COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Home/AI datacenters

Section

AI datacenters, beyond the GPU count

The dataset holds 280 AI training and inference datacenters and clusters. 168 of them have an accelerator count, 223 have at least one figure from the AI metrics table, and only 14 state a PUE. That gap is the finding: no independent body measures AI datacenters on a common workload, so there is no ranked list, and almost every number here is stated by the operator or estimated by someone else. This section records those numbers with who stated them, and the benchmarks page covers what is measured at system scale (MLPerf, InferenceX), what operators publish about efficiency and failures, and how far each can be trusted.

Nothing on this page is a ranking. Accelerator counts, megawatts and investment figures are not comparable unless they cover the same scope, and they rarely do: IT load, total campus power and a planned build-out are different quantities. Every figure carries its basis (operator stated, regulatory filing, third-party estimate or design target) on the system's page.

Explore

  • Big tech
  • AI labs
  • GPU clouds
  • Other operators
Stated power of AI datacenters by first-operational year Log-scale dot plot of the stated or estimated power in megawatts of each AI datacenter in the dataset that has a figure, by the year it first ran or was announced, coloured by operator sector. 1101001000100002018201920202021202220232024202520262027 Isambard-AI Phase 2 Other operators 5.00 MW, 2025.4583333333333 ABCI 3.0 Other operators 6.00 MW, 2025.4583333333333 xAI Colossus AI labs 150 MW, 2024.5416666666667 Stargate Abilene Big tech 590 MW, 2025.4583333333333 Microsoft Fairwater (Atlanta) Big tech 859 MW, 2025.875 Microsoft Fairwater (Wisconsin) Big tech 442 MW, 2026.4583333333333 Project Rainier Big tech 1.09e+3 MW, 2025.7916666666667 Stargate UAE Neoclouds 1.00e+3 MW, 2025.375 Google TPU (Ironwood) capacity for Anthropic Big tech 1.00e+3 MW, 2025.7916666666667 Microsoft Azure AI supercomputer (Loughton, UK) Big tech 90.0 MW, 2025.7083333333333 Microsoft Azure AI datacenter (Narvik, Norway) Big tech 230 MW, 2025.7083333333333 Mistral Campus AI (Bruyeres-le-Chatel) AI labs 44.0 MW, 2025.4583333333333 Meta Prometheus Big tech 612 MW, 2025.5416666666667 Meta Hyperion Big tech 2.26e+3 MW, 2024.9583333333333 xAI Colossus 2 AI labs 1.28e+3 MW, 2026.0416666666667 Opera Iceland KEF-1 SuperPOD Big tech 83.0 MW, 2024.4583333333333 Crusoe Abilene Campus (Microsoft) Neoclouds 900 MW, 2026.2083333333333 SINES Data Campus GB300 Deployment Big tech 1.20e+3 MW, 2026.4583333333333 Firebird Armenian AI Factory (DC-1) Neoclouds 300 MW, 2026.625 USIO Neoclouds 100 MW, 2025.7083333333333 Cerebras Guyana AI Data Center Other operators 100 MW, 2025.875 Lambda Kansas City AI Factory Neoclouds 100 MW, 2025.7916666666667 IREN Childress Horizons 1-4 (Microsoft) Neoclouds 750 MW, 2026.625 Polaris Forge 1 (Ellendale) Neoclouds 250 MW, 2025.7916666666667 Stargate Shackelford County (Frontier) Big tech 1.40e+3 MW, 2025.625 Stargate Milam County Neoclouds 1.20e+3 MW, 2026.0416666666667 Stargate Project Jupiter (New Mexico) Big tech 900 MW, 2025.7083333333333 Stargate Port Washington (Lighthouse) Big tech 1.00e+3 MW, 2025.7916666666667 Taiwan AI Factory Neoclouds 25.0 MW, 2026.2083333333333 du NextGenAI Supercluster Big tech 13.0 MW, 2025.7916666666667 Galaxy Helios (CoreWeave) Neoclouds 200 MW, 2026.5416666666667 River Bend (Fluidstack) Neoclouds 330 MW, 2025.9583333333333 Barber Lake (Fluidstack) Neoclouds 244 MW, 2025.7083333333333 Polaris Forge 2 (Harwood) Neoclouds 200 MW, 2025.7916666666667 Abernathy (Fluidstack) Neoclouds 168 MW, 2025.7916666666667 CoreWeave Lancaster AI Data Center Neoclouds 300 MW, 2025.5416666666667 Nebius Kansas City Cluster Neoclouds 40.0 MW, 2025.2916666666667 Nebius Mäntsälä Cluster Neoclouds 75.0 MW, 2024.7916666666667 Nebius Lappeenranta AI Factory Neoclouds 310 MW, 2026.2083333333333 Nebius Independence AI Factory Neoclouds 1.20e+3 MW, 2026.2083333333333 Nebius Vineland (Microsoft) Neoclouds 300 MW, 2025.875 TELUS BC Sovereign AI Cluster Big tech 150 MW, 2026.375 Campus AI Fouju Neoclouds 1.40e+3 MW, 2025.4583333333333 SoftBank Tomakomai AI Data Center Big tech 300 MW, 2025.2916666666667 Yotta D2 Blackwell Ultra Cluster Neoclouds 60.0 MW, 2026.125 Nebius Modiin Cluster Neoclouds 8.00 MW, 2025.7916666666667 HUMAIN AI Factory Phase 1 Neoclouds 500 MW, 2025.375 Coatlicue Other operators 20.0 MW, 2025.875 HUMAIN Qualcomm AI 100 Cluster Neoclouds 200 MW, 2025.7916666666667 Meta Lebanon (Indiana) Big tech 1.00e+3 MW, 2026.125 Meta El Paso (Texas) Big tech 1.00e+3 MW, 2025.7916666666667 Justified Data (Anthropic) AI labs 401 MW, 2026.5416666666667 Google Pryor North TPU Campus Big tech 368 MW, 2024.5416666666667 Google Columbus TPU Campus Big tech 303 MW, 2024.2916666666667 Google New Albany TPU Campus Big tech 333 MW, 2024.2916666666667 Google Council Bluffs East TPU Campus Big tech 237 MW, 2024.875 AWS Madison Mega Site (Canton) Big tech 284 MW, 2025.4583333333333 AWS Ridgeland Campus Big tech 228 MW, 2026.375 Microsoft Project Osmium Big tech 190 MW, 2021.0416666666667 Microsoft Goodyear AI Datacenter Big tech 202 MW, 2023.2916666666667 Meta Rosemount (Minnesota) Big tech 178 MW, 2024.2083333333333 Meta Montgomery (Alabama) Big tech 153 MW, 2024.375 Meta Cheyenne (Wyoming) Big tech 152 MW, 2024.5416666666667 xAI Atlanta AI labs 17.0 MW, 2025.125 Muskogee (CoreWeave) Neoclouds 100 MW, 2024.875 CoreWeave Kenilworth (NEST) Neoclouds 250 MW, 2025.625 Bell AI Fabric Saskatchewan Big tech 300 MW, 2026.2083333333333 CoreWeave Cambridge (Cohere) Neoclouds 64.0 MW, 2025.625 Scala AI City Neoclouds 54.0 MW, 2024.7083333333333 Omnia Pecem (TikTok) Neoclouds 300 MW, 2025.4583333333333 Project Jade (Cheyenne) Other operators 2.70e+3 MW, 2025.5416666666667 Delta Forge 1 (Rapides Parish) Neoclouds 430 MW, 2026.2916666666667 Cipher Black Pearl (AWS) Neoclouds 300 MW, 2025.875 Nebius Birmingham AI Factory Neoclouds 300 MW, 2026.125 Wonder Valley AI Campus Neoclouds 7.50e+3 MW, 2024.9583333333333 Nscale Verne Iceland Cluster Neoclouds 15.0 MW, 2026.2916666666667 Nebius Iceland Cluster Neoclouds 10.0 MW, 2025.2083333333333 DataVolt Oxagon AI Campus Neoclouds 360 MW, 2026.625 Khazna Ajman AI Data Center Neoclouds 100 MW, 2024.7916666666667 STACKIT Lubbenau AI Data Center Big tech 200 MW, 2025.875 SK Ulsan AI Data Center Big tech 40.0 MW, 2025.4583333333333 Racks Central RCJM AI Campus Neoclouds 510 MW, 2026.4583333333333 SoftBank Sakai AI Data Center Big tech 150 MW, 2024.4583333333333 NEXTDC S7 Sydney AI Campus Neoclouds 550 MW, 2025.9583333333333 Mila Sovereign AI Research Hub Other operators 3.00 MW, 2025.7083333333333 Cerebras Montreal Inference Site (MTL-3) Other operators 5.00 MW, 2025.7916666666667 GroqCloud Sydney Inference Cluster Other operators 4.50 MW, 2025.875 GroqCloud Kamloops Inference Cluster Other operators 7.00 MW, 2025.375 Poolside Project Horizon AI labs 2.00e+3 MW, 2025.7916666666667 HUMAIN Project Halo Neoclouds 2.00e+3 MW, 2025.875 Killellan AI Growth Zone Neoclouds 600 MW, 2025.7916666666667 NVIDIA DGX SuperPOD (A100) Other operators 0.0899 MW, 2020.4583333333333 Wonder Valley AI CampusProject Jade (Cheyenne)Meta Hyperion
Each dot is one AI datacenter, on a logarithmic axis: the facility figure where there is one, otherwise IT load, otherwise the operator-claimed capacity. Planned and built capacity share the chart, so read it as the scale of ambition as much as of what is running.
Table view: Stated power of AI datacenters
SystemCountrySectorMW
Isambard-AI Phase 2United KingdomResearch HPC5
ABCI 3.0JapanResearch HPC6
xAI ColossusUSAAI labs150
Stargate AbileneUSABig tech590
Microsoft Fairwater (Atlanta)USABig tech859
Microsoft Fairwater (Wisconsin)USABig tech442
Project RainierUSABig tech1,092
Stargate UAEUnited Arab EmiratesNeoclouds1,000
Google TPU (Ironwood) capacity for AnthropicUSABig tech1,000
Microsoft Azure AI supercomputer (Loughton, UK)United KingdomBig tech90
Microsoft Azure AI datacenter (Narvik, Norway)NorwayBig tech230
Mistral Campus AI (Bruyeres-le-Chatel)FranceAI labs44
Meta PrometheusUSABig tech612
Meta HyperionUSABig tech2,260
xAI Colossus 2USAAI labs1,276
Opera Iceland KEF-1 SuperPODIcelandBig tech83
Crusoe Abilene Campus (Microsoft)USANeoclouds900
SINES Data Campus GB300 DeploymentPortugalBig tech1,200
Firebird Armenian AI Factory (DC-1)ArmeniaNeoclouds300
USIOUgandaNeoclouds100
Cerebras Guyana AI Data CenterGuyanaIndustry100
Lambda Kansas City AI FactoryUSANeoclouds100
IREN Childress Horizons 1-4 (Microsoft)USANeoclouds750
Polaris Forge 1 (Ellendale)USANeoclouds250
Stargate Shackelford County (Frontier)USABig tech1,400
Stargate Milam CountyUSANeoclouds1,200
Stargate Project Jupiter (New Mexico)USABig tech900
Stargate Port Washington (Lighthouse)USABig tech1,000
Taiwan AI FactoryTaiwanNeoclouds25
du NextGenAI SuperclusterUnited Arab EmiratesBig tech13
Galaxy Helios (CoreWeave)USANeoclouds200
River Bend (Fluidstack)USANeoclouds330
Barber Lake (Fluidstack)USANeoclouds244
Polaris Forge 2 (Harwood)USANeoclouds200
Abernathy (Fluidstack)USANeoclouds168
CoreWeave Lancaster AI Data CenterUSANeoclouds300
Nebius Kansas City ClusterUSANeoclouds40
Nebius Mäntsälä ClusterFinlandNeoclouds75
Nebius Lappeenranta AI FactoryFinlandNeoclouds310
Nebius Independence AI FactoryUSANeoclouds1,200
Nebius Vineland (Microsoft)USANeoclouds300
TELUS BC Sovereign AI ClusterCanadaBig tech150
Campus AI FoujuFranceNeoclouds1,400
SoftBank Tomakomai AI Data CenterJapanBig tech300
Yotta D2 Blackwell Ultra ClusterIndiaNeoclouds60
Nebius Modiin ClusterIsraelNeoclouds8
HUMAIN AI Factory Phase 1Saudi ArabiaNeoclouds500
CoatlicueMexicoResearch HPC20
HUMAIN Qualcomm AI 100 ClusterSaudi ArabiaNeoclouds200
Meta Lebanon (Indiana)USABig tech1,000
Meta El Paso (Texas)USABig tech1,000
Justified Data (Anthropic)USAAI labs401
Google Pryor North TPU CampusUSABig tech368
Google Columbus TPU CampusUSABig tech303
Google New Albany TPU CampusUSABig tech333
Google Council Bluffs East TPU CampusUSABig tech237
AWS Madison Mega Site (Canton)USABig tech284
AWS Ridgeland CampusUSABig tech228
Microsoft Project OsmiumUSABig tech190
Microsoft Goodyear AI DatacenterUSABig tech202
Meta Rosemount (Minnesota)USABig tech178
Meta Montgomery (Alabama)USABig tech153
Meta Cheyenne (Wyoming)USABig tech152
xAI AtlantaUSAAI labs17
Muskogee (CoreWeave)USANeoclouds100
CoreWeave Kenilworth (NEST)USANeoclouds250
Bell AI Fabric SaskatchewanCanadaBig tech300
CoreWeave Cambridge (Cohere)CanadaNeoclouds64
Scala AI CityBrazilNeoclouds54
Omnia Pecem (TikTok)BrazilNeoclouds300
Project Jade (Cheyenne)USAIndustry2,700
Delta Forge 1 (Rapides Parish)USANeoclouds430
Cipher Black Pearl (AWS)USANeoclouds300
Nebius Birmingham AI FactoryUSANeoclouds300
Wonder Valley AI CampusCanadaNeoclouds7,500
Nscale Verne Iceland ClusterIcelandNeoclouds15
Nebius Iceland ClusterIcelandNeoclouds10
DataVolt Oxagon AI CampusSaudi ArabiaNeoclouds360
Khazna Ajman AI Data CenterUnited Arab EmiratesNeoclouds100
STACKIT Lubbenau AI Data CenterGermanyBig tech200
SK Ulsan AI Data CenterSouth KoreaBig tech40
Racks Central RCJM AI CampusMalaysiaNeoclouds510
SoftBank Sakai AI Data CenterJapanBig tech150
NEXTDC S7 Sydney AI CampusAustraliaNeoclouds550
Mila Sovereign AI Research HubCanadaIndustry3
Cerebras Montreal Inference Site (MTL-3)CanadaIndustry5
GroqCloud Sydney Inference ClusterAustraliaIndustry5
GroqCloud Kamloops Inference ClusterCanadaIndustry7
Poolside Project HorizonUSAAI labs2,000
HUMAIN Project HaloSaudi ArabiaNeoclouds2,000
Killellan AI Growth ZoneUnited KingdomNeoclouds600
NVIDIA DGX SuperPOD (A100)USAIndustry0

The systems

Click a header to sort. A dash means no figure has been recorded, not that none exists.

SystemOperatorCountryStatus AcceleratorsIT MWFacility MWClaimed MW PUEWUEInvestment ($bn)
Google TPU (Ironwood) capacity for Anthropic Alphabet USA under construction 1,000,000 plan - 1,000 plan - - - -
IREN Sweetwater Hub IREN USA under construction 700,000 plan - 2,000 2,000 - - -
Google New Albany TPU Campus Alphabet USA operational 576,400 est. 333 est. - - 1.07 - 12.6 est.
Project Rainier Amazon USA operational 500,000 910 est. 1,092 est. - - - 11
Google Columbus TPU Campus Alphabet USA operational 465,700 est. 303 est. - - 1.06 - 11.5 est.
AWS Madison Mega Site (Canton) Amazon USA operational 326,600 est. 284 est. - - - - 10.8 est.
Google Council Bluffs East TPU Campus Alphabet USA operational 305,600 est. 237 est. - - - - 9 est.
Microsoft Fairwater (Atlanta) Microsoft USA operational 304,279 est. 636 est. 859 est. - - - 24.1 est.
AWS Ridgeland Campus Amazon USA operational 261,200 est. 228 est. - - - - 8.6 est.
xAI Colossus 2 xAI USA operational 220,000 430 1,276 est. 1,000 - - 20
Stargate Abilene Oracle USA operational 201,600 est. 421 est. 590 est. 1,200 1.3 plan - 15
Microsoft Fairwater (Wisconsin) Microsoft USA operational 176,391 est. 369 est. 442 est. - - - 7
Meta Prometheus Meta Platforms USA operational 166,015 est. 471 est. 612 est. 1,000 - - 17.8 est.
Microsoft Goodyear AI Datacenter Microsoft USA operational 116,400 est. 202 est. - - - - 7.7 est.
Microsoft Project Osmium Microsoft USA operational 103,200 est. 190 est. - - - - 7.2 est.
Google Pryor North TPU Campus Alphabet USA operational 101,400 est. 368 est. - - 1.11 - 13.9 est.
Denton (CoreWeave) CoreWeave USA operational 100,000 est. 260 367 est. 260 - - 9.9 est.
STACKIT Lubbenau AI Data Center Schwarz Digits Germany under construction 100,000 plan - 200 plan 200 - - -
xAI Colossus xAI USA operational 100,000 130 150 150 - - 12.9 est.
Solstice Argonne National Laboratory USA planned 100,000 plan - - - - - -
JD Cloud 100,000-GPU Cluster JD.com China planned 100,000 plan - - - - - -
Meta Rosemount (Minnesota) Meta Platforms USA operational 85,400 est. 178 est. - - - - 0.8
Firebird Armenian AI Factory (DC-1) Firebird Armenia operational 70,000 plan - - 300 - - -
Meta Montgomery (Alabama) Meta Platforms USA operational 69,100 est. 153 est. - - - - 1.5
Meta Cheyenne (Wyoming) Meta Platforms USA operational 68,400 est. 152 est. - - - - 0.8
Galaxy Helios (CoreWeave) CoreWeave USA operational 63,151 est. 133 200 1,630 - - 5 est.
TELUS BC Sovereign AI Cluster TELUS Canada under construction 60,000 plan - 150 plan 150 - - -
Nebius Mäntsälä Cluster Nebius Finland operational 60,000 plan - 75 plan 75 1.1 0.02 -
SK Ulsan AI Data Center SK Telecom South Korea under construction 60,000 plan - 40 plan 100 - - -
Tesla Cortex Tesla USA operational 50,000 - - - - - -
Hyundai Motor Group Blackwell AI Factory Hyundai Motor Group South Korea planned 50,000 plan - - - - - -
Polaris Forge 1 (Ellendale) CoreWeave USA operational 36,900 est. 250 - 1,000 1.18 plan - 2.6 est.
Muskogee (CoreWeave) CoreWeave USA under construction 36,000 est. 70 100 70 - - -
Together AI / Hypertec Cloud GB200 Cluster Together AI USA operational 36,000 plan - - - - - -
Nebius Kansas City Cluster Nebius USA operational 35,000 plan - - 40 - - -
Google TPU v4 ML Hub (Oklahoma) Alphabet USA operational 32,768* - - - 1.11 - -
Microsoft Azure AI datacenter (Narvik, Norway) Microsoft Norway under construction 30,000 plan - 230 plan 230 - - -
Meta GenAI cluster (RoCE) Meta Platforms USA operational 24,576 - - - - - -
Meta GenAI cluster (InfiniBand) Meta Platforms USA operational 24,576 - - - - - -
Microsoft Azure AI supercomputer (Loughton, UK) Microsoft United Kingdom under construction 23,040 plan - - 90 - - -
Yotta D2 Blackwell Ultra Cluster Yotta Data Services India under construction 20,736 plan - 60 plan 60 - - 2 plan
Project Ceiba Amazon USA under construction 20,736 plan - - - - - -
XTX Research Cluster XTX Markets Iceland operational 20,000 - - - - - -
China Mobile Hohhot Computing Center China Mobile China operational 20,000 - - - - - -
GroqCloud Dammam Inference Cluster Groq Saudi Arabia operational 19,000 - - - - - -
HUMAIN AI Factory Phase 1 HUMAIN Saudi Arabia under construction 18,000 plan - - 500 - - -
Mistral Campus AI (Bruyeres-le-Chatel) Mistral AI France operational 18,000 - 44 plan 44 - - -
China Mobile Harbin Computing Center China Mobile China operational 18,000 - - - - - -
Korea National AI Computing Center Korea AI Computing Center Co. South Korea under construction 15,000 plan - - - - - -
Coatlicue National Polytechnic Institute (IPN) Mexico planned 14,480* - - 20 - - -
Eagle Microsoft USA operational 14,400 - - - - - -
SINES Data Campus GB300 Deployment Microsoft Portugal operational 12,600 - - 1,200 1.1 plan 0 plan -
xAI Atlanta xAI USA operational 12,448 17 est. - - - - 0.7
ByteDance MegaScale Cluster ByteDance China operational 12,288 - - - - - -
Cassava AI Factory Cassava Technologies South Africa operational 12,000 - - - - - -
Qingyang Enflame S60 Inference Cluster Enflame China operational 10,016 - - - - - -
Lambda Kansas City AI Factory Lambda USA under construction 10,000 plan - 100 plan 100 - - 0.5 plan
Equinox Argonne National Laboratory USA planned 10,000 plan - - - - - -
Microsoft Azure AI supercomputer for OpenAI (2020) Microsoft USA operational 10,000 - - - - - -
Fire-Flyer 2 High-Flyer China operational 10,000 - - - - - -
Industrial AI Cloud Deutsche Telekom Germany operational 10,000 - - - - - -
China Telecom Shaoguan Zhenwu Cluster China Telecom China operational 10,000 - - - - - -
Shenzhen 10,000-Card Ascend Cluster Shenzhen Municipal Government China operational 10,000 - - - - - -
Google TPU7x (Ironwood) pod Alphabet USA operational 9,216 - - - - - -
MAXIMUS-384 Core42 USA operational 9,000 - - - - - -
Google TPU v5p pod Alphabet USA operational 8,960 - - - - - -
TensorWave Tucson MI325X Cluster TensorWave USA operational 8,192* - - - - - -
Taiwan AI Factory GMI Cloud Taiwan operational 7,000* - - 25 - - -
ABCI 3.0 AIST Japan operational 6,128 - 6 - 1.15 - -
Meta Research SuperCluster (RSC) Meta Platforms USA operational 6,080 - - - - - -
Isambard-AI Phase 2 University of Bristol United Kingdom operational 5,280 - 5 - 1.08 - -
IBM Blue Vela IBM USA operational 5,000* - - - - - -
Eos NVIDIA USA operational 4,608 - - - - - -
Nscale Verne Iceland Cluster Nscale Iceland operational 4,600 15 - 15 - - -
ABCI AIST Japan decommissioned 4,352 - - - - - -
Google TPU v4 supercomputer Alphabet USA operational 4,096 - - - - - -
Jane Street Texas GPU Cluster Jane Street USA operational 4,032 - - - - - -
Nebius Modiin Cluster Nebius Israel operational 4,000 - - 8 - - -
CHIE-4 SoftBank Corp. Japan operational 4,000 - - - - - -
Naver B200 4K Cluster Naver South Korea operational 4,000 - - - - - -
Nebius Longcross UK Cluster Nebius United Kingdom operational 4,000 - - - - - -
CoreWeave AI cluster for Inflection AI CoreWeave USA operational 3,584* - - - - - -
Databricks DBRX Training Cluster Databricks USA operational 3,072 - - - - - -
Tesla Dojo Tesla USA decommissioned 3,000* - - - - - -
IBM Vela IBM USA operational 2,880* - - - - - -
Kalos (Shanghai AI Lab) Shanghai AI Laboratory China operational 2,416* - - - - - -
Seren (Shanghai AI Lab) Shanghai AI Laboratory China operational 2,288* - - - - - -
Selene NVIDIA USA operational 2,240 - - - - - -
Roche AI Factory Roche USA operational 2,176 - - - - - -
Israel-1 NVIDIA Israel operational 2,048 plan - - - - - -
NIPA (Kakao) Kakao South Korea operational 2,040 - - - - - -
SDS-AI SDS Shonfeld Israel operational 2,032* - - - - - -
RIKYU RIKEN Japan operational 1,600 - - - - - -
Chervonenkis Yandex Russia operational 1,592* - - - - - -
NVIDIA DGX SuperPOD (V100) NVIDIA USA operational 1,536 - - - - - -
Gefion Danish Centre for AI Innovation Denmark operational 1,528 - - - - - -
Lyapunov Yandex Russia operational 1,096* - - - - - -
Galushkin Yandex Russia operational 1,088* - - - - - -
SK Telecom Titan SK Telecom South Korea operational 1,040 - - - - - -
HUMAIN Qualcomm AI 100 Cluster HUMAIN Saudi Arabia under construction 1,024* 200 plan - - - - -
Dawn University of Cambridge United Kingdom operational 1,024 - - - - - -
CZI GPU Cluster Chan Zuckerberg Initiative USA operational 1,024* - - - - - -
MN-2 Preferred Networks Japan operational 1,024* - - - - - -
E2E Chennai B200 Cluster E2E Networks India operational 1,024 - - - - - -
Ubilink H100 Cluster Ubilink.AI Taiwan operational 1,024* - - - - - -
Pre-Eos NVIDIA USA operational 1,024 est. - - - - - -
LillyPod Eli Lilly USA operational 1,016 - - - - - -
Nabuchodonosor Scaleway France operational 1,016 - - - 1.25 0.25 -
Haein Cluster SK Telecom South Korea operational 1,000* - - - - - -
Moore Threads KUAE 1,000-GPU Cluster Moore Threads China operational 1,000 - - - - - -
DGX SaturnV NVIDIA USA upgraded 992* - - - - - -
NEC AI Research Supercomputer NEC Japan operational 928* - - - - - -
Berzelius NSC Sweden operational 880 - - - - - -
Alvis C3SE Sweden decommissioned 880* - - - - - -
HammerHAI HLRS Germany under construction 860 plan - - - - - -
Vulcan (Amii) Amii Canada operational 820 - - - - - -
SAKURAONE SAKURA internet Japan operational 800 - - - - - -
Helma FAU Erlangen-Nuremberg Germany operational 768* - - - - - -
Alex (NHR@FAU) FAU Erlangen-Nuremberg Germany operational 752* - - - - - -
Killarney Vector Institute Canada operational 752 - - - - - -
Cambridge-1 NVIDIA United Kingdom operational 640* - - - - - -
fortytwo hessian.AI Germany operational 636* - - - - - -
RAIDEN RIKEN Japan operational 624* - - - - - -
DeltaAI NCSA USA operational 608 - - - - - -
TX-GAIN MIT Lincoln Laboratory USA operational 600 - - - - - -
Kempner AI Cluster Kempner Institute USA operational 528 - - - - - -
alpha ONE Aleph Alpha Germany operational 512* - - - - - -
BioHive-2 Recursion USA operational 504* - - - - - -
HiPerGator AI University of Florida USA operational 504* - - - - - -
Skipjack (JHU) Johns Hopkins University USA operational 492 - - - - - -
Mimer AI Factory NAISS Sweden under construction 400 plan - - - - - -
AI-Farabium Kazakhtelecom Kazakhstan operational 400* - - - - - -
AIST AI Cloud AIST Japan operational 400* - - - - - -
AICR MGHPCC USA operational 400 - - - - - -
Voyager SDSC USA operational 352* - - - - - -
PARAM Siddhi-AI C-DAC India operational 336* - - - - - -
ASPIRE 2A+ National Supercomputing Centre Singapore Singapore operational 320* - - - - - -
Cerebras Oklahoma City Cerebras USA operational 300* - - - - - -
fortythree hessian.AI Germany operational 280* - - - - - -
Redtail University of Utah USA operational 264* - - - - - -
DAIS MPCDF Germany operational 264* - - - - - -
