Supercomputers/Systems/ASCI White
USA · decommissioned · classified
ASCI White
Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 32 of 52 systems have a readable citation that names them, and 4 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 4.94 TFlop/s
- Rpeak
- 12.29 TFlop/s
- Rmax ÷ Rpeak
- 40.2%
- Cores
- 8,192
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM RS/6000 SP Power3 | IBM | - | Reported | hpc.llnl.govenergy.gov |
| CPU | IBM POWER3-II CPUs IBM RS/6000 SP Power3 | IBM | - | Reported | hpc.llnl.govenergy.gov |
| Interconnect | IBM SP Switch2 Interconnect SP Switch2 | IBM | - | Reported | hpc.llnl.govenergy.gov |
| Storage | IBM Spectrum Scale ESS (GPFS) Storage IBM GPFS | IBM | - | Reported | hpc.llnl.govenergy.gov |
The read
The last IBM system to reach No. 1 on RISC processors alone, before the BlueGene argument replaced fast cores with many slow ones. 106 tonnes of machine delivered on 28 trucks, and its bill of materials is one company: IBM supplied the processor, the SP Switch2 fabric and the integration.
Timeline
- 1996 Announced source
- 2000-06 First operational source
- 2000-11 List debut at #1 (November 2000) source
- 2006 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.llnl.gov | does not name this system | - |
| energy.gov | names system only | - |
Checked 2026-09-08 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.