Supercomputers/Systems/ASEAN-Korea HPC Facility
Indonesia · operational · mixed
ASEAN-Korea HPC Facility
Also known as KADIF HPC at BRIN; ASEAN shared supercomputer
Operated by BRIN at BRIN Cibinong Data Centre .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.10 PFlop/s
- Rpeak
- 4.28 PFlop/s
- Rmax ÷ Rpeak
- 72.4%
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Built by KISTI for the Korea-ASEAN Digital Innovation Flagship, hosted at BRIN | KISTI | - | Reported | digitaltoday.co.kr |
The read
ASEAN's first shared HPC facility, hosted by BRIN and Korea's KISTI under the Korea-ASEAN Digital Innovation Flagship (a US$10 million project over 2024-2028 per DigitalToday). Hardware was received at BRIN's Soekarno Science and Technology Area in Cibinong on 21 April 2026 and the facility was launched on 18 June 2026. RRI reports 4.28 petaflops peak and 3.10 petaflops maximum tested performance, with 10 GbE access through ID-REN; the Jakarta Post rounds these to 4.2 and 3.2 PF. The fetched sources give no accelerator model or count, so none is recorded; the KISTI integrator edge rests on DigitalToday describing the machine as built by South Korea.
Timeline
- 2026-06 First operational source
Site & facility
BRIN Cibinong Data Centre
- Location
- Cibinong, Indonesia
- Commissioned
- 2026
Change history
- 2026-10-02 Added the ASEAN-Korea HPC Facility at BRIN Cibinong
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| thejakartapost.com | names system only | - |
| rri.co.id | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.