB (IME14K) and 153.6 TB (IME240) | 2021-11 | Operator stated | cc.u-tokyo.ac.jp |
| Programming and software stack | Red Hat Enterprise Linux 7; PGI compilers with OpenACC 2.0 and CUDA Fortran, and NVCC; Open MPI and MVAPICH2-GDR with GPUDirect RDMA | 2021-11 | Operator stated | cc.u-tokyo.ac.jp |
| Programming and software stack | GPU libraries and frameworks including cuBLAS, cuFFT, MAGMA, TensorFlow, Torch, Caffe and Chainer | 2021-11 | Operator stated | cc.u-tokyo.ac.jp |
The read
University of Tokyo Information Technology Center GPU subsystem: 120 SGI Rackable C1102-GP8 nodes, each with two Xeon E5-2695 v4 and two Tesla P100 (240 GPUs), 1,418 TFLOPS peak on InfiniBand FDR. The first time the centre adopted accelerators in a supercomputer, aimed at big data and machine learning. Part of the three-subsystem Reedbush complex (U, H, L) sharing a 5.04 PB Lustre file system. Ranked 204th on the June 2017 TOP500. Reedbush service ended in November 2021.
Timeline
- 2017 First operational source
- 2017-06 Listed at #204 on the TOP500 (June 2017) source
- 2021-11 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Reedbush-H, the University of Tokyo's Tesla P100 subsystem, 204th on the June 2017 TOP500
Nearby in scale
The machines closest to Reedbush-H by Rmax, smaller to larger.
- Suiren2 · Japan, operational · 0.8 PFlop/s
- Sunway BlueLight MPP · China, operational · 0.8 PFlop/s
- Draco · Germany, decommissioned · 0.79 PFlop/s
- PALMA II · Germany, operational · 0.8 PFlop/s
- ATERUI I · Japan, decommissioned · 0.8 PFlop/s
- Reedbush-L · Japan, decommissioned · 0.81 PFlop/s
Related systems
Same operator
- Reedbush-L · Japan, decommissioned, 2017
- Reedbush-U · Japan, decommissioned, 2016
- Oakbridge-CX · Japan, decommissioned, 2019
- Shirokane3 · Japan, operational, 2015
- mdx I · Japan, operational, 2021
- Wisteria/BDEC-01 · Japan, operational, 2021
Same accelerator
- AIST AI Cloud · Japan, operational, 2017
- Cedar (SFU) · Canada, decommissioned, 2017
- CNIC Era-AI · China, operational, 2017
- Facebook DGX-1 Cluster · USA, operational, 2017
- Graham · Canada, decommissioned, 2017
- Kukai · Japan, operational, 2017
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| cc.u-tokyo.ac.jp | names system, part and count | NVIDIA Tesla P100, Intel Xeon E5-2695 v4, Mellanox InfiniBand FDR · counts: 240, 240 |
| top500.org | names system and part | NVIDIA Tesla P100, Intel Xeon E5-2695 v4, Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.