COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/BNY DGX SuperPOD

USA · operational · ai training

BNY DGX SuperPOD

Operated by BNY .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Built on the NVIDIA DGX SuperPOD reference architecture; deployed with NVIDIA Professional Services
NVIDIA - Reported blogs.nvidia.combny.com
Accelerator NVIDIA H100 SXM5
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
Dozens of NVIDIA DGX H100 systems (exact system and GPU count not published)
NVIDIA - Reported blogs.nvidia.combny.com
Interconnect -
NVIDIA InfiniBand networking (generation not stated)
NVIDIA - Reported blogs.nvidia.combny.com

The read

BNY (formerly BNY Mellon) announced itself as the first global bank to deploy an AI supercomputer built on the NVIDIA DGX SuperPOD reference architecture with DGX H100 systems. Both NVIDIA's blog and BNY's own newsroom, whose pages carry the date 18 March 2024, describe the system as dozens of NVIDIA DGX systems with NVIDIA InfiniBand networking, deployed with NVIDIA Professional Services and completed ahead of typical timelines. Neither source gives an exact DGX or GPU count, a location, or performance figures, so no quantity, site or FLOPS is recorded and the two pages are treated as one joint announcement, which keeps the tier at reported. The status date is the date shown on those pages rather than a verified commissioning date. No TOP500 submission exists.

Timeline

No dated events recorded.

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
blogs.nvidia.comnames system and partNVIDIA H100 SXM5
bny.comnames system and partNVIDIA H100 SXM5

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading