Supercomputers/Systems/NEMO bwForCluster
Germany · decommissioned · hpc
NEMO bwForCluster
Also known as bwForCluster NEMO
Operated by University of Freiburg at University of Freiburg HPC site .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 525.71 TFlop/s
- Rpeak
- 532.22 TFlop/s
- Rmax ÷ Rpeak
- 98.8%
- Cores
- 15,120
- Power
- 257.04 kW
- Per watt
- 2.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of NEMO bwForCluster, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 525.71 TFlop/s | #182 of 242 · bottom 26% | #60 of 95 · bottom 38% |
| Energy efficiency | 2.0 GF/W | #98 of 176 · bottom 46% | #45 of 68 · bottom 35% |
| Rmax ÷ Rpeak | 98.8 % | #1 of 238 · highest | #1 of 94 · highest |
| Power draw | 257 kW | #133 of 178 · bottom 26% | #45 of 69 · bottom 36% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - DALCO H88 cluster | DALCO | - | Reported | top500.org |
| CPU | - Intel Xeon E5-2630v4 10C 2.2GHz, 15,120 cores | Intel | - | Reported | top500.org |
| Interconnect | Omni-Path Architecture Interconnect Fat tree · 100 Gb/s per port · About 1 microsecond Intel Omni-Path | Cornelis Networks | - | Reported | top500.org |
Engineering, funding and access
What NEMO bwForCluster runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 900 nodesAfter the October 2017 extension of 152 nodes (66 for new shareholders); each node has 20 cores and 128 GiB | 2017-12 | Operator stated | bwhpc-c5.uni-freiburg.dear5iv.labs.arxiv.org |
| Total memory | 115 TB | 2017-12 | Operator stated | bwhpc-c5.uni-freiburg.de |
| Storage capacity | 750 TBBeeGFS grew 33 percent to 0.75 PB in 2017; the 2018 paper gives 768 TB usable | 2017-12 | Operator stated | bwhpc-c5.uni-freiburg.dear5iv.labs.arxiv.org |
| Interconnect and topology | Intel Omni-Path at 100 Gb/s between nodes; two 40 Gb/s uplinks to the university router, which reaches BelWue at 100 Gb/s | 2018 | Operator stated | ar5iv.labs.arxiv.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | BeeGFS parallel storage | 2018 | Operator stated | ar5iv.labs.arxiv.orgbwhpc-c5.uni-freiburg.de |
| Job scheduler | Moab (Adaptive Computing), with OpenStack separately scheduling virtual machines on the same nodes | 2018 | Operator stated | ar5iv.labs.arxiv.org |
| Programming and software stack | CentOS 7 on bare metal | 2018 | Operator stated | ar5iv.labs.arxiv.org |
| Programming and software stack | OpenStack virtual research environments, used by ATLAS and CMS groups with up to 9,000 virtual cores at peak | 2018 | Operator stated | ar5iv.labs.arxiv.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Baden-Wuerttemberg Ministry of Science, Research and the Arts, through the bwHPC grant | 2018 | Operator stated | ar5iv.labs.arxiv.org |
| Funded by | German Research Foundation (DFG), grant INST 39/963-1 FUGG | 2018 | Operator stated | ar5iv.labs.arxiv.org |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Shared bwForCluster used by 643 researchers from 7 universities between 2016 and 2024, producing about 660 publications; 66 of the 152 nodes added in 2017 went to new shareholder groups | 2024-09 | Operator stated | bwhpc.debwhpc-c5.uni-freiburg.de |
The read
bwForCluster NEMO at the University of Freiburg, a DALCO H88 cluster of Xeon E5-2630v4 10C 2.2GHz nodes on Intel Omni-Path for neuroscience, particle physics, microsystems engineering and materials science. TOP500 lists 15,120 cores, 0.53 PFlop/s Rmax and 257 kW and ranks it 215th in June 2016, 296th in November 2016 and 390th in June 2017. The Freiburg HPC newsletter of December 2017 reports an inauguration in August 2016 and an October 2017 extension of 152 nodes to 900 compute nodes and 18,000 cores, so the TOP500 figures describe the earlier size. bwHPC (https://www.bwhpc.de/832.php) says its successor NEMO2 replaced it on 26 September 2024.
Timeline
- 2016 First operational source
- 2016-06 Listed at #215 on the TOP500 (June 2016) source
- 2017-10 A final extension of 152 nodes, 66 of them for new shareholders, took NEMO to 900 nodes, 18,000 cores and 115 TB of memory, with BeeGFS storage up 33 percent to 0.75 PB source
- 2024-09 Decommissioned source
- 2024-09-26 The University of Freiburg put the successor NEMO2 into operation, replacing NEMO source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-11-08 NEMO bwForCluster marked decommissioned
- 2026-10-07 Added NEMO bwForCluster, a mid-list TOP500 system (2016-06 215)
Nearby in scale
The machines closest to NEMO bwForCluster by Rmax, smaller to larger.
- Airbus HPC4 · France, operational · 0.52 PFlop/s
- Armstrong (Navy DSRC) · USA, operational · 0.51 PFlop/s
- Porthos · France, operational · 0.51 PFlop/s
- SANAM · Saudi Arabia, operational · 0.53 PFlop/s
- Sky Bridge · USA, decommissioned · 0.53 PFlop/s
- Laconia · USA, operational · 0.54 PFlop/s
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Omni-Path Architecture |
| bwhpc-c5.uni-freiburg.de | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.