GMO GPU Cloud GMO Internet Group Japan operational 256* - - - - - -
NeXXt AI Factory Fastweb Italy operational 248* - - - - - -
Freyja Amgen Iceland operational 248* - - - - - -
Marlowe (Stanford) Stanford University USA operational 248* - - - - - -
Kyber InstaDeep France operational 224* - - - - - -
Isambard-AI University of Bristol United Kingdom operational 168 - - - - - -
Gautschi AI Purdue University USA operational 160* - - - - - -
Grete GWDG Germany operational 144* - - - - - -
Bede N8 CIR United Kingdom operational 137* - - - - - -
MN-3 Preferred Networks Japan operational 128* - - - - - -
Mayo Clinic DGX SuperPOD Mayo Clinic USA operational 128* - - - - - -
Tokyo-1 Xeureka Japan operational 128* - - - - - -
ai& Tenstorrent Galaxy Supercluster ai& Japan operational 120 - - - - - -
Zhores Skoltech Russia operational 104* - - - - - -
SEIRAN Tokyo University of Technology Japan operational 96* - - - - - -
Cannon2-H200 Harvard FAS Research Computing USA operational 96* - - - - - -
Jairu USP CIAAM Brazil operational 96* - - - - - -
Serbia National AI Platform Office for IT and eGovernment of Serbia Serbia operational 80* - - - - - -
Condor Galaxy 1 Cerebras USA operational 64 - - - - - -
Condor Galaxy 3 Cerebras USA operational 64 - - - - - -
PakSupercomputer Namal Institute Pakistan operational 40* - - - - - -
IARA SiDi Brazil operational 25* - - - - - -
Cerebras Andromeda Cerebras USA operational 16* - - - - - -
Neocortex PSC USA operational 2* - - - - - -
EPCC Cerebras CS-2 Cluster EPCC United Kingdom operational 2* - - - - - -
LRZ Cerebras CS-2 LRZ Germany operational 1* - - - - - -
HOLL-I NCSA USA operational 1* - - - - - -
Wonder Valley AI Campus O'Leary Ventures Canada planned - - 7,500 plan 7,500 - - 70 plan
Project Jade (Cheyenne) Tallgrass Energy USA under construction - - 2,700 2,700 - - -
Meta Hyperion Meta Platforms USA under construction - 5,000 plan 2,260 5,000 - - 50
Poolside Project Horizon Poolside USA planned - - 2,000 plan 2,000 - - -
HUMAIN Project Halo HUMAIN Saudi Arabia planned - - 2,000 plan 2,000 - - -
Stargate Shackelford County (Frontier) Oracle USA under construction - - 1,400 plan 1,400 - - 25
Campus AI Fouju Campus AI France under construction - - - 1,400 - - -
Stargate Milam County SB Energy USA under construction - - 1,200 plan 1,200 - - -
Nebius Independence AI Factory Nebius USA under construction - - 1,200 plan 1,200 - - -
Stargate UAE G42 United Arab Emirates under construction - - 1,000 plan 1,000 - - -
Stargate Michigan (Saline Township) Oracle USA under construction - - 1,000 plan 1,000 - - 16
Stargate Port Washington (Lighthouse) Oracle USA under construction - - - 1,000 - - 15
Meta Lebanon (Indiana) Meta Platforms USA under construction - - 1,000 plan 1,000 - - 10
Meta El Paso (Texas) Meta Platforms USA under construction - - 1,000 plan 1,000 - - 14
Crusoe Abilene Campus (Microsoft) Crusoe USA under construction - - 900 plan 900 - - -
Stargate Project Jupiter (New Mexico) Oracle USA under construction - - - 900 - - 50 plan
IREN Childress Horizons 1-4 (Microsoft) IREN USA operational - 200 plan 750 plan 750 - - -
Killellan AI Growth Zone Argyll Data Development United Kingdom planned - - 600 plan 2,000 - - -
NEXTDC S7 Sydney AI Campus NEXTDC Australia planned - 550 plan - 550 - - -
Racks Central RCJM AI Campus Racks Central Malaysia under construction - - 510 plan 510 - - 6.7 plan
Delta Forge 1 (Rapides Parish) Applied Digital USA under construction - 300 430 430 - - -
Justified Data (Anthropic) Anthropic USA planned - 401 - 401 - - -
DataVolt Oxagon AI Campus DataVolt Saudi Arabia under construction - - 360 plan 1,500 - - -
River Bend (Fluidstack) Fluidstack USA under construction - 245 plan 330 plan 330 - - -
Nebius Lappeenranta AI Factory Nebius Finland under construction - - 310 plan 310 - - -
CoreWeave Lancaster AI Data Center CoreWeave USA planned - - - 300 - - 6 plan
Nebius Vineland (Microsoft) Nebius USA operational - - 300 plan 300 - - -
SoftBank Tomakomai AI Data Center SoftBank Corp. Japan under construction - - 300 plan 300 - - -
Bell AI Fabric Saskatchewan Bell Canada Canada under construction - - 300 300 - - -
Omnia Pecem (TikTok) Omnia Data Centers Brazil under construction - 200 300 200 - - 9.8
Cipher Black Pearl (AWS) Cipher Mining USA under construction - 216 300 300 - - -
Nebius Birmingham AI Factory Nebius USA under construction - - 300 300 - - -
CoreWeave Kenilworth (NEST) CoreWeave USA under construction - - 250 250 - - 1.8
Barber Lake (Fluidstack) Fluidstack USA under construction - 168 plan 244 plan 300 - - -
Polaris Forge 2 (Harwood) Applied Digital USA under construction - 200 plan - 200 1.18 plan - -
Abernathy (Fluidstack) Fluidstack USA under construction - 168 plan - 168 - - -
SoftBank Sakai AI Data Center SoftBank Corp. Japan planned - - 150 plan 400 - - -
USIO Synectics Technologies Uganda planned - - - 100 - - -
Cerebras Guyana AI Data Center Cerebras Guyana planned - - 100 plan 100 - - -
Khazna Ajman AI Data Center Khazna Data Centers United Arab Emirates under construction - 100 plan - 100 - - -
Opera Iceland KEF-1 SuperPOD Opera Iceland operational - - 83 - 1.2 plan - -
CoreWeave Cambridge (Cohere) CoreWeave Canada operational - - 64 64 - - -
Scala AI City Scala Data Centers Brazil planned - 54 plan - 4,750 1.2 plan 0 plan 0.5
du NextGenAI Supercluster du Telecom United Arab Emirates operational - - - 13 - - -
Nebius Iceland Cluster Nebius Iceland operational - 10 - 10 - - -
GroqCloud Kamloops Inference Cluster Groq Canada under construction - - 7 plan 7 - - -
Cerebras Montreal Inference Site (MTL-3) Cerebras Canada operational - 5 - 5 - - -
GroqCloud Sydney Inference Cluster Groq Australia planned - - 4.5 plan 4.5 - - -
Mila Sovereign AI Research Hub Hypertec Cloud Canada planned - 3 plan - 3 - - -
NVIDIA DGX SuperPOD (A100) NVIDIA USA operational - 0.1 - - - - -

A figure marked "est." is a third-party estimate and one marked "plan" is a design or announced target; unmarked figures are stated by the operator or taken from a filing, and where several exist the operator's is shown. * Accelerator count taken from the component graph's quantity, not a metric row. Claimed MW comes from the build pipeline table of operator-stated capacities.

Estimates marked "est." for several US campuses are from Epoch AI's AI data centers dataset, licensed CC BY 4.0.

What can be compared, and what it costs to

QuantityWhat it meansCaveat
AcceleratorsGPUs or other AI accelerators in the cluster or campus.Different accelerators are not interchangeable: a count says nothing about their speed or how they are connected.
IT powerElectrical load of the computing equipment itself, before cooling and conversion losses.Often conflated. A campus capacity is a design or contract figure, not what is drawn today.
Facility powerTotal power the site is built or contracted to draw, including cooling and losses.Often conflated. A campus capacity is a design or contract figure, not what is drawn today.
PUEPower usage effectiveness: facility energy divided by IT energy. 1.0 is the floor; lower is better.Operator-defined, often a fleet average, sometimes a design figure. Boundaries differ between companies.
WUEWater usage effectiveness: litres of water consumed per kWh of IT energy.Operator-defined, often a fleet average, sometimes a design figure. Boundaries differ between companies.
Stated investmentInvestment the operator or developer states for the campus or cluster.A stated programme size, frequently covering land, power and several phases.
Rack powerPower per rack of accelerators, a measure of density and of what cooling is required.Rarely disclosed; design values dominate.
Model FLOPs utilisationShare of the hardware's peak FLOPS that a reported training run actually used.Published for individual training runs in papers, not as a standing series per cluster.
Training goodputShare of wall-clock time spent making training progress, after failures, restarts and checkpointing.Published for individual training runs in papers, not as a standing series per cluster.

37 system-scale benchmark records (MLPerf, InferenceX and others) are on the benchmarks page. Both tables download as CSV: ai_datacenter_metrics, ai_benchmarks